A Rowan company - serving Plano, TX
A backyard with a new horizontal privacy fence
Fence Installation · Plano, TX

Fence Installation in Plano - Free On-Site Quote, HOA Approval Handled

We locate the property line, pull the permit, and handle HOA approval before a post goes in. Written price per foot, quoted on site, with no add-ons at the end.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new front yard fence with a matching gate
A new black aluminum pool fence with a gate
A new bay window with a cushioned seat
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
A garage converted into a guest room and home office
New architectural shingles with a clean valley
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Trusted Fence Installation for Plano Homeowners

A fence is one of the few things on your property that has to hold a straight line for a decade in North Texas clay soil and July heat. When that line starts to lean, or when a builder-grade cedar fence finally gives out after 10 – 15 years of seasonal movement, the fix is rarely a repair. It’s a full replacement. Rowan Construction Group Plano installs wood, vinyl, aluminum, wrought iron, and chain link fencing across Plano with written pricing before any post goes in the ground, and our technicians bring up to 19 years of experience to the build. Every project comes with a documented photo record and the 365-Day Done Right Promise. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

What Our Fence Installation Service Includes

We quote each type of fence on its own line with a written scope, a flat price, and a written warranty. What follows is how each sub-service works in Plano specifically.

Wood Fence

Cedar and treated pine privacy fencing is the dominant fence in Plano, most of it capped at 6 feet in residential zones and often required to be 8 feet on arterial-facing lots. We set posts in concrete below the frost line equivalent Plano’s expansive clay demands, which is deeper and with a wider concrete collar than most builder installs. If your current fence is leaning or the planking is cupping, we’ll show you photos of the post base and tell you plainly whether it’s a rebuild or a replacement.

Wood Fence

Chain Link Fence

Chain link is the practical choice for larger Plano lots, pool enclosures, and side-yard runs where privacy isn’t the goal. We install galvanized and vinyl-coated chain link with tension wire, top rail, and proper terminal post bracing at every corner and gate. It’s the least expensive way to enclose a yard and the most likely to still be standing in 20 years with a single post repair along the way.

Chain Link Fence

Vinyl Fence

Vinyl fencing in Plano runs $3,500 – $9,000 for a typical yard and handles the humidity far better than wood, with no paint, no staining, and no rot. We use vinyl systems with internal aluminum or steel reinforcement in the rails, not hollow extrusions that sag in the summer sun. It’s the right fence if you want to stop thinking about your fence, and the wrong one if your HOA has a stylistic restriction, which many Plano subdivisions do.

Vinyl Fence

Aluminum Fence

Aluminum fencing runs $4,000 – $10,000 and is what most Plano homeowners choose when they want the look of wrought iron without the rust and weight. We install rackable and non-rackable aluminum systems with powder-coated finishes, and we set posts with proper spacing for grade changes so rails follow the slope rather than stair-stepping. Pool-code aluminum is also available where the barrier has to be at least 48 inches with self-closing, self-latching gates.

Iron Fence

Wrought iron fencing adds a permanent, ornamental boundary that holds up for decades, and it’s common on larger Plano lots, corner properties, and gated driveways. We work with welded and ornamental iron panels, set posts to true grade, and finish with a rust-inhibiting coating. Because iron is heavy and requires precise post anchoring in our clay soil, this is a fence type where a careful install matters more than the material itself.

Fence Repair

Not every fence needs to come down. A single rotted post, a broken gate hinge, or a section of chain link pulled loose by a dog is a repair, and we quote it as one with photos showing what we found. We’ll tell you when a repair buys you five more years and when the money is better spent on replacement, in writing, with the numbers side by side.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Brands We Service for Fence Installation

We quote and install fencing systems from ActiveYards for vinyl and aluminum, and we understand how their extrusion profiles behave through a full Plano summer and a freeze-thaw cycle. Recognized vinyl fencing brands like ActiveYards build their panels around reinforced rails and UV-stabilized material, which is where the difference between a fence that looks new at year eight and one that’s yellowed and sagging shows up.

For gates, hardware, and ornamental metal, we spec components that stand up to heat and clay movement, and for hardscape-backed fencing (fence lines meeting Belgard and Unilock paver borders on driveways and patios) we route the transition so the pavers and posts don’t fight each other. Whether you have ActiveYards, Belgard, Unilock, or any other make already on the property, we can match the run or replace it cleanly. If you need the fence line tied back into a paver driveway, our home page lays out the full seven-trade scope.

Signs You Need Fence Installation Right Now

  • Leaning or loose posts. A single leaning post is a repair; a run of four or more means the concrete footings have failed and the whole line will keep going down. In Plano’s black clay, water pooling along a fence line speeds this up dramatically after a wet spring.
  • Post rot at the soil line. Push a screwdriver into the base of a post. If it sinks more than a quarter inch, the post is gone below the surface no matter how solid it looks above. This is the most common failure we find on cedar fences past their tenth year.
  • Cupping, splitting, or missing pickets. Once planking starts cupping, the wood is holding moisture and the integrity is already compromised. Patched pickets on a failing frame tend to come loose within a season.
  • A gate that won’t stay square. Sagging gates almost always trace back to post movement, not the hinge. Hinge replacement on a moving post just delays the real fix.
  • HOA notice or a failed pool inspection. Many Plano HOAs require fencing at a specific height, style, and material, and pool barriers have their own code requirements. A notice gives you a deadline; a replacement done correctly clears both at once.

Our Fence Installation Process – Step by Step

  1. 1
    On-site walk and measurement. We measure the full run, note grade changes, locate the property line, and photograph existing conditions including post bases and any rot. You get a written scope and a flat price before anything is ordered or dug.
  2. 2
    Written price and layout. Under Clause 1 of the Haven Standard, the price is written before any work starts. We confirm fence height against your HOA and city requirements and set post spacing on the layout.
  3. 3
    Post setting. Posts go in with the depth and concrete collar Plano’s soil calls for, with the line set true. This is the step that determines whether your fence is straight in year ten, and it’s the one most builder installs skip to save time.
  4. 4
    Panel and rail installation. Rails, planking, and panels go up with the gate framed on-site for a square fit on the actual opening, not a pre-manufactured gate dropped into an uneven one. We photograph the completed run, hardware, and gate swing.
  5. 5
    Walkthrough and documented record. We walk the job with you, hand over the written warranty and the photo record of what was found and what was done, and make sure the gate latches before we leave. Any change to the scope along the way requires a signed change order first.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Fence Installation Cost in Plano?

A new stained cedar privacy fence

A typical fence installation in Plano runs $3,500 – $9,000, with vinyl at the low-to-mid end and aluminum or ornamental iron pushing toward the top of that range. A standard 150- to 200-foot residential privacy run in cedar lands in the middle of that band. Concrete footings, gate hardware, removal of the old fence, and grade changes are the factors that move the number most.

What drives cost up or down:

Scope Typical Plano range
Vinyl fence installation $3,500 – $9,000
Aluminum fence installation $4,000 – $10,000
Wood privacy fence (per typical run) Quote-based, in the lead range above

How to avoid overpaying: insist on a written flat price with the fence height, material, post depth, and gate count spelled out, and get the old-fence removal in the same quote. A verbal number that grows once digging starts is the trap. Every Rowan estimate is a free, written, line-item price, and if you already have a competitor’s quote, our Free Second Opinion reviews it line by line at no charge. Call (844) 761-8346 for an exact quote – estimates are free.

Fence Installation Near Plano – Our Service Area

We install fencing across Plano and out into the surrounding communities: Richardson, Allen, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. Scheduling is confirmed by text, and for nearby neighborhoods the wait is usually short. If you’re comparing options, see our Fence Installation in Richardson and Fence Installation in Allen pages for local details, or our Fence Installation in Plano overview for the full scope.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions – Fence Installation in Plano

A freestanding soaking tub in a remodeled primary bathroom

Schedule Your Fence Installation Service in Plano Today

Fence work is straightforward when the price is written and the posts are set right. That’s what you get from Rowan Construction Group Plano: a flat written price, a photo record of the work, and the 365-Day Done Right Promise behind it. Call (844) 761-8346 for your free, no-obligation estimate – and bring a competitor’s quote if you have one.

Written by the team at Rowan Construction Group.

Why Plano Chooses Rowan Construction Group Plano

We set the standard for fence installation in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your fence installation project started is simple.

1

Call or Request a Free Estimate

Tell us about your fence installation project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local fence installation pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A finished backyard cottage with a small covered porchA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patio

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Fence Installation in Plano?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Plano.

(844) 761-8346

Request a Free Estimate in Plano

Tell us about your fence installation needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch