A Rowan company - serving Plano, TX
A backyard with a new horizontal privacy fence

Fence Installation Near Me in Plano - Free On-Site Quote, HOA Approval Handled

We locate the property line, pull the permit, and handle HOA approval before a post goes in. Written price per foot, quoted on site, with no add-ons at the end.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A new stained cedar privacy fence
A new front yard fence with a matching gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Fence Installation Near You in Plano, TX

Fence installation in Plano, TX typically runs $3,200 to $7,800 for a standard 150-foot residential yard, with cedar privacy fencing landing in the $28 to $42 per linear foot range and composite closer to $48 to $65. We’re Rowan Construction Group, and we connect Plano homeowners with background-checked, insured local fence crews who put the full price in writing before anyone digs a post hole. Call (844) 761-8346 and a live person answers, day or night.

If you’re typing “fence installation near me” because a storm took down a run of boards in the last big hail season, or because the HOA sent a letter about the back fence, we understand the timeline pressure. Plano’s clay-heavy Blackland soil moves with every wet and dry cycle, and that movement is the single biggest reason fences here lean, heave, and fail at the posts long before the boards wear out. Getting a crew who knows that matters more than getting the cheapest bid.

A new wood side gate with black hardware

Fast, Local Fence Installation

Most Plano fence projects we quote move from written estimate to installation in five to ten business days, and repair and replacement calls in the busy spring and fall windows often get a crew on site inside a week. Emergency situations – a fence down across a driveway, a gate that won’t secure, a section a dog can push through – get prioritized scheduling when we can arrange it, and calls are answered by a live person around the clock.

The process is deliberately plain. You call, we talk through the yard, and you get a written price with a written scope and a written warranty before any work begins. Under Clause 1 of The Haven Standard, that flat price is the number you agree to; if something changes on site, nothing moves forward until you’ve signed a change order. Across 4,000-plus projects, that discipline is why jobs finish within a few percent of the agreed cost instead of drifting upward.

Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before they arrive at your property. Every visit includes a documented photo record as a standard deliverable – photos of the post footings, the existing substrate, and the finished run – so you have evidence of what was found and what was done. That’s included, not an upgrade.

What a Fence Project in Plano Actually Involves

Plano fences fail at the ground first. Our crews set posts below the frost line and account for the shrink-swell behavior of the local soil, which means deeper footings and concrete set to the right depth matter more than board choice. Aluminum and steel ornamental fencing hold up well against both soil movement and the wind that funnels across the open stretches near the George Bush Turnpike corridor; wood privacy fencing needs a post setting done right the first time.

Materials we source through our network of 50-plus vetted brands include cedar, pressure-treated pine, aluminum, vinyl, and composite, plus gates and hardware built to hold up to Texas heat and sun. Whether it’s a 6-foot cedar privacy run, an HOA-compliant aluminum fence, or a composite gate at the side yard, the written quote names the exact material, the linear footage, the post spacing, and the gate hardware before you commit.

A Few Things Worth Knowing Before You Sign

  • Permits: Plano requires a permit for fences over 6 feet and for any fence in an easement or on a property line that needs a survey. Our crew walks you through what your specific lot needs so you aren’t surprised mid-build.
  • HOA rules: Many Plano subdivisions place height, material, and color restrictions above city code. We confirm the rules for your community before quoting.
  • Survey stakes: Fences must sit inside your property line. If you don’t have a recent survey, we’ll flag it early – moving a fence after the fact is far more expensive than checking first.
  • Pool fencing: Pools in Plano need a code-compliant barrier with self-latching gates. We quote the specific hardware, not a generic gate.
A new paver patio with a seat wall and fire pit

Areas We Cover

We serve homeowners across Plano and the surrounding communities, including home neighborhoods in Richardson, Allen, Murphy, Fairview, Lucas, Sachse, and McKinney. From the established streets near downtown Plano to the newer builds out toward Legacy West, we quote a written price before any work begins, whether the job is a full perimeter fence or a single gate replacement. If you’re weighing new fence against another exterior project this season, our Fence Installation in Plano page has the full service breakdown.

Here’s what a written estimate breaks into, so you can compare bids on the same terms:

Line Item Typical Plano Range
Cedar privacy fence, 6 ft (per linear ft, installed) $28 – $42
Pressure-treated pine, 6 ft (per linear ft, installed) $22 – $34
Composite or vinyl (per linear ft, installed) $40 – $65
Aluminum or steel ornamental (per linear ft, installed) $38 – $70
Post replacement and resetting $180 – $450 per post
Gate (walk gate, installed) $350 – $900
Stain, seal, or finish $400 – $1,200
Storm-damage removal and haul-off $250 – $700

Those ranges depend on run length, gate count, terrain, and material availability. Call (844) 761-8346 for a flat, written quote for your lot – free, no obligation.

Why Homeowners Ask for a Second Opinion

Our Free Second Opinion on any written estimate is a standing offer: bring a competitor’s quote and we’ll review it line by line at no charge. Plano homeowners told us they read the three-star reviews and want the number before they pick up the phone, so here it is. A written price, a flat scope, a written warranty – these are the terms of every project, not a sales pitch. And the 365-Day Done Right Promise means that if it isn’t done right, we make it right, backed by The Haven Standard and a terms page, not an asterisk.

FAQs

How fast can you install a fence in Plano?

Most fence projects in Plano are installed within five to ten business days of a signed written estimate, and repair work often gets a crew on site within a week. During peak storm season – typically late spring and early fall – scheduling takes longer, so calling earlier secures a sooner slot. Call (844) 761-8346 and estimates are free.

Do you serve my Plano-area neighborhood?

We cover Plano and the surrounding communities, including Richardson, Allen, Murphy, Fairview, Lucas, Sachse, and McKinney. If you’re not sure whether your address falls within reach, call (844) 761-8346 and we’ll confirm your area and schedule a written estimate.

How much does fence installation cost in Plano?

Fence installation in Plano typically runs $3,200 to $7,800 for a standard 150-foot yard, with cedar at $28 to $42 per linear foot, composite and vinyl at $40 to $65, and aluminum at $38 to $70. Gate, removal, and stain add to the total. Call (844) 761-8346 for an exact written quote at no charge.

Can you help after hours or on weekends?

Yes. A live person answers calls 24 hours a day, so you can request an estimate or report an emergency fence problem any time, and we’ll follow up to schedule. After-hours estimates are available on request. Call (844) 761-8346 whenever it’s convenient for you.

Get Your Fence Quote in Writing

If you’re searching “fence installation near me” in Plano, you want a crew who shows up, a price you can compare, and a written record when they leave. That’s what we do. Call (844) 761-8346 for a free estimate – you’ll get a flat written price with a written scope and warranty before any work starts, and a free second opinion on any estimate you already have.

Written by the team at Rowan Construction Group Plano, serving Plano and nearby areas.

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A second-story addition that matches the existing rooflineA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinets

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346

Request a Free Estimate

Tell us what's going on in Plano. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch