A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Plano, TX

Bathroom Remodeling in Plano - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Plano

If you’re pricing a bathroom remodel in Plano, the honest answer is that most full baths land between $9,000 and $28,000, and the number you get in writing should reflect what’s actually under your floor before anyone quotes a tile price. We know Plano – the Deerfield streets off Legacy, the Willow Bend lots where builder-grade everything is now twenty years old, the Russell Creek homes where a cracked shower pan usually means the slab moved, not that the tile failed. That knowledge changes the quote. Call (844) 761-8346 and we’ll put a written price in front of you before any work begins.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Plano’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Plano is a built-out suburb. Almost no raw land left, so the work here is renovation, teardown-rebuild, and upgrading tract housing from the 1980s through the 2000s – not new construction. That distinction matters for a bathroom, because the systems inside those homes are hitting end-of-life at roughly the same time. We quote flat written prices on every visit, with a written scope and written warranty, and no change proceeds without a signed change order. That’s Clause 1 of the Haven Standard, and it’s why projects finish within a few percent of the number the customer agreed to.

Response time to Plano is quick – we schedule Plano estimates around your week, and a live person answers calls 24/7, not a voicemail box. Our technicians have up to 19 years of experience, are background-checked and uniformed, and leave a documented photo record on every visit as a standard deliverable. Bring a competitor’s written estimate and we’ll review it line by line at no charge – a Free Second Opinion, no strings. It’s the reason Plano homeowners who read the three-star reviews first tend to call us second.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in Plano

Every scope below is priced before a tool comes out. If you want the full menu of what the Bathroom Remodeling team handles, that page covers it trade by trade.

Full Bathroom Remodeling

A gut remodel in a Plano slab-on-grade home runs $9,000 – $28,000, and the first thing we check is the floor and the shower pan. Plano’s expansive black clay shrinks and swells with the wet-dry cycle, and on slab foundations that movement shows up as cracked tile or a drain that won’t sit level. If the slab has moved, we say so before we quote tile, and the fix is a foundation correction, not a cosmetic patch.

Walk-In Showers & Shower Remodeling

A walk-in shower installation in Plano typically runs $4,500 – $12,000 depending on size, glass, and whether the drain needs relocating. We build the pan on a stable substrate with a proper moisture barrier – not a mastic-and-tile shortcut – because North Texas humidity finds every weak point in a shower assembly.

Tub-to-Shower Conversion

Tub-to-shower conversions run $3,500 – $10,000 in Plano and are the single most requested change we quote in Willow Bend and Russell Creek homes, where the original tub is now twenty-five years old. We handle the rough-in, the waterproofing, and the permit, then schedule the inspection so the job doesn’t sit half-finished.

Vanities, Tile & Fixtures

Vanity installation lands at $800 – $3,000, and tile and fixture work is priced within the remodel range. We set vanities to the space, not a catalog photo, and we specify fixtures rated for a humid bathroom – tile and glass that hold up under Plano’s summer moisture, not builder-grade parts that pit in a season.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Plano

We work with a documented list of fifty-plus vetted material brands, and the ones that make sense for a Plano bathroom are the ones that survive the climate and hold their finish. On the substrate and masonry side that includes Oldcastle and Quikrete products where a mortar bed or setting material is specified; we don’t carry stock, so there’s no upcharge for a part sitting on a shelf. We quote the brand and the spec in writing, so you see exactly what’s going into the wall – not a generic tile allowance that gets marked up later. Fast turnaround on materials, no warehouse middleman.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Bathroom Remodeling Problems We See in Plano Homes

  • Skipping a foundation check before tile goes down. In Plano’s slab-on-grade subdivisions, a cracked floor or a shower pan that won’t drain is often slab movement, not failed tile. Install new finishes over a moving slab and you’ll be looking at cracks within a year.
  • An incomplete architectural review packet. Plano’s HOA overlays and city review want a specific submittal – materials, colors, elevations, sometimes fixture specs. A partial packet means weeks of delay and a half-finished bathroom waiting on committee sign-off.
  • Builder-grade materials in a humid bathroom. Plano’s humid summers punish a bathroom without proper exhaust. Fixtures and finishes meant for a dry climate fail early here; we specify for the moisture, and we check the ventilation while we’re in the walls.
  • Permits pulled after the fact. Plano’s permitting is strict, and a remodel done without the right inspection creates a problem at resale. We pull the permits and pass the inspections, and the paperwork is part of the job.

Pricing for Bathroom Remodeling in Plano, TX

A standing-seam metal roof over a covered porch

Here’s the honest range for a Plano bathroom, in dollars you can screenshot and compare. A flat written price comes before any work starts – the quote is a scope and a warranty, not a “call for a quote.” What moves the number is the substrate (whether the slab needs correction first), the size and glass in a shower, and the fixture tier. Foundation corrections are quoted separately and honestly, because hiding one in a tile price helps nobody.

Service Typical Plano Range
Bathroom Remodel (full) $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Bathroom Vanity Installation $800 – $3,000

Estimates are free and the written price is fixed. Under Clause 1 of the Haven Standard, no work proceeds on a change until the change order is signed – so the number you agree to is the number you pay, within a few percent across the project. Call (844) 761-8346 for an exact quote.

We Also Serve Cities Near Plano

We work throughout the northern metro, so if you’re just outside Plano – Richardson, Fairview, Lucas, or Allen – we can schedule a free estimate there too. The same clay-soil reality and the same review process apply across these towns, which is why the Plano approach travels well. See Bathroom Remodeling in Plano for the full local scope.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in Plano

A new bay window with a cushioned seat

Why Plano Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled kitchen with a waterfall island and wood cabinetsA finished backyard cottage with a small covered porchA new roof with clean valleys and new flashing

More services in Plano

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Plano?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Plano.

(844) 761-8346

Request a Free Estimate in Plano

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch