A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
KraftMaid · Plano

KraftMaid Construction Service in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A remodeled hall bathroom with subway tile and a floating vanity
A garage converted into a guest room and home office
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Why Plano Homeowners Choose KraftMaid Construction

We provide independent KraftMaid construction service in Plano, TX: cabinet repair, refacing, full kitchen remodeling, and countertop work on KraftMaid Vantage, Cabico, Sanctuary, and Passage lines. What makes our KraftMaid work different is diagnosis before demolition. We identify whether you’re dealing with stripped hinge screws in a plywood stile, delaminated dovetail joints, or true structural water damage, and we recommend the cheapest fix that actually holds. Rowan Construction Group Plano is not affiliated with, sponsored by, or authorized by KraftMaid. We’re an independent service provider, which means we answer to you and nobody else. Written price before any work starts, every time. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

Why Trust Rowan Construction Group Plano for Your KraftMaid Construction?

Installers leveling a new base cabinet during a kitchen remodel

KraftMaid builds cabinets in tiers, and the tier tells you what will fail. The Vantage series uses plywood cabinet boxes with a face-frame construction. The Cabico line runs all-plywood drawer boxes with dovetail joinery. The Sanctuary series is built for bath environments and uses moisture-resistant substrates, though not moisture-proof ones. The Passage series leans on value-engineered materials that behave differently again under load.

Our technicians have up to 19 years of experience, and that time matters here because KraftMaid’s hardware is proprietary. The soft-close hinges, the drawer glide systems, the face-frame screw patterns: these aren’t interchangeable with generic cabinet hardware off a shelf. We source OEM-compatible parts from authorized KraftMaid distributors, which keeps the installation warranty-safe. When we replace a hinge or a drawer glide with the correct OEM part, you’re not creating a warranty exclusion down the road. When a line is discontinued and OEM parts are gone, we say so up front and walk you through the color-matched alternatives.

Every visit includes a documented photo record as a standard deliverable. You see what we found: the stripped screw hole, the separated glue line, the swollen drawer bottom. Under Clause 1 of The Haven Standard, the written price arrives before anyone picks up a tool.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Common KraftMaid Construction Problems We Fix in Plano

Plano’s 1980s through 2000s brick-veneer tract homes are hitting their first real kitchen and bath replacement cycle right now. The KraftMaid cabinets installed in that era are failing in predictable ways. Here’s what we actually find.

  • Vantage face-frame glue-line failure. In humid North Texas kitchens, the plywood cabinet boxes on KraftMaid Vantage can suffer glue-line separation at the face-frame joints. That’s the seam where the front frame meets the box. When it lets go, doors hang out of square and drawers rack sideways. Plano’s summer humidity swings, running 60 to 90 percent through July and August, accelerate the process.
  • Cabico dovetail delamination. KraftMaid Cabico all-plywood drawer boxes can delaminate along the dovetail joints when they sit next to a dishwasher or under a sink. Steam and splash exposure works into the joint, the plywood layers separate, and the drawer bottom drops. Usually it starts with one drawer near the heat source.
  • Cracked hinge screw holes. The proprietary KraftMaid soft-close hinges often lose tension or crack at the mounting screw holes in the cabinet stile. The result: doors that won’t stay shut or hang visibly crooked. Overtightened factory screws plus seasonal wood movement cause most of these.
  • Sanctuary vanity finish blistering. In KraftMaid bathroom vanities, painted or stained finishes on MDF doors can blister or peel near sinks and tubs. Chronic moisture exposure is the cause, especially in small, poorly ventilated Plano bathrooms where the exhaust fan runs two minutes after a twenty-minute shower.
  • Passage series drawer glide wear. Value-engineered glide systems on the Passage line wear faster under heavy loads. Fully loaded utensil drawers and pot drawers show the wear first, usually as a grinding sound or a drawer that won’t close flush.

Notice a pattern? None of these failures mean the whole kitchen has to go. Diagnosis first, then the honest answer.

KraftMaid Parts & Our Repair-vs-Replace Approach

A new front yard fence with a matching gate

We know KraftMaid’s construction quirks in Plano, and we can tell the difference between a true plywood-box KraftMaid build and a particleboard budget line. That distinction decides the whole repair strategy. You can’t reface particleboard, and you can’t reasonably save a plywood box that’s been soaking under a leaking sink for a decade.

Parts sourcing works one of three ways. When the cabinet box is sound, we order genuine KraftMaid replacement doors, drawer fronts, and hardware from authorized distributors. When the line is discontinued or budget is tight, we use color-matched aftermarket hardware and custom doors built by local millwork shops. We don’t claim to stock KraftMaid parts locally, because we don’t. Every part is ordered for your specific job, and we tell you the lead time before you commit.

The repair-versus-replace call follows a simple rule. If the box has structural water damage or widespread glue-line failure, replacement usually costs less over five years than repair. If one drawer or three hinges failed, repair wins. We put both numbers in writing and let the math speak. Call (844) 761-8346 for a free second opinion on any written estimate you already have.

Our KraftMaid Service Process – Step by Step

  1. 1
    Diagnosis. We pull the affected doors and drawers and inspect the cabinet box, face frame, hinge stiles, and drawer joinery. Photos go into your record. We identify the KraftMaid series so the correct OEM part numbers can be matched.
  2. 2
    Written price and recommendation. You get a flat written price and scope for both repair and replacement where both are viable. No signed change order, no work.
  3. 3
    Repair or install. Hinges get replaced with OEM or OEM-style heavier-duty units. Stripped screw holes get filled and redrilled. Delaminated drawer boxes get rebuilt or replaced. New cabinets and countertops get shimmed, leveled, and fastened to the wall per KraftMaid’s install specs.
  4. 4
    Test and document. Every door, drawer, and soft-close mechanism gets cycled. Countertop seams and backsplash joints get inspected. The photo record goes to you.
  5. 5
    Written warranty. The 365-Day Done Right Promise covers the work. If it’s not done right, we make it right.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

KraftMaid Products We Service & Install in Plano

We service and install the KraftMaid lines Plano kitchens and baths actually contain: Vantage series cabinetry, the Cabico series plywood drawer boxes, Sanctuary series bath vanities, and Passage series value-line cabinets. That covers door and drawer front replacement, hinge and glide replacement, refacing, full cabinet installation, quartz and granite countertops, backsplash tile, and kitchen island builds. If you’re remodeling rather than repairing, we install new KraftMaid cabinetry alongside Cambria and Caesarstone countertops, so the quote reflects real material costs instead of padded ones.

We Also Service These Brands

We’re not dependent on any single manufacturer. Kohler fixtures, GAF roofing, PGT windows and doors, and Master Halco fencing all run through the same documented process and the same written-price discipline. If your project mixes KraftMaid cabinets with a Kohler sink and GAF shingles overhead, one quote covers it all.

FAQs – KraftMaid Construction Service in Plano

A new paver pool deck

Service Price Range
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000
Small Kitchen Remodel $9,000 – $20,000
Full Kitchen Remodeling $14,000 – $45,000

A hinge and drawer repair sits far below these ranges; we price it separately once we’ve seen the cabinet. Call (844) 761-8346 for an exact quote. Estimates are free.

Book Your KraftMaid Service in Plano, TX

Whether it’s a sagging Vantage door, a delaminated Cabico drawer, or a full kitchen remodel with new KraftMaid cabinets and quartz countertops, we put the price in writing first. Free estimates, free second opinions on any written estimate you already have, background-checked technicians, and a documented photo record on every visit. Call (844) 761-8346 to schedule your KraftMaid service in Plano.

Written by the team at Rowan Construction Group Plano.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheA remodeled family room with new windows and a window seatA standing-seam metal roof over a covered porchA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fence

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch