A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Plano, TX

Bathroom Remodeling in Plano - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A garage converted into a guest room and home office
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Trusted Bathroom Remodeling for Plano Homeowners

Bathroom remodeling in Plano runs $9,000 – $28,000 for most full projects, and the number that matters is the one you get in writing before demolition starts. Our technicians, with up to 19 years of experience, work in a city where the housing stock tells a story: much of the west Plano build-out from the 1990s and early 2000s still has its original cultured-marble surrounds and oak vanities, and those materials hit the end of their service life right around now. A full bathroom remodel is a planned project, not an emergency, so we schedule it properly and quote it flat. Call (844) 761-8346 to start a free estimate.

Call (844) 761-8346

Under Clause 1 of The Haven Standard, the price is written before anyone picks up a tool. You get a flat number with a written scope, and no work proceeds on a change until the change order is signed. That discipline is why our projects finish within a few percent of the agreed cost. Every visit includes a documented photo record of what we found and what we did, sent to you, not kept in a file. The 365-Day Done Right Promise stands behind the finished room: if it is not done right, we make it right.

What Our Bathroom Remodeling Service Includes

A tile setter installing wall tile in a shower

We handle the full range of bathroom work, from a single vanity swap to a gut remodel of a primary bath. Here is what each service covers and when it makes sense.

Full Bathroom Remodeling

A full remodel replaces the wet zone top to bottom: tub or shower, tile, vanity, toilet, lighting, and often the exhaust fan and plumbing rough-in. You need one when the room has reached the point where patching is more expensive than replacing, or when the layout no longer works for how you actually use the space. We open the walls, inspect the substrate and any old water damage, and put the findings in your photo record before we quote the rebuild.

Walk-In Showers & Shower Remodeling

A walk-in shower trades a tub for a low-threshold or curbless entry with a proper sloped pan and a waterproof membrane behind the tile. It suits aging-in-place needs, busy households, and anyone tired of climbing over a tub apron. We build the pan to drain correctly, which is the part most failures trace back to, and we document the membrane and flood test so you know the waterproofing is real before the tile goes on.

Tub-to-Shower Conversion

This swaps an existing tub for a shower in the same footprint, which usually keeps the plumbing rough-in close to where it was and holds cost down. It is the right call when the tub gets used twice a year and the shower line is the bottleneck. We pull the tub, cap or reroute the drain as needed, and rebuild the surround with new waterproofing and tile.

Vanities

A vanity is the cabinet, the countertop, the sink, and the plumbing that ties them together, and a good one is measured to the inch against the wall and floor. You need a replacement when the cabinet box has swelled from moisture, the drawers have given out, or the counter has cracked at the sink cutout. We set KraftMaid and Wellborn cabinet lines and fit Cambria or Caesarstone tops with the sink cut in the shop, not on site.

Tile & Fixtures

Tile and fixtures cover the floor, walls, shower surround, faucets, and trim, and the visible quality of a bath comes down to how level the substrate is and how consistent the grout lines run. You need this work when grout is failing, tile is tenting or hollow, or the fixtures are dated and leaking. We set tile over a properly prepped substrate and fit Kohler and Toto fixtures, and we photograph the layout before setting to catch a bad bond before it cures.

Small Bathroom Remodels

A small bath remodel is the same work scaled to a powder room or hall bath, where every inch counts and storage has to be designed, not bought. It fits when the room is functional but tired, and you want new finishes without moving walls. We plan around the toilet stack and venting, which in Plano’s tighter hall baths often dictates where the vanity can actually go.

Walk-In Shower Installation

Walk-in shower installation differs from a remodel in that we are setting a new shower into a space, which may mean a new pan, new drain location, and a frameless glass enclosure. It is the move when you want a clean, open shower without the tub, and the room has the floor space for a proper entry. We measure the opening for the glass to the millimeter so the enclosure fits without a custom delay.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Brands We Service for Bathroom Remodeling

We work with KraftMaid and Wellborn cabinetry and know where each line wears: KraftMaid’s painted finishes hold up well in a dry bath but want a properly sized exhaust fan, and Wellborn’s plywood box construction handles the humidity swings of a Plano summer far better than particleboard. On the stone side, Cambria quartz is non-porous and forgiving in a shower-adjacent vanity, while Caesarstone gives you a wider color range and a consistent slab-to-slab match. For fixtures, we fit Kohler and Toto, and we know which of their toilets and faucets need a specific rough-in height so the trim lands correctly.

We are not a dealer and we don’t claim to be. What we do is install these brands correctly, with the right substrate, the right clearances, and the right waterproofing behind them, so a good cabinet or a good slab does not fail because of what was under it. Whether you have KraftMaid, Wellborn, or any other make in mind, we can help you spec it into a written scope with a flat price.

Signs You Need Bathroom Remodeling Right Now

  • Soft or spongy floor near the toilet or tub. That give is usually a failed wax seal or a slow leak that has been soaking the subfloor for months. If the subfloor is compromised, tile will crack no matter how well it was set, so the repair has to start below the finish.
  • Grout that crumbles or tile that sounds hollow. Hollow tile means the thinset lost its bond, often from moisture behind the wall. Left alone, the waterproofing is already breached and the fix grows with every season.
  • Persistent mustiness or a fan that never seems to clear the mirror. In a Plano bath with no window, a weak exhaust fan traps moisture and feeds mold in the wall cavity. A remodel is the moment to size the fan correctly and seal the envelope.
  • Water stains on the ceiling below. A stain under the bath usually points to a drain or supply leak in the shower pan or tub overflow. It is worth opening the ceiling and documenting the source before the damage spreads to framing.
  • A tub you can no longer step over safely. When the tub apron becomes a fall risk, a tub-to-shower conversion or walk-in shower is a practical safety upgrade, not a luxury. We build a proper curbless or low-threshold entry with grab-bar blocking in the walls.

Our Bathroom Remodeling Process – Step by Step

  1. 1
    Free in-home estimate and measurement. We measure the room, check the exhaust and venting, and note the substrate and any existing damage. You get a flat written price and a written scope before anything is ordered, not a ballpark.
  2. 2
    Written scope and material selections. We sit down with the plan and your picks: cabinet line, stone, tile, fixtures. The quote reflects the real materials so the number does not move later, and you can bring a competitor’s estimate for a free line-by-line second opinion.
  3. 3
    Permits and protection. We pull the plumbing and electrical permits the work requires under Plano’s adopted building code, then protect the rest of the house with floor cover and plastic dust barriers. Inspections are scheduled and passed before we close up the walls.
  4. 4
    Demolition, rough-in, and waterproofing. We remove the old finishes, inspect and photo-document what is behind the wall, then do the plumbing and electrical rough-in. Before any tile goes down, we install the shower membrane and flood-test it, and that test goes in your photo record.
  5. 5
    Finish, walkthrough, and photo record. Tile, cabinets, stone, fixtures, and glass go in, followed by a walkthrough where we note any punch items and schedule the fix. You get the full documented photo record of the job and the written warranty, and the 365-Day Done Right Promise covers the work after we leave.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Bathroom Remodeling Cost in Plano?

A new front yard fence with a matching gate

A typical full bathroom remodel in Plano runs $9,000 – $28,000 depending on the size of the room, whether walls move, and the level of tile and stone you choose. A small bathroom remodel comes in at $5,000 – $12,000. A walk-in shower installation is $4,500 – $12,000, a tub-to-shower conversion is $3,500 – $10,000, and a shower replacement alone is $3,000 – $8,500. A vanity installation runs $800 – $3,000.

Bathroom service in Plano Typical price range
Full bathroom remodel $9,000 – $28,000
Small bathroom remodel $5,000 – $12,000
Walk-in shower installation $4,500 – $12,000
Tub-to-shower conversion $3,500 – $10,000
Shower replacement $3,000 – $8,500
Bathroom vanity installation $800 – $3,000

What moves the price most is whether the layout changes, since moving a drain or supply line means opening more wall and pulling a permit for the rough-in. Tile and stone selections are the second big lever: a standard porcelain floor and a framed glass door sit at the low end, while large-format tile, a frameless enclosure, and a natural stone top push toward the top of the range. You avoid overpaying by getting the full written scope up front so no line is added after the fact, and by checking that waterproofing and permit fees are explicitly in the quote rather than hidden as extras. Your free estimate includes the measurement, the written scope, the flat price, and the material list, with a second-opinion review if you want one.

Bathroom Remodeling Near Plano – Our Service Area

We take bathroom remodel work across Plano and the surrounding cities: Richardson, Allen, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. Our crews reach most Plano addresses and nearby towns on a scheduled basis, and we quote the same flat written price whether you are in Willow Bend or Murphy. If you are just outside this list, call and we’ll tell you straight whether we cover the address. Homeowners comparing service areas often start with our Bathroom Remodeling in Richardson page or see the full trade list from our home page.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions – Bathroom Remodeling in Plano

A new paver pool deck

Schedule Your Bathroom Remodeling Service in Plano Today

Call (844) 761-8346 to schedule your free bathroom remodeling estimate in Plano. You’ll get a flat written price, a written scope, and a material list before anyone starts, and a live person answers around the clock. There’s no obligation and no pressure to sign. If you’re also planning exterior work, see our Bathroom Remodeling in Allen page, and ask us to fold a driveway or Driveway & Pavers quote into the same visit. We also handle Fence Installation, Home Additions & ADU, and Windows & Doors under the same written-price standard. Bring a competitor’s estimate and we’ll review it line by line at no charge.

Written by the team at Rowan Construction Group.

Why Plano Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaNew painted shaker cabinets with an organized deep drawer

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Plano?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Plano.

(844) 761-8346

Request a Free Estimate in Plano

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch