A Rowan company - serving Plano, TX
A living room with a wall of new windows and a sliding glass door
PGT · Plano

PGT Construction Service in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
New double-hung windows in a dining room
A new front entry door with glass sidelights
A freestanding soaking tub in a remodeled primary bathroom
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Why Plano Homeowners Choose PGT Construction

We provide independent PGT service in Plano: diagnosis, glazing replacement, sash and hardware repair, and full replacement of PGT WinGuard, Sentinel, and Aluminum Series windows and doors, plus the roofing work that surrounds them. What makes our PGT work different is that we treat each product family on its own terms – laminated impact glass fails differently than a standard insulating unit, and a vinyl slider wears differently than a casement. Rowan Construction Group Plano is an independent contractor and is not affiliated with, authorized by, or sponsored by PGT. Our technicians have up to 19 years of experience, and we put a written price in front of you before any work starts.

Call (844) 761-8346

Why Trust Rowan Construction Group Plano for Your PGT Construction?

A new bay window with a cushioned seat

PGT units are common across Plano’s 1980s – 2000s tract housing and the newer Legacy West infill, which means our crews see the same product families week after week. That repetition matters. We know which sash profiles go brittle after a decade of south-facing sun, which slider roller assemblies wear flat first, and where weep holes clog on a WinGuard door after a hail season. Every visit comes with a documented photo record – close-ups of the failed seal, the track wear, the sill pan – so you see what we found rather than taking it on faith.

On parts, we work OEM-compatible where the line is still supported and use quality aftermarket glazing and hardware when OEM is discontinued or a lead time would leave a window boarded through a Texas summer. Nothing we do involves drilling, retrofitting, or resealing a frame in a way that puts your manufacturer warranty at risk, and we’ll tell you plainly when a repair would cost more than it saves. Under Clause 1 of the Haven Standard, the price is written before anyone picks up a tool – and a free second opinion on any written estimate is a standing offer if you’re weighing two quotes.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Common PGT Construction Problems We Fix in Plano

These are the failures we’re called out for most often on PGT products in Plano, named by line so you can match the symptom to your window:

  • WinGuard laminated-glass seal failure. On impact-rated WinGuard units, the laminate between the two glass layers can develop a seal breach, producing a hazy, milky, or slightly green cast that doesn’t clean off. It’s not dirt and it’s not condensation between panes – it’s desiccation inside the laminated assembly, usually driven by years of heat cycling on west- and south-facing elevations. The frame is often still sound, which is why this is frequently a glazing job rather than a window swap.
  • Vinyl sash and frame distortion on sun-exposed units. Sustained North Texas heat, especially on west-facing walls that bake from 2 p.m. onward, can warp a vinyl sash enough to throw off the lock alignment or leave a visible gap at the weatherstrip. Corner weld separation is the more serious version – a hairline split at the miter where the frame is joined, which lets water past the weather barrier. Heat exposure plus the original builder-grade installation tolerance is the usual combination.
  • WinGuard sliding glass door roller and track wear. A slider that drags, jumps the track, or needs a shoulder to close is almost always worn rollers or a track fouled with grit and hardened debris. Left alone, the door stops seating squarely against the jamb, the lock stops catching cleanly, and water finds its way to the sill.
  • Weep-hole and weatherstripping failure on WinGuard sliders. The sill drainage path on an impact slider depends on small weep holes staying clear and the weatherstripping staying pliable. Hail-driven debris plugs the weeps, sun-hardened stripping stops sealing, and wind-driven rain pushes past the sill pan into the wall cavity. That’s a slow leak most homeowners don’t notice until drywall stains appear on the interior.
  • Aluminum Series thermal movement and sealant failure. PGT’s Architectural Aluminum Series handles heat differently than vinyl – the metal expands and contracts more, which stresses perimeter sealant joints and can open gaps at the head and sill over time. Recaulking and re-flashing the perimeter correctly is usually the fix, not replacing the unit.

PGT Parts & Our Repair-vs-Replace Approach

Installers setting a new window and checking it for level

We source parts job by job rather than claiming a local stockpile. For a supported PGT line, that means OEM sash, rollers, locks, and weatherstripping ordered to your exact unit; when a line is discontinued or the OEM lead time runs past a few weeks, we use quality aftermarket glazing and hardware that matches the original fit and finish. The honest question is always whether the frame is worth saving.

Seal-failed laminated glass on a plumb, sound frame is a glazing replacement – you keep the frame, the hardware, and the impact rating. Frame distortion or corner weld separation on a heat-exposed unit often justifies a full-unit swap, because a warped vinyl frame won’t hold a new sash squarely no matter how good the glass is. We measure, photograph, and tell you which side of that line your window falls on before quoting. Call (844) 761-8346 if you want us to look at a PGT unit and give you a written number.

Our PGT Service Process – Step by Step

  1. 1
    Diagnosis by product line. We identify whether the unit is WinGuard, Sentinel, or Aluminum Series, then inspect the frame for plumb and square, check the laminate for seal breach, and test the slider rollers, track, locks, and weep holes. Photos go in the record.
  2. 2
    Written scope and price. You get a flat written price with a written scope – glazing replacement, hardware swap, sill re-flash, or full replacement – before any work starts. No change proceeds without a signed change order.
  3. 3
    Repair or install. Glazing goes in with correct-fit gaskets and setting blocks; hardware gets replaced with matching parts; sill pans and perimeter sealant are re-flashed where water has already intruded. On a replacement, the rough opening, flashing, and interior trim are finished to match.
  4. 4
    Test and document. Sliders get cycled and checked for a square seat and clean lock engagement; windows get checked for smooth operation and a water-tight perimeter. You receive the photo record of what was found and what was done.
  5. 5
    Warranty. Every job carries the 365-Day Done Right Promise: if it isn’t done right, we make it right. The written warranty is part of the paperwork, not an afterthought.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

PGT Products We Service & Install in Plano

We handle the PGT families you’re most likely to have on a Plano home: WinGuard impact-resistant vinyl windows and doors, WinGuard vinyl sliding glass doors, Sentinel by PGT vinyl windows, and the Aluminum Series (Architectural) windows and doors. Alongside those, we do impact window installation, full window replacement, and roof replacement and installation – the exterior envelope work that goes with getting a Plano house weather-tight on slab foundations and composition-shingle roofs. Our technicians have up to 19 years of experience across these lines, and we order parts to the specific unit rather than guessing at fit.

We Also Service These Brands

We’re not a single-brand shop. Alongside PGT, Rowan Construction Group Plano works with KraftMaid cabinetry, Kohler and Toto fixtures, GAF and Owens Corning roofing, Belgard and Techo-Bloc pavers, and Master Halco fence systems. That matters when a window replacement turns into a siding repair, or a door swap reveals trim and finish work that needs to match the rest of the house. One documented price covers the whole scope, and you’re not chasing a second contractor for the follow-on work.

FAQs – PGT Construction Service in Plano

A new concrete driveway with a paver border

Is Rowan Construction Group Plano authorized by PGT? No. We are an independent PGT service provider and are not affiliated with, authorized by, or sponsored by PGT. We work on PGT products as a trained local contractor, not as a manufacturer representative, and we don’t claim factory certification we can’t produce.

Do you use genuine PGT/OEM parts? We use OEM PGT sash, rollers, locks, and weatherstripping where the line is still supported, and quality aftermarket parts when OEM is discontinued or a lead time would leave your window open. Either way, we tell you which you’re getting before the work starts.

How long does PGT service take? A glazing replacement or hardware swap is typically a same-visit job once parts are in hand; a full-unit window replacement is a scheduled install, and parts for an older or discontinued line can add lead time. We’ll give you a written timeline with the price so you can plan.

What PGT models/series do you cover? WinGuard impact-resistant vinyl windows and sliding glass doors, Sentinel by PGT vinyl windows, and the Aluminum Series (Architectural) windows and doors. If you’re not sure which line you have, the label on the frame or the glass etch usually identifies it – send a photo and we’ll tell you.

Will service void my PGT warranty? A properly executed glazing replacement or hardware swap that respects the frame and the manufacturer’s installation requirements won’t void your warranty. We work to keep the unit within spec, and we’ll flag anything that would put the manufacturer warranty at risk before we touch it.

How much does PGT construction cost in Plano? Typical ranges for the work we do on PGT windows and surrounding envelope:

Service Typical Range in Plano
Impact Window Installation $8,000 – $25,000
Window Replacement $4,500 – $15,000
Roof Replacement $8,000 – $20,000
Roof Repair $400 – $1,800

Most Plano PGT jobs sit in the lower half of those ranges unless you’re replacing a full elevation or addressing water intrusion that reached the wall cavity. Call (844) 761-8346 for an exact written quote – estimates are free.

Book Your PGT Service in Plano, TX

If a PGT WinGuard pane has gone hazy, a slider is dragging and leaking at the sill, or a Sentinel frame has warped in the Texas sun, we’ll diagnose it by product line, put the price in writing, and document the work with photos. Call (844) 761-8346 for a free estimate on PGT service in Plano – a live person answers, and the written price comes before any work starts.

Written by the team at Rowan Construction Group Plano.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A finished backyard cottage with a small covered porchA new roof with clean valleys and new flashingA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patio

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch