A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Walk-In Showers & Shower Remodeling in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
A finished backyard cottage with a small covered porch
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Walk-In Showers & Shower Remodeling in Plano, TX

A walk-in shower remodel in Plano typically runs $8,500 to $22,000 for a full tear-out and rebuild, and $3,200 to $7,800 for a tub-to-shower conversion on an existing drain location. The number moves most on what’s behind the tile: Plano’s slab-on-grade housing stock and the widespread use of greenboard behind 1990s shower surrounds decide whether we’re replacing a waterproofing layer or rebuilding one. We write the price down before anyone picks up a tool, which means you get that range narrowed to a single figure after we open the wall, not before.

Rowan Construction Group Plano treats a shower as a small building inside a wet room. The substrate, the membrane, the slope to the drain, and the curb all get named in the scope, in the same language the installer uses. Our technicians have up to 19 years of experience, and every one of them is background-checked and arrives uniformed. If you’re weighing a shower against a larger rebuild, our Bathroom Remodeling in Plano page covers the full-room picture, and the parent Bathroom Remodeling guide explains how the trades sequence together.

Call (844) 761-8346 and a live person answers, day or night. Estimates are free, and the written price comes with a written scope and a written warranty before the first demolition hammer swings.

Key Takeaways

  • Walk-in shower remodels in Plano run $8,500 to $22,000 for a full rebuild; tub-to-shower conversions run $3,200 to $7,800.
  • The most common failure we find in Plano showers built before 2005 is a failed pan liner behind a solid-looking curb.
  • Every project gets a flat written price, a written scope, and no work on a change until the change order is signed.
  • Documented photo record on every visit, included as standard, so you can see what the substrate looked like before it was covered.
A tile setter installing wall tile in a shower

When You Need Walk-In Showers & Shower Remodeling

Plano homeowners call us for walk-in shower work when the tile still looks fine and something underneath doesn’t. Here are the scenarios we see most.

  • The tile is tight but the grout line along the curb keeps cracking. A recurring crack at the curb-to-pan junction usually points to movement in the shower pan or a pan liner that was never sloped. Regrouting buys weeks; it doesn’t fix the slope.
  • You’re stepping over a tub wall you don’t trust anymore. A tub-to-shower conversion removes the 16-to-18-inch lip that makes a standard tub risky for an aging parent or a recovering knee. We keep the drain location and rebuild the floor and walls around it.
  • Water is wicking into the adjacent drywall. In Plano’s clay-heavy soil, slab movement occasionally opens a hairline at the shower base, and water finds it. Staining on the wall behind the shower, soft drywall at the baseboard, or a musty smell that doesn’t go away are all worth opening up.
  • You want a zero-threshold shower, which is a build decision, not a product. A true curbless shower requires the subfloor to be recessed or the floor built up, and the drain moved to the center. On a slab in Plano that usually means saw-cutting and re-plumbing the drain, which is exactly the kind of scope that changes a price. We price it before we start, not after.
  • You inherited a 1990s shower with greenboard behind the tile. Greenboard was never a waterproofing layer, and in showers built that way it has usually absorbed water by year fifteen. If the tile feels hollow or the grout darkens and won’t clean, the wall behind it is the reason.
  • You want a bench, a niche, and a seat-height showerhead in one build. Framing a bench changes how the pan is built because the bench sits over the liner. It’s a good thing to decide before demolition, and a bad thing to add after.

Our Walk-In Showers & Shower Remodeling Process

Every Rowan project runs the same way, because the ordering is what keeps the price honest. Below is the shower-specific version.

  1. Written price before demolition. We measure the shower, note the drain location, check the slope of the shower floor with a level, and look at what the adjacent wall is made of. You get a flat price with a written scope that names the membrane system, the tile brand, the drain, the valve, and the warranty in writing.
  2. Demo and substrate inspection. This is where the plan meets the house. On Plano slabs, we regularly find a cast-iron drain flange that has rusted through or a pan liner that was never pre-sloped. If we find either, we stop, show you the photograph, and write a change order. No work continues on the change until you sign it. That discipline is Clause 1 of The Haven Standard brought forward into the field, and it’s the reason projects finish within a few percent of the agreed number.
  3. Rough-in and waterproofing. We re-plumb the drain if it’s moving, set the valve at the correct depth for the new trim, and build the shower with a bonded waterproofing membrane that goes up the walls and across the pan as one continuous layer. The membrane is photographed before tile goes over it, so the record exists.
  4. Tile, grout, and trim. Floor tile goes down at the slope the drain needs, walls get set on a flat substrate, and the curb gets capped solid. We seal the grout and leave the care instructions with the written warranty.
  5. Final walk-through with the photo record. You get a documented photo record of every visit, not just the last one: the substrate, the membrane, the plumbing, the finished build. The same record goes into your file, and it’s what we pull out if you ever call us back under the 365-Day Done Right Promise.
A new front entry door with glass sidelights

Walk-In Showers & Shower Remodeling Pricing in Plano

Here are the honest ranges we work with in Plano. A written estimate narrows these to one number after we’ve measured, not a “starting at” figure.

Scope Typical range What moves the number
Tub-to-shower conversion, existing drain $3,200 – $7,800 Whether the drain stays put, tile grade, valve and trim brand
Full walk-in shower tear-out and rebuild $8,500 – $22,000 Substrate repair, membrane system, tile size and format, bench, niche, glass
Zero-threshold (curbless) shower $14,000 – $26,000 Slab saw-cut and re-plumb, linear drain, floor build-up, glass panel
Shower door and glass only $900 – $3,400 Frameless versus semi-frameless, size, hardware finish
Tile and valve refresh, no substrate work $2,800 – $6,500 Whether the pan liner is sound, tile removal method

Fixtures move the range more than most homeowners expect. A Kohler or Toto thermostatic valve and trim set typically runs $400 to $1,200 in parts, and the difference in feel and reliability is worth the line item. Tile runs $4 to $28 per square foot for the material alone, and a large-format tile in the shower pan is a stronger floor than a mosaic, but it has to be laid at the correct slope and it costs more in labor to get there.

Frameless glass is priced per panel and per hardware finish, and it’s the line item most likely to change the total. If you’re bringing a competitor’s quote, our Free Second Opinion offer reviews it line by line at no charge. We’d rather catch a membrane that wasn’t in the scope before you sign than after.

Call (844) 761-8346 for a free estimate. The written price is the whole offer, and it’s backed by the 365-Day Done Right Promise.

FAQs – Walk-In Showers & Shower Remodeling

How much does a walk-in shower remodel cost in Plano?

A walk-in shower remodel in Plano runs $8,500 to $22,000 for a full tear-out and rebuild, with the range tightening once we’ve opened the wall and seen the substrate. Tub-to-shower conversions run $3,200 to $7,800 because the drain stays put. Curbless showers push higher, $14,000 to $26,000, because a true zero-threshold build usually requires cutting the slab and re-plumbing the drain. Call (844) 761-8346 for a written price on your shower; estimates are free.

Can you convert my tub to a walk-in shower in Plano?

Yes, and a tub-to-shower conversion is the most common shower project we do in Plano. We keep the existing drain location where the slope allows, remove the tub, rebuild the floor and walls with a continuous waterproofing membrane, and set the valve at the correct height for a standing shower. The job usually takes three to five working days on site. Call (844) 761-8346 and we’ll write the scope before scheduling a start date.

Is a curbless shower worth it in a Plano home?

A curbless shower is worth it when there’s a real reason: an aging parent, a wheelchair or walker, or a mobility limitation. On a Plano slab-on-grade, a true curbless build requires saw-cutting the slab to recess the drain, which is why it prices above a curbed shower. If you don’t need zero threshold, a 4-inch curb with a wide, flat top and a well-sloped pan gives you most of the walk-in feel at a lower number, and we’ll quote both so you can compare. Call (844) 761-8346 for a written estimate on either.

What’s behind my shower tile, and why does it fail in Plano?

Behind the tile in most Plano showers built before 2005 is greenboard, a moisture-resistant drywall that was never designed as a waterproofing layer for a shower. It holds up for years and then fails, usually at the curb or at the base of the wall, and by the time the grout cracks the board behind it is already wet. A modern build uses a bonded waterproofing membrane over cement board or a foam shower system, applied as one continuous layer across the pan and up the walls. Call (844) 761-8346 and we’ll tell you what’s behind your tile before we quote the rebuild.

Fifty-Plus Brands, One Written Number

We source shower fixtures and finish materials across more than fifty vetted brands, and the reason is boring: it keeps the written price honest. When we quote a shower door or a valve, we aren’t locked to one distributor, and we aren’t quoting a premium product you can’t compare. Tile, glass, valves, and drain systems come from brands we’ve installed and seen hold up, and when a household wants a specific product we’ll say plainly whether it’s the right call for a wet room.

The result is a written price, a written scope, and a written warranty. A free second opinion on any competitor’s estimate, line by line. A 365-Day Done Right Promise, backed by The Haven Standard rather than a handshake. And a documented photo record on every visit, included as standard, so you can see the substrate, the membrane, and the plumbing before the tile went over them.

Rowan Construction Group Plano quotes the shower, builds the shower, and leaves you with the record of what we found and what we did. Call (844) 761-8346 for a free estimate, or reach out to a live person any hour of the day. Start with the home page if you’d like the broader picture of how a Rowan project runs.

Written by the team at Rowan Construction Group Plano, serving Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch