







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Plano
Kitchen remodeling in Plano typically runs $14,000 – $45,000 for a full gut renovation, with smaller partial remodels landing between $9,000 and $20,000. We quote a flat written price before anyone picks up a tool. If you live in Deerfield, Willow Bend, Russell Creek, or the newer infill around Legacy West, you already know most of the kitchens here are original builder-grade stock from the 1980s through the 2000s, and that changes how a remodel should be planned. Call (844) 761-8346 to schedule a free estimate.
Why Rowan Construction Group Plano Is Plano’s Preferred Kitchen Remodeling Company

Rowan Construction Group works under The Haven Standard, a written set of terms that puts the price on paper before any work starts and requires a signed change order before a project shifts scope. Under Clause 1, the number you agree to is the number you pay, and that discipline has kept our projects within a few percent of the agreed cost. Plano homeowners researching contractors the way they research appliances seem to appreciate that more than a sales pitch.
Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before arriving at your door. A live person answers calls 24/7, and every visit includes a documented photo record as a standard deliverable, not an optional add-on.
Plano’s building department and its HOA architectural review boards run tight. We know the difference between what the city requires on a permit and what a subdivision committee wants to see in a plan, and we build that lead time into the schedule instead of discovering it during demo.
If you already have a written estimate from another contractor, we will review it line by line at no charge through our Free Second Opinion offer. Plenty of Plano homeowners take us up on it before signing anything.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Plano
Our Kitchen Remodeling team handles the full scope, from the first layout sketch to the final walkthrough. The work below covers what Plano kitchens most often need.
Full Kitchen Remodeling
A full remodel in Plano means new cabinets, countertops, backsplash, flooring, and often a reworked layout, all quoted as one flat price with a written scope. Expect $14,000 – $45,000 depending on square footage and finish level. In a typical Plano kitchen remodel, the original builder-grade cabinets from a 1980s – 2000s tract home are often still serviceable but the doors, hardware, and countertops are due for replacement, so a qualified pro usually starts by checking the slab for levelness before setting new cabinets.
Cabinets & Countertops
Cabinet installation runs $4,000 – $13,000 and countertop installation $2,000 – $6,500. We source KraftMaid and Wellborn cabinets and Cambria and Caesarstone countertops, so the written quote carries honest numbers rather than inflated allowances. If your boxes are sound and only the doors and drawers are dated, refacing can save you several thousand dollars.
Backsplash, Tile & Flooring
Backsplash installation in Plano runs $800 – $2,500, and tile flooring is priced per the same written-scope approach. North Texas humidity swings matter here: a membrane under the tile and a properly sealed substrate keep grout lines from cracking through the year.
Kitchen Design & Layout
Layout work in Plano tract homes is usually about working with the existing plumbing and electrical rough-in rather than moving it, which keeps the project inside a written scope of work. When the layout genuinely needs to change, we price that change on paper before demo starts. A kitchen island installation runs $3,000 – $10,000 and often delivers the most usable square footage for the money.
Trusted Brands We Service in Plano
Our sourcing depth runs across more than fifty vetted brands, including KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, and Kohler and Toto fixtures. For exterior and site work tied to a kitchen addition, we draw on Oldcastle and Quikrete materials. We don’t stock parts locally or run a warehouse, so every material order is placed against your written scope and scheduled to the project timeline. That means no guessing at lead times and no surprise substitutions mid-job. If a specified slab or cabinet line is backordered, you hear it from us before the schedule slips, and the change order gets signed before anything moves.
Common Kitchen Remodeling Problems We See in Plano Homes
Plano is built out. Almost no greenfield construction is left, so kitchen work here is nearly always a remodel of master-planned tract housing rather than new building, and the problems that come up are consistent.
- Skipping the slab levelness check. The expansive black clay under Plano’s slab-on-grade subdivisions shrinks and swells with the wet-dry cycle, and cabinets set on an out-of-square run will bind. We check the slab before demo, not after, so a foundation correction doesn’t become a mid-project change order.
- Voiding a builder warranty. On newer homes near Legacy West, replacing cabinets or countertops can touch systems still covered by the original builder. We confirm what’s protected before the first cabinet comes out.
- Starting demo before permits and HOA review. Overlay subdivisions like Willow Bend and Deerfield require architectural review on top of the city permit, and that adds lead time. Pulling permits first keeps the job legal and the inspection clean.
- Working around an unresolved drainage issue. Water pooling against a Plano slab accelerates the movement that throws a kitchen out of level. When we find a grading problem during a remodel, we flag it and price the fix in writing rather than tiling over it.
See the difference
Before
After
Before
After
Before
AfterPricing for Kitchen Remodeling in Plano, TX

Here is what the numbers look like in Plano’s market. These are line-item ranges, quoted flat with a written scope and written warranty before work begins. Bring a competitor’s quote and we will review it line by line at no charge.
| Service | Typical Plano Range |
|---|---|
| Kitchen Remodel (full) | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
What pushes a Plano job toward the top of a range: moving plumbing or gas lines, foundation correction on a clay-soil lot, custom cabinetry versus semi-custom, and natural stone over quartz. What keeps it low: refacing sound cabinet boxes, keeping the existing layout, and choosing a standard backsplash tile. None of these are guesses. They are line items you approve in writing.
We Also Serve Cities Near Plano
Our independent local professionals also work in Richardson, Fairview, Lucas, and Allen. If you’re just outside Plano’s city limits, the foundation and permitting picture looks similar enough that the same sequence applies. Learn more about Kitchen Remodeling in Plano or the surrounding communities we cover.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Plano

Countertops and cabinet fronts deliver the largest visual change for the money. In Plano’s 1980s – 2000s tract homes, cabinet boxes are usually sound, so refacing plus new countertops and hardware can run well under a full remodel, often in the $4,000 – $13,000 range combined. Call (844) 761-8346 for an exact quote – estimates are free.
It can, if the work touches systems still under the original builder’s coverage. On newer Legacy West-area homes, we confirm what’s protected before demo and keep the scope clear of covered components where it matters. Call (844) 761-8346 to schedule a free estimate and we will review the warranty terms with you.
Interior-only work usually doesn’t trigger HOA review, but any change visible from outside or affecting structural envelope can. Overlay subdivisions like Willow Bend and Deerfield require architectural review on top of the city permit, and that adds lead time we build into the schedule. Call (844) 761-8346 for a free estimate.
Because Plano sits on expansive black clay that shrinks and swells, and an out-of-square slab will throw a cabinet run out of level and cause doors to bind. We check the slab before setting cabinets, not after. Call (844) 761-8346 for an exact quote – estimates are free.
Every allowance should be written into the estimate as a dollar figure, and no change should proceed until a change order is signed. That’s Clause 1 of the Haven Standard, and it’s why our projects finish within a few percent of the agreed price. Call (844) 761-8346 for a free estimate.
Ready for a Written Price on Your Plano Kitchen?
You have the ranges. You know what drives them. The next step is a real number for your kitchen, in writing, with a scope and a warranty attached. Our independent local professionals serve Plano with background-checked, uniformed technicians and a 365-Day Done Right Promise: if it is not done right, we make it right. Call (844) 761-8346 to schedule your free estimate.
Written by the team at Rowan Construction Group.












