







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterBathroom Remodel Cost in Plano, TX: What the Number Actually Includes
A Plano bathroom remodel typically costs $9,000-$28,000, with primary bath guts running $18,000-$45,000 and hall bath updates landing at $9,000-$18,000. Those numbers hold only when the substrate behind the tile is sound. In Plano’s 1980s-2000s tract homes, it often isn’t. Call (844) 761-8346 for a written price before anyone picks up a tool. Estimates are free, and we’ll tell you upfront whether substrate replacement belongs in your scope.

Why Plano Bathroom Remodel Costs Run Higher Than the National Average
Behind the tile in a 1990s Plano bathroom, there’s a strong chance you’ll find moisture-damaged greenboard drywall. That’s not a scare tactic. It’s what our documented photo records show across bathroom projects in Plano’s tract-home subdivisions: Deerfield, Willow Bend, Russell Creek, and the older infill around Legacy West.
Builder-grade construction in that era used greenboard – a paper-faced drywall rated “moisture resistant” – in wet areas. It resists humidity. It does not resist the slow wicking that happens behind a shower surround over ten or twenty years. By the time a homeowner notices soft grout or a loose tile, the paper face has absorbed moisture and the gypsum behind it has started to crumble. The tile still looks fine from the outside. That’s the silent-failure problem.
In sandier or rockier metros, a bathroom remodel is closer to pure cosmetics. In Plano, it’s often substrate surgery. The city is built-out and largely master-planned, so nearly every job here is renovation of 1980s-2000s housing rather than new construction. The original builder-grade systems are hitting end-of-life at roughly the same time. That’s a concentrated remodel market, and it’s why the cost you read online rarely matches the cost you hear from a Plano contractor standing in your bathroom.
What a Plano Bathroom Remodel Costs, Line by Line
Here are the ranges we work from in Plano, calibrated to local labor and material costs. Every one of these is a flat written price with a written scope before work begins. Under Clause 1 of The Haven Standard, the number is on paper first; “call for a quote” isn’t part of how we operate.
| Scope | Typical Plano Range |
|---|---|
| Hall bath update (fixtures, vanity, tile refresh) | $9,000-$18,000 |
| Primary bath gut remodel (Kohler or Toto fixtures, Cambria or tile surround) | $18,000-$45,000 |
| Walk-in shower conversion from tub | $12,000-$28,000 |
| Walk-in shower installation (no tub removal) | $4,500-$12,000 |
| Tub-to-shower conversion | $3,500-$10,000 |
| Shower replacement (like-for-like) | $3,000-$8,500 |
| Vanity installation | $800-$3,000 |
| Small bathroom remodel (under 40 sq ft) | $5,000-$12,000 |
| Cement-board substrate replacement (wet-area upgrade) | $800-$2,500 |

The Greenboard-to-Cement-Board Upgrade: Why It Isn’t Optional in Plano
Plano summers push humidity high enough that a bathroom without a proper moisture barrier stays damp long after the shower stops. Greenboard doesn’t fail because it’s a bad product. It fails because it was asked to do a job it wasn’t designed for.
Our standard spec replaces it. In the wet areas, we install cement board – HardieBacker is our default, with Schluter Kerdi waterproofing membrane on top. Cement board won’t crumble when it gets wet; Kerdi decouples the tile from minor substrate movement and keeps moisture out of the wall assembly entirely. Together they add $800-$2,500 to the job, depending on wet-area square footage.
Skip that step and you’ll likely be tearing the shower apart within five years. The $800-$2,500 you saved turns into a repeat remodel. We’ve walked into Plano bathrooms where the previous tile-out was done on fresh greenboard, and the failure started almost immediately.
If you want the full scope of what we handle, our Bathroom Remodeling service page lays out the process end to end, from demo to final walkthrough.
Fixtures That Hold Up in Plano’s Water
Plano draws from a mix of surface and groundwater sources, and that blend leaves mineral deposits on fixtures faster than national averages suggest. Faucet aerators clog. Shower glass spots. Chrome pits. The fix isn’t a water softener; it’s spec’ing materials that tolerate hard water from the start.
We name the brand and the model in the written quote. Two we spec regularly:
- Kohler – specifically the DTV digital valve system, which lets you set a precise temperature instead of nudging a single-lever handle every time. Fewer moving parts in the valve body means fewer failure points in a hard-water household.
- Toto – the Tornado Flush system, which uses a cyclonic rinse rather than full-bowl gravity-feed. Better solids clearance, and less mineral buildup in the bowl under Plano’s water conditions.
On faucets, we lean toward matte and brushed finishes where the coating spec is rated for hard water, and we’ll flag it in the quote when a finish won’t hold up. The full detail on materials and process is on our home page.
What the Photo Record Actually Shows You
Every visit comes with a documented photo record, included as standard. It’s not an upgrade. Here’s what it captures, and why it matters to a Plano homeowner deciding whether a contractor is being straight with them:
- Before demo: photos of the original substrate, so you see the moisture damage we found and you can compare it to the photos a contractor who skipped demo might have shown you.
- Mid-project: photos of the waterproofing membrane installed and sealed, before tile goes over it. This is the layer you can never inspect again once the job is done.
- Post-tile: photos of the finished surface, seams, and edges.
You’ll also get a documented photo record of the plumbing rough-in and drain work. If you’re ever selling the home, that file is documentation of what was done behind the wall. And if something fails within the first year, the 365-Day Done Right Promise is backed by those photos – we can see exactly what was installed and fix it correctly.
The Plano permitting process adds its own layer. Permits, inspection timing, and HOA overlays (Legacy West and the older Willow Bend and Deerfield subdivisions each have their own approval layers) affect the schedule. Our written scope names the permit work explicitly so you know what’s covered.
FAQs
A bathroom remodel in Plano typically costs $9,000-$28,000. A primary bath gut remodel with new Kohler or Toto fixtures, Cambria or tile surround, and substrate replacement runs $18,000-$45,000; a hall bath update lands at $9,000-$18,000; and a tub-to-shower conversion is $12,000-$28,000. Every number we quote is a flat written price before work starts. Call (844) 761-8346 for an exact quote – estimates are free.
No, but it’s required more often than homeowners expect. Our documented photo records across Plano’s 1980s-2000s tract homes show moisture-damaged greenboard frequently enough that we budget it into the written scope before demo. Omitting the $800-$2,500 cement-board upgrade leads to failure within roughly five years in this climate. Call us for a free estimate and we’ll tell you what your bath is likely to need.
Yes. A flat written price with a written scope and a written warranty is standard before any work starts. Call (844) 761-8346 and we’ll begin the process with a free estimate.
Greenboard is paper-faced drywall rated for humidity; cement board is a fiber-reinforced cement panel rated for direct water contact. In Plano’s humid summers, greenboard behind a shower surround wicks moisture and crumbles over time, while cement board with a Schluter Kerdi membrane stays watertight. Call us if you’re unsure which is in your bathroom.
Get a Written Price Before You Commit
Rowan Construction Group Plano has been putting the number on paper since 2007 across more than 4,000 projects. Every crew is background-checked and uniformed. A live person answers our line, day or night. And every visit comes with a documented photo record, included. Bring a competitor’s estimate and we’ll review it line by line at no charge. Call (844) 761-8346 for your free estimate on a Plano bathroom remodel.
Written by the team at Rowan Construction Group Plano, serving Plano, TX.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












