







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Roofing for Plano Homeowners
Plano roofs take a specific kind of punishment. Summer afternoons push attic deck temperatures past 150°F, and the freeze events of recent winters cycle that heat stress with ice. The result is what our technicians find most often in older Plano subdivisions: granule loss on south-facing slopes, hairline fractures around pipe boots, and wind-lifted ridge caps that open a path for water the next time it hails. Our technicians bring up to 19 years of experience to every roof inspection, and we put our findings in writing with a photo record before anyone quotes a repair. If you’re seeing a stain on a ceiling or shingles in the yard, call (844) 761-8346. We’ll schedule a free inspection and give you a flat written price.
What Our Roofing Service Includes

Roofing covers everything above the top plate of the wall: the deck, underlayment, shingles or tiles, flashing, ridge and soffit ventilation, and the gutters that carry water away from the foundation. Under Clause 1 of The Haven Standard, every job begins with a written scope and a written price. No work starts until you have both. Here’s what we handle across Plano.
Roof Repair
Roof repair addresses a localized failure without replacing the whole roof: a cracked shingle field, a failed pipe boot, a separated step flashing against a chimney, or a wind-torn ridge. You need it when a leak is confirmed but the surrounding field has years of service left. We open the area, photograph the deck and underlayment, replace what’s failed to the correct layer count, and leave you with the images. Most Plano roof repairs run $400 – $1,800.
Roof Replacement & Installation
A full replacement pulls the existing material down to the deck, inspects and repairs sheathing, installs new underlayment and flashing, then lays the new field. You need replacement when granule loss, curling, or repeated leak history means patching just moves the problem. We install GAF and Owens Corning systems and quote the shingle line, ridge, drip edge, and ventilation as separate written line items so you can see where the money goes. Typical Plano replacement: $8,000 – $20,000.
Metal Roofing
Metal roofing is a panel system, usually steel or aluminum, fastened to the deck with concealed clips or exposed fasteners and finished with factory coatings. It suits Plano homeowners who plan to stay in the house and want to stop replacing shingles every 15 to 20 years. We install standing seam, which keeps fasteners hidden and lets panels expand and contract through Texas heat without backing out. Metal roof installation in Plano runs $15,000 – $40,000 depending on panel type and roof complexity.
Tile Roofing
Tile roofing – clay or concrete barrel profiles, and the flatter profiles common on Spanish-revival homes – sits over a batten system or a mortar bed on a membrane. You need tile repair when a broken tile opens the underlayment to water or a valley starts leaking at the mortar joint. We replace broken tiles from a matched stock, reseat slipped pieces, and address the membrane beneath, not just the visible surface. Tile roof repair in Plano runs $600 – $2,500.
Specialty Roofing
Specialty roofing covers the low-slope and non-standard sections most homes have somewhere: patio covers, porch roofs, bay windows, and garage extensions often fall below the pitch minimum for standard shingles. You need it when those sections leak and a standard shingle repair won’t hold. We install low-slope membrane systems and coordinate the transition flashing where the low-slope ties into the main roof, which is where leaks concentrate.
Gutters & Accessories
Gutters carry roof runoff away from the foundation, and in Plano that matters because our clay-heavy soils swell after rain. You need gutter service when water sheets past the downspouts, seams open, or a single downspout serves too much roof area. We install, repair, and re-slope gutter runs, sized to the square footage of the roof they serve, and we add leaf protection where pecan and oak debris load them.
Emergency & Storm Damage
Storm damage – hail, wind uplift, or impact from a fallen branch – needs an immediate inspection, an honest condition report, and a written scope for repair. You call when water is entering or a section of roof is exposed. We document the condition with photos before any tarping or repair begins, which is the record your insurer will ask for, then give you a written price for the permanent fix.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Roofing
Most of the roofing hardware on Plano homes comes from a small number of manufacturers, and knowing how each one ages tells you where to look first. Owens Corning shingles are common on 2000s-era builds in Plano, and we know the ridge caps and pipe boots on their systems are often the first things to fail, not the field itself. GAF offers several shingle lines, and we service all of them, matching layer counts and warranties so a repair doesn’t void the original roof. For gutter and edge materials, we work with established manufacturer lines and match the drip edge profile that’s already on the house.
Whether your Plano home has Owens Corning, GAF, or any other make of shingle or roofing material, we can help. We read the existing system first, tell you what’s failing, and quote the repair or replacement in writing.
Signs You Need Roofing Right Now
- Shingle granules in the gutter and downspout splash. Granules are the sun-proofing layer on a shingle; when they’re washing off in volume, the asphalt underneath is exposed and aging fast. If you’re sweeping grit up after every rain in Plano, it’s worth an inspection this season.
- A brown or yellow stain on a ceiling or wall. That stain means water is already through the deck. The source could be a pipe boot, flashing, or a field failure, and the only way to know is to open the area and look. Left alone, a small leak rots sheathing and grows the repair.
- Curling, cracking, or missing shingles. Lifted or torn shingles are a wind signature, and one missing shingle on a slope lets water under the neighbors. We see this on ridge lines after Plano windstorms, and it’s a cheap fix before the next rain.
- Sagging roof deck or soft spots on the roofline. A sagging deck means the sheathing below has taken on water and may be failing. This isn’t a cosmetic issue – it’s structural and needs to be looked at before the next storm.
- Daylight or a draft at the attic ceiling. Sunlight through the roof deck is an open path for water and heat. It usually points to a hole at a vent, chimney, or skylight – all of which we can inspect and photograph before quoting the repair.
Our Roofing Process – Step by Step
Every job starts the same way: we look first, we write it down, and only then do we quote. Here’s the sequence you’ll see in Plano.
- 1
Inspection. We get on the roof or into the attic (or both) and document the condition – shingle layer count, condition of the deck and underlayment, state of the flashing at chimneys and valleys. We photograph what we find and share the images with you, so you can see the same thing we’re seeing.
- 2
Written scope and flat price. We write out exactly what we’ll do – materials, brand, layer count, area replaced – and put a flat price next to it before any work starts. No “call for a quote,” no ballpark on a napkin.
- 3
Materials and scheduling. Once you approve the written price, we schedule the work and, where the job requires a permit, pull it before we touch the roof. You get the inspection passed at the end, not a promise to get it later.
- 4
The work. We protect landscaping and driveways, tear down to the needed layer, repair any deck damage we found in inspection, and install to the manufacturer’s specification. If a hidden problem shows up mid-job – soft sheathing, a rotted rafter – we stop and write a change order for your signature before continuing. No change order, no work on that change.
- 5
Close-out and photo record. We walk the finished roof with you, hand over the photo record of the work, and the written warranty. Under the 365-Day Done Right Promise, if something isn’t right within the first year, we make it right.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Roofing Cost in Plano?

Roofing prices in Plano depend mostly on roof pitch, square footage, layer count, and whether the deck needs repair underneath. A roof repair runs $400 – $1,800 for a localized failure like a pipe boot, flashing, or small shingle field. A full roof replacement runs $8,000 – $20,000 for a typical Plano home on architectural shingles, and metal roof installation runs $15,000 – $40,000 depending on panel type and the complexity of valleys and hips. Tile roof repair runs $600 – $2,500 per affected area.
What drives cost up: complex roof geometry with many valleys and hips, multiple layers of existing shingles to tear off, and any deck repair found during tear-down. What keeps it down: doing repairs before the leak spreads, choosing a shingle line that fits the roof’s expected remaining life, and addressing ventilation when you replace so you’re not re-doing the attic deck in five years.
Here’s what a free estimate from Rowan includes:
- A written, flat price with a written scope for every line item – tear-off, underlayment, shingles or panels, flashing, ventilation, and cleanup.
- A photo record of the condition we found, so you know what’s being priced and why.
- A written workmanship warranty, not a verbal promise.
- A free second opinion if you have another contractor’s written estimate – we’ll review it line by line at no charge.
We quote a flat price with the scope, not a range you find out is wrong after the roof is open. If the number changes, it only changes because you signed a change order.
Roofing Near Plano – Our Service Area
We serve Plano and the surrounding Collin and Dallas County cities: Richardson, Allen, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. Response times vary by job, and we schedule inspections to fit your week. If you’re nearby, you can read more about our Plano service area, our Richardson service area, or our Allen service area.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Roofing in Plano

Roofing is the roof system that keeps water out of your house: the deck, the underlayment, the shingles or panels, the flashing around penetrations, and the ventilation that keeps the attic dry. In Plano, roofing also has to handle intense summer heat and freeze cycles, which is why underlayment and flashing matter as much as the shingles. We inspect the whole system, not just the surface, so the repair addresses the actual source.
A typical Plano shingle roof replacement takes one to three days on a standard single-story home, and two to four days on larger or multi-story homes with complex geometry. Weather can push the schedule – we don’t tear off when rain is coming. If we find deck damage mid-job, we write a change order and get your signature before continuing, which can add a day.
Roof repair in Plano runs $400 – $1,800, roof replacement runs $8,000 – $20,000, metal roof installation runs $15,000 – $40,000, and tile roof repair runs $600 – $2,500. The exact number depends on roof size, pitch, layer count, and what’s underneath the shingles. Call (844) 761-8346 for an exact quote – estimates are free and written.
Yes. Owens Corning and GAF are two of the most common shingle systems on Plano homes, and we service both. We match layer count and warranty terms so a repair doesn’t void what’s left of the original roof. Whether your Plano home has Owens Corning, GAF, or any other make, we can help.
Roof leak repair addresses an active leak – we inspect, document the condition with photos, and stop the water from spreading, then give you a written price for the permanent fix. You can call (844) 761-8346 and reach a live person, day or night. We don’t promise a same-hour arrival, but we take the call, get an inspection scheduled, and quote the repair in writing before anything permanent is done.
Every roofing job from Rowan comes with the 365-Day Done Right Promise and a written workmanship warranty. If it’s not done right within the first year, we make it right. The warranty is written into the scope you sign, and you get it in hand at close-out along with the photo record.
Move vehicles out of the driveway, clear breakable items from the garage walls (the crew will be up and down ladders), and clear the attic of anything fragile. Expect noise and some dust, and keep pets and kids inside while the tear-off is happening. We’ll confirm the schedule and staging area before we start. Call (844) 761-8346 to walk through the details with us; the estimate is free.
Schedule Your Roofing Service in Plano Today
Every roofing project we take on in Plano starts with a free inspection, a written scope, and a flat price before a single shingle moves. Under the 365-Day Done Right Promise, if it’s not done right, we make it right. Call (844) 761-8346 to schedule your free estimate, and if you’ve got another contractor’s quote, we’ll give you a free second opinion on it, line by line. A live person answers, and every visit comes with a photo record.
Written by the team at Rowan Construction Group.












