Trusted Driveway & Pavers for Plano Homeowners
Most Plano driveways we look at fail for one reason: the slab was poured over black clay that expands when it rains and shrinks when it doesn’t. That movement cracks concrete, drops pavers into dips, and pulls seams apart at the garage apron. We rebuild driveways on a properly compacted, moisture-controlled base so the surface above it stays flat through Texas summers and freeze-thaw winters alike. Our technicians bring up to 19 years of experience, and our written price lands before anyone picks up a tool. Whether you need a full paver driveway or one cracked panel replaced in Willow Bend, we document what we found, show you the photos, and quote a flat number. Call (844) 761-8346 to schedule a free estimate.
What Our Driveway & Pavers Service Includes
Paver Driveways
Paver driveways use individual clay or concrete units set in a compacted sand bed, which means a crack stays a crack instead of spreading across the whole slab. You need one when curb appeal matters, when a cracked concrete driveway keeps returning after patching, or when you want a surface you can pull up and reset rather than demolish. We set Belgard and Tremron pavers over a layered base, cut edges with a wet saw rather than snapping them, and leave you a photo record of the base prep before the sand goes down.

Concrete Driveways & Concrete Work
A poured concrete driveway is the standard choice across Plano subdivisions like Deerfield and Russell Creek, and it comes down to how the slab is reinforced and jointed. You need concrete work when your existing slab has settled, when standing water pools against the garage, or when tree roots have lifted a section into a trip hazard. We pour with rebar, control joints at the right spacing, and a proper slope away from the foundation, then pull the permits the City of Plano requires for the approach apron.

Asphalt Driveways & Resurfacing
Asphalt driveways cost less up front and handle minor movement better than concrete, which is why some Plano homeowners choose it for longer runs from the street. You need resurfacing when the surface has gone chalky, shows hairline alligator cracking, or has lost its top layer to sun and traffic. We mill or patch the failed areas first, then lay a fresh hot-mix overlay, because sealing over a cracked base just hides the problem until the next summer.

Driveway Repair & Replacement
Repair covers spalled edges, hairline cracks, lifted panels, and drain grates that have pulled loose from the surrounding slab. Replacement makes sense when more than about a third of the surface has failed or when the base underneath has washed out. We assess the base first with a probe, tell you plainly whether a repair will hold, and quote both options so you can compare them line by line.
Patios, Walkways & Pool Decks
Patios and walkways take the same pavement build as a driveway but with different drainage demands, especially around pool decks where water has to run away from the coping. You need this work when your back patio ponds in a storm, when walkway pavers have heaved at a tree root, or when a bare builder-grade slab is the last unfinished thing on your yard. We use Belgard and Unilock pavers for patios and set pool deck surfaces with slip-resistant finishes that hold up to chlorinated splash-out and North Texas sun.
Brick Paver Driveway
Clay brick pavers give a driveway a warmer look than concrete and hold color better than stained surfaces because the pigment runs through the full unit. They suit older Plano neighborhoods where brick is part of the streetscape and the material matches what’s already on the house. We lay a compacted aggregate base, set the brick in a running or herringbone pattern, and lock the field in with edge restraint so the border stays put.
Stamped Concrete Driveway
Stamped concrete reproduces the look of stone, brick, or slate by pressing a pattern into poured concrete before it cures. It’s the middle path when you want a decorative surface without the per-unit cost of pavers, and it works well on Plano lots where the driveway is long and a paver field would run high. We seal the surface after curing and lay out a written maintenance schedule so you know when resealing is due.
Driveway Sealing
Sealing protects concrete, asphalt, and pavers from UV fade, oil staining, and the freeze-thaw cycling Plano sees a few times each winter. You need it when water stops beading on the surface or when the color has gone flat and chalky. We clean, dry, and then apply the sealer in a weather window that won’t wash it out, and we tell you the honest reseal interval for your material rather than selling it every year.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Driveway & Pavers
Belgard pavers come in a wide range of shapes and colors, and the brand’s larger format units are what we reach for most on Plano driveways because fewer joints mean less sand to top up over time. We’ve worked with Belgard long enough to know which of their lines hold color under Texas sun and which ones fade toward gray after a few summers, and we tell you that before you pick a pallet.
Unilock and Tremron round out the material choices on most of our jobs. Unilock’s textured finishes work well on patios and walkways where grip matters around a pool, and Tremron’s pricing gives us a solid mid-range option when the paver driveway budget needs to stay in the $7,000 – $18,000 band without dropping to thin builder units. Whether you have Belgard, Unilock, Tremron, or any other make, we can help.
Signs You Need Driveway & Pavers Right Now
- Hairline cracks that keep returning after patching. When a patch fails inside a year, the problem is almost always underneath the slab, not in the patch mix. A base that has settled will keep cracking the surface no matter how many times it’s filled.
- Ponding water after a rain. Standing water in one spot of a Plano driveway signals a lost slope or a void under the slab. Left alone, that water works its way under the edge and starts lifting the surrounding pavement.
- Pavers that have sunk or heaved. A dip in the paver field or a raised lip at the edge means the bedding sand has migrated or an edge restraint has failed. Both are fixable early and much more expensive once traffic starts breaking the units.
- Crumbling edges and spalled garage aprons. Concrete that crumbles at the edges has usually been hit by de-icing salt or lost its air entrainment. The apron is where it starts, and it moves inward toward the slab.
- Oil stains and UV-faded asphalt. Asphalt that has gone pale and stops beading water has lost its protective top layer. Sealing at that stage costs a few hundred dollars and buying time there beats a full overlay later.
Our Driveway & Pavers Process – Step by Step
- 1
Free on-site estimate and base probe. We walk the driveway, probe the base at a few points, and photograph the drainage slope with a level. You see the findings and get a written scope with a flat price before any work is scheduled.
- 2
Permits and utility locate. Plano requires a permit for the driveway approach at the curb, and we pull it and pass the inspection. We also call for utility locates so nobody hits an irrigation line or a gas stub during demo.
- 3
Demolition and base prep. The old surface comes out, the subgrade gets compacted and moisture-conditioned to manage the clay, and we lay a graded aggregate base built to the load the driveway will carry. Photos go into your record at each stage.
- 4
Installation. Concrete gets poured with rebar and control joints; pavers get set to pattern, wet-cut at the edges, and locked with edge restraint; asphalt gets compacted in lifts. We keep the work area contained and clean up daily.
- 5
Final walkthrough and documentation. We walk the finished driveway with you, hand over the photo record, the signed scope, and the written warranty, and explain what maintenance to expect. The 365-Day Done Right Promise covers the work for a full year.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Driveway & Pavers Cost in Plano?

A typical paver driveway in Plano runs $7,000 – $18,000 depending on square footage, pattern, and how much base repair is needed. Concrete comes in lower, at $4,500 – $12,000 for a new pour, and a full driveway replacement sits at $5,000 – $14,000. Asphalt paving runs $3,500 – $9,000, and sealing is a small job at $250 – $700.
- Paver driveway installation: $7,000 – $18,000
- Concrete driveway installation: $4,500 – $12,000
- Asphalt driveway paving: $3,500 – $9,000
- Driveway replacement: $5,000 – $14,000
- Driveway sealing: $250 – $700
- Paver patio installation: $3,500 – $11,000
What moves the price is square footage, material choice, the condition of the base underneath, and how much demo and haul-off the job needs. A driveway poured over failed clay costs more to fix than one that just needs a fresh surface. To avoid overpaying, get the quote broken out by material, base work, and labor so you can compare apples to apples, and be wary of a number that arrives without a written scope. Every Rowan estimate includes the flat written price, the scope of work, the permit handling, and the written warranty. Call (844) 761-8346 for an exact quote, and bring a competitor’s estimate if you have one: our Free Second Opinion reviews it line by line at no charge.
Driveway & Pavers Near Plano – Our Service Area
We serve Plano and the surrounding communities, including Allen, Richardson, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. If you’re just over the line in Allen or Richardson, our crews schedule those jobs the same way they schedule work in Plano, with an on-site estimate and a written price. See our Driveway & Pavers in Allen page for that area, or start from the home page.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Driveway & Pavers in Plano

Driveway and paver work covers installing, repairing, and protecting the hard surfaces that lead to your home: concrete, asphalt, brick, and interlocking pavers, plus patios and walkways. It’s the trade that handles base prep, drainage slope, and finishing, not just the visible surface. In Plano, the base prep is the part that decides whether a driveway lasts, because the clay under most lots moves with the seasons. Call (844) 761-8346 to talk through your surface.
A paver driveway typically takes three to five days from demo to final walkthrough, and a concrete pour can finish in two to four days, though cure time runs longer. The timeline depends on square footage, base repairs, and weather. Delays happen mostly from rain, and we tell you up front how a storm window could shift the schedule. Call (844) 761-8346 for a written timeline with your estimate.
Paver driveway installation runs $7,000 – $18,000, concrete installation runs $4,500 – $12,000, and sealing is $250 – $700. The wide range comes from size, material, and base condition. We give you a flat written price with a written scope before any work starts, so the number you agree to is the number you pay unless a change order is signed. Call (844) 761-8346 for a free estimate.
Yes, we work with Belgard, Unilock, Tremron, and other major paver lines on a regular basis. We can source material or install pavers you’ve already purchased, and we’ll tell you which brands hold up best for Plano’s sun and soil. If you have a specific line in mind, mention it when you call. Call (844) 761-8346 to schedule.
Our phones are answered by a live person 24/7, so you can call anytime about a driveway problem that can’t wait. Planned installs and replacements get scheduled normally, but if a slab has cracked open or a paver field has failed in a way that blocks your car, call and we’ll tell you the fastest safe next step. Call (844) 761-8346 and someone will pick up.
Every Rowan driveway and paver job carries the 365-Day Done Right Promise: if it isn’t done right, we make it right. The warranty is written, printed on your paperwork, and backed by The Haven Standard, not a handshake. You’ll also receive the documented photo record and the signed scope from the crew. Call (844) 761-8346 to review the terms on your estimate.
Clear the driveway of vehicles, trash bins, and anything stored near the garage door the night before, and move potted plants back from the edges. Trim low tree branches that overhang the work area and make sure irrigation heads near the drive are flagged so we don’t hit them. If you have pets, plan to keep them inside while equipment is running. Call (844) 761-8346 if you have questions about access before the crew arrives.
Schedule Your Driveway & Pavers Service in Plano Today
If your Plano driveway has cracked, settled, or simply worn out its looks, we’ll put the number in writing before anything starts. Every estimate is free, every quote is flat and itemized, and every job finishes under the 365-Day Done Right Promise. Call (844) 761-8346 to schedule your free estimate, and bring any written estimate you already have for a line-by-line second opinion at no charge.