







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterConstruction Companies Near Me in Plano, TX: What to Look For Before You Call
When Plano homeowners search “construction companies near me,” what they usually need is a renovation specialist, not a new-construction generalist. Rowan Construction Group Plano works across seven residential trades – kitchens, baths, roofing, windows and doors, fencing, driveways and pavers, and additions including ADUs – with a written flat price before any work begins and no change proceeding without a signed change order. Call (844) 761-8346 for a free estimate.

Why Plano Rewards Renovation Specialists, Not Greenfield Builders
Plano has almost no undeveloped land left. The construction happening here is not on empty lots. It’s on 30-year-old slab homes in Deerfield and Willow Bend, teardown-rebuilds in Legacy West, and builder-grade kitchens and baths that are all reaching end-of-life at roughly the same time. That’s a different job than production homebuilding, and the national companies that rank for “construction companies near me” are usually set up for the second thing.
Walk a street in Russell Creek and you’ll see the pattern: original composition-shingle roofs, original cabinets, original vanities, all installed within a few years of each other. When one fails, the others are close behind. A contractor who assesses the roof, the slab, and the interior scope in a single pre-construction visit produces a more honest total-project budget than three specialists each quoting only their trade.
Add North Texas black clay soil to the picture. The shrink-swell cycle across Plano’s slab-on-grade subdivisions pushes foundation movement into projects that would be purely cosmetic in sandier metros. We budget piers, drainage corrections, and leveling into the scope up front rather than discovering them after demolition. The same goes for hail season – repairing the exterior envelope and remodeling the interior two months later, with the same contract and the same point of contact, sidesteps the scheduling gaps that show up when separate contractors don’t talk to each other.
How Rowan Construction Group Plano Handles a Plano Renovation
Under Clause 1 of The Haven Standard, you get a written flat price and written scope before anyone picks up a tool. That’s not a process step; it’s the founding discipline. Since 2007, Rowan has delivered 4,000-plus projects, and the record has stayed within a few percent of the agreed price – because no work proceeds on a scope change until the homeowner signs a change order with the revised number.
A few specifics on what the seven-trade setup actually buys you in Plano:
- One contract, one point of contact. A whole-home renovation that would normally need four or five specialty contractors runs under a single written agreement with Rowan.
- Roofing and interior on the same timeline. Hail repair and a kitchen remodel sequence together instead of leaving a gap between two crews who’ve never met.
- Real material pricing. Sourcing across fifty-plus vetted brands – GAF and Owens Corning roofing, KraftMaid and Wellborn cabinets, Belgard pavers – means the written quote uses current supplier numbers, not inflated allowances padded for later negotiation.
- Documented photo record on every visit. You get evidence of what was found and what was done, included as standard.
- Background-checked, uniformed crews. Every crew member is verified before arrival, and a live person answers calls 24/7.
Add the 365-Day Done Right Promise: if it isn’t done right, Rowan makes it right – backed by a terms page, not an asterisk. And a Free Second Opinion on any written estimate from a competitor – we’ll review it line by line at no charge.

What Construction Work Costs in Plano Right Now
Plano’s housing stock and market rates push most of the work into these ranges. These are the numbers we quote on a written estimate, not opening bids designed to be negotiated downward.
| Project | Typical Plano Range |
|---|---|
| Full kitchen remodel | $14,000-$45,000 |
| Cabinet installation | $4,000-$13,000 |
| Countertop installation | $2,000-$6,500 |
| Bathroom remodel | $9,000-$28,000 |
| Walk-in shower installation | $4,500-$12,000 |
| Roof replacement | $8,000-$20,000 |
| Roof repair | $400-$1,800 |
| Window replacement | $4,500-$15,000 |
| Vinyl fence installation | $3,500-$9,000 |
| Paver driveway installation | $7,000-$18,000 |
| Home addition | $45,000-$130,000 |
| ADU construction | $90,000-$220,000 |
| Garage conversion | $30,000-$80,000 |
Foundation corrections and drainage work get quoted separately once the piers, grade, and soil conditions are inspected – you’ll see them as line items, not buried in a contingency allowance. If the total is what you need before committing, that’s exactly what the written price is for. Learn more about our full residential construction services to see how the trades come together on one contract.
Common Local Scenarios We See in Plano
The 1998 kitchen in Russell Creek. Original oak cabinets, laminate counters, a kitchen island that eats the walkway. KraftMaid or Wellborn replacement cabinets plus Cambria or Caesarstone counters usually lands between $14,000 and $45,000 with the island brought up to a usable size.
Hail damage plus a stalled interior remodel. North Texas spring storms hit roofs before homeowners are ready to start the bathroom they’ve been planning. Running roof replacement and a tub-to-shower conversion under the same contract prevents the six-week scheduling gap between two separate contractors.
Slab movement in a Deerfield bath. Black clay soil doesn’t stay put. A tile shower that cracks at the drain pan is often a symptom, not the cause. We inspect the slab and drainage before the tile goes down, so the walk-in shower cost of $4,500-$12,000 doesn’t get spent twice.
A teardown-rebuild decision in Legacy West. HOA architectural review, setback requirements, and the fact that the original structure is gone altogether. Different approval track than a driveway replacement or a fence install, and worth scoping in one pre-construction visit.
FAQs
Remodeling nearly always costs less than moving in Plano’s built-out market – replacing a 30-year-old kitchen and bath in Deerfield for $23,000 to $73,000 combined is a fraction of the premium on a nearby comparable home plus transaction costs. Call (844) 761-8346 for a free written comparison estimate.
Yes. Rowan Construction Group Plano operates roofing alongside kitchen, bath, window, and addition work, so a single signed contract and one change-order process cover both. Call (844) 761-8346 for a scope quote.
Yes – Plano requires building permits for additions and ADUs, and HOA architectural review may sit on top in master-planned subdivisions. Our written estimate lays out the permit and review steps as line items, not as surprises. Call (844) 761-8346 to start the scope.
The change-order rule is the answer: no work proceeds on a change until you’ve signed a change order with the revised number in writing. Rowan has kept projects within a few percent of the agreed cost since 2007 across 4,000-plus jobs. Call (844) 761-8346 for a written price today.
Ready for a Written Price on Your Plano Project?
Call (844) 761-8346 for a free estimate. Rowan Construction Group Plano will inspect the roof, the slab, and the interior scope in a single visit, hand you a flat written price with a written scope and warranty, and include a documented photo record on every visit. Background-checked, uniformed crews; live person answering 24/7.
Written by the team at Rowan Construction Group Plano, serving Plano, TX.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












