A Rowan company - serving Plano, TX
A living room with a wall of new windows and a sliding glass door

Frequently Asked Questions

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano

Frequently Asked Questions

These are the questions Plano homeowners ask us before they hire anyone, answered the way we answer them on the phone: with numbers, names, and process steps rather than assurances. If your question isn’t here, call Rowan Construction Group at (844) 761-8346 and a live person will pick up.

Key Takeaways

  • Every Rowan project in Plano gets a flat written price and written scope before any work starts.
  • No change proceeds without a signed change order – the discipline that keeps projects within a few percent of the agreed cost.
  • Crews are background-checked and uniformed, and every visit includes a documented photo record as a standard deliverable.
  • The 365-Day Done Right Promise is printed on every page and backed by a terms page, not an asterisk.
A new concrete driveway with a paver border

Pricing & Estimates

How much does construction service cost in Plano?

Residential construction in Plano typically runs from a few hundred dollars for a single-trade repair to well over six figures for a full addition, and the range depends almost entirely on scope, materials, and the condition of what’s underneath. Roof replacements on a standard Plano three-tab or architectural shingle roof commonly land in the five-figure range once decking and flashing are accounted for; a mid-grade kitchen remodel with KraftMaid or Wellborn cabinets and a Cambria or Caesarstone countertop sits in the mid five figures; and a home addition or ADU scales with square footage, foundation work, and utility tie-ins. What we won’t do is quote a number before we’ve seen the substrate, the shingle layer count, or the tile membrane – that’s how contractors end up surprised and homeowners end up paying for the surprise.

Do you offer free estimates?

Yes. Every estimate from Rowan Construction Group Plano is free, and more importantly, every estimate we hand you is a flat written price with a written scope and a written warranty. “Call for a quote” is not something we say. You get the number in writing before anyone picks up a tool, because that’s Clause 1 of the Haven Standard and the whole reason the company exists in its current form.

Can I get a second opinion on a competitor’s quote?

Yes, and it’s free. Bring any written estimate from another contractor to us and we’ll review it line by line at no charge – the scope, the line items, the allowances, and what’s conspicuously missing. Plenty of Plano homeowners have used this to find out that the low bid they were about to sign assumed a shingle tear-off that wasn’t included, or a counter allowance that wouldn’t cover the slab they actually wanted. Reviewing someone else’s paperwork costs you nothing and sometimes saves you a lot.

What payment methods do you accept?

We accept the standard payment methods for residential construction work – check, major credit card, and bank transfer – and the schedule is set out in writing before work begins. What matters more than the method is the structure: you should always know exactly what you’re paying for and when. Ask for the written payment schedule with your estimate, and don’t sign anything that doesn’t have one.

Why is the final price so often a few percent over the agreed price?

Because on a real residential job, some conditions can’t be seen until the work opens up – a softened subfloor, a missing layer of flashing, a fence line sitting on a grade that needs correction. Rowan’s discipline is that no work proceeds on any change until a signed change order is in hand, so the number you agreed to stays the number, and any variance is a documented, approved cost rather than a surprise at the end. Across more than 4,000 projects, that discipline is the reason final invoices land within a few percent of the original quote instead of drifting 20 percent past it.

Service & Scheduling

Do you offer emergency construction service in Plano?

We handle urgent situations – a roof leak during a spring storm, a broken window, storm-damaged fencing – and calls are answered by a live person 24/7, not a voicemail tree. What we don’t do is claim “24/7 emergency construction” in the sense of dispatching a full crew at 2 a.m.; real construction is daylight work. What you’ll get is a live human on the line, a plan for the next available slot, and a documented photo record of anything we do on an urgent visit so you have evidence for your insurance file.

How fast can you respond?

For most non-emergency work in Plano, we can typically schedule an on-site estimate within a few business days, and urgent calls get prioritized. Response time depends on the trade and the season – roofing and fencing back up after major hail events across Collin County, while kitchen and bathroom remodels move on a scheduled calendar. Every project gets a written start date and a written schedule before work begins, so you’re never guessing when the crew will show up.

What areas do you serve?

We serve Plano and the surrounding Collin County communities, including nearby cities such as Frisco, Allen, McKinney, Richardson, Carrollton, and Murphy. Plano itself is a large city with varied housing stock – from the 1980s and 1990s builds in the older core to the newer construction out toward the western edge – and the scope and pricing differ by neighborhood. If you’re unsure whether your address is in our service area, call (844) 761-8346 and we’ll tell you straight.

What are the steps from first call to finished project?

Here’s the process every Rowan project follows, in order. It’s designed so you always know what’s happening next and what you’re paying for.

  1. Call and intake. A live person answers 24/7, takes your address and the details of the project, and schedules an on-site visit.
  2. On-site assessment. We look at the substrate, the structure, and the existing conditions – not just the finish you want. Photos are taken.
  3. Written estimate. You receive a flat written price, a written scope, and a written warranty. Every line item is priced, and there’s no “call for a quote.”
  4. Second opinion (optional). If you have a competitor’s estimate, we review it line by line at no charge before you sign.
  5. Signed scope and schedule. You sign off on the written scope and the payment schedule. The start date is set in writing.
  6. Work begins. Background-checked, uniformed technicians arrive. Any change that arises requires a signed change order before work continues.
  7. Photo record and walkthrough. On completion, you receive a documented photo record of what was found and what was done, plus a written warranty and the 365-Day Done Right Promise.
A stone counter, tile backsplash and open shelf after a kitchen remodel

Licensing & Trust

Are you licensed and insured?

Yes. Rowan Construction Group Plano is state-licensed and carries insurance, and our crews are background-checked and uniformed before they arrive at your door. Every crew member is verified before they show up. Our technicians have up to 19 years of experience, and we’ll provide documentation of licensing and insurance on request – we’d rather you check than assume.

Do you guarantee your work?

Yes, under the 365-Day Done Right Promise. If it isn’t done right, Rowan makes it right – for a full year after the work is completed. The guarantee is printed on every page and backed by a terms page, not an asterisk or a verbal promise. That’s what The Haven Standard means in practice: the promise is a written, enforceable term of the job.

What is The Haven Standard?

The Haven Standard is the written operating system behind every Rowan project, and it’s the reason the company was acquired into the Haven family. Its clauses are the promises we make on every job: the price is written before anyone starts, changes require a signed change order, and every visit comes with a documented photo record. It’s a system, not a slogan, and every crew member works to it.

Why should I trust a contractor I’ve never used?

You shouldn’t, on the basis of a brochure – you should trust what you can verify. Ask for a written price and scope, ask for proof of licensing and insurance, ask for the terms page behind any guarantee, and ask whether changes get a signed change order. Rowan is built around those four things being standard rather than special. Our Plano customers tend to research contractors the way they research appliances – reading the three-star reviews – and that’s fine with us; we’d rather earn the job on documentation than on enthusiasm.

Specific Services

Do you handle kitchen remodeling in Plano?

Yes. Kitchen remodeling is one of our seven trades, and it’s where our sourcing depth shows most clearly – we work with KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, and Kohler and Toto fixtures. Plano kitchens commonly need more than a face-lift once you remove the old cabinets and find the original wiring or plumbing wasn’t sized for a modern layout, so the estimate accounts for what’s behind the wall, not just what’s in front of it. You get a written scope covering every line item before work begins.

Do you handle bathroom remodeling?

Yes. Bathroom remodeling is a core Rowan trade, and the detail we spend the most time on is the waterproofing – the membrane under the tile, the shower pan, and the weep screed at the base of the exterior stucco if that’s part of your build. A bathroom that looks fine and leaks behind the tile is a five-figure problem later, so the estimate covers what’s under the surface. Fixtures come from names like Kohler and Toto, and every visit is documented with photos.

Do you handle roofing?

Yes. Roofing is one of our trades, and we install GAF and Owens Corning systems. In Plano, hail and spring storm season drive most roofing calls, and the most common hidden issue we find is a compromised deck and underlayment that wasn’t visible from the ground. We check the shingle layer count and the decking before quoting, and we provide a documented photo record of what we found so you have evidence for an insurance claim if you’re filing one.

Do you handle windows and doors?

Yes. Window and door replacement is part of our residential work, and in Plano’s climate the key considerations are heat gain, wind ratings, and proper flashing and sealing around the openings. A window that’s installed without correct flashing will leak at the head and sill within a few seasons regardless of the glass specification, so installation detail matters as much as the unit itself. Every install gets a written scope and a documented photo record.

Do you handle fence installation?

Yes. Fence installation is one of our trades, and in Plano the two things that most often fail first are the posts and the grade. A fence set on a soft or poorly drained line will lean within a few years even if the panels themselves are sound. We check the post-hole depth and the soil before quoting, and the crew documents the install with photos.

Do you handle driveways and pavers?

Yes. We install driveway and paver work, and our sourcing includes Belgard and Techo-Bloc pavers. In Plano, the choice between concrete and pavers is largely a question of how the base is built and how the driveway handles our shrink-swell clay soils – a slab that isn’t properly prepared will crack and heave, and a paver system is only as good as its compacted base. See our Driveway & Pavers in Plano page for a full breakdown.

Do you handle home additions and ADUs?

Yes. Home additions including ADUs are one of our seven trades, and they’re the projects where the signed change-order discipline matters most – additions almost always uncover something unexpected once the framing opens the wall. An ADU (accessory dwelling unit, a self-contained secondary residence on the same lot) is a bigger project than an in-law suite because it requires its own utility service, entrance, and often its own kitchen. Plano has specific rules about lot coverage and setback for additions, so we verify the lot condition and the scope before putting a written number on the page.

Do you stock materials, or do you order them per job?

Materials are sourced per job from our vetted brand list of fifty-plus manufacturers – names like GAF, Owens Corning, KraftMaid, Wellborn, Cambria, Caesarstone, Kohler, Toto, Belgard, and Techo-Bloc. What that means for you is that the written quote carries honest numbers, because we’re pricing real, named products rather than a vague “allowance” that balloons once the work begins. Ask for the brand and model on anything you’re buying, and make sure it’s named in the written scope.

Can I see examples of past work?

Yes. More than 4,000 projects have been delivered, every one with a written price before work started and a documented record when the crew left. Ask for the written price and scope on any reference project and you’ll see how the line items were built. The photo record from every visit is also yours to keep, so you leave with evidence of what was found and what was done.

What should I have ready before the first visit?

The most useful things to have ready are any existing photos or plans you have, your budget range (we’ll tell you honestly what it buys in Plano today), any written estimates you’ve received from other contractors for the free second opinion, and access to the areas we’ll need to look at – the attic if roofing, the crawl if there is one, and the wall behind the vanity if it’s a bathroom. The more we can see on the first visit, the more honest the written quote will be.

What happens if something goes wrong during the project?

Call us. A live person answers 24/7, and any change to the work requires a signed change order before anyone continues – that’s the discipline that keeps projects on track. If something isn’t done right, the 365-Day Done Right Promise applies: we make it right, backed by the written terms, not a handshake. That’s the whole point of running projects on a written standard rather than on how the project manager is feeling that week.

Do you work with insurance claims?

Yes. Storm-related roofing, fencing, and window damage often goes through insurance, and the documented photo record on every visit is designed to support that. We check the shingle layer count, the deck condition, and the damage before quoting, and you get photos of what we found so you have evidence to submit. We won’t inflate a scope to fit a deductible – we quote the work that needs doing and provide the documentation to support it.

Have a question we didn’t cover? Call Rowan Construction Group Plano at (844) 761-8346.

Written by the team at Rowan Construction Group.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch