







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Kitchen Remodeling in Plano: What to Know First
KraftMaid kitchen remodeling in Plano typically runs $14,000 to $45,000 for a full kitchen and $9,000 to $20,000 for a small or partial remodel, with most projects taking two to five weeks from demolition to final walkthrough. We quote a flat written price with a written scope before anyone picks up a tool, and no change proceeds without a signed change order. That’s Clause 1 of The Haven Standard, and it’s why our projects land within a few percent of the number the customer agreed to.
This page is for Plano homeowners who already have KraftMaid cabinets in the kitchen – whether you’re keeping the boxes and refacing, replacing the doors and drawer fronts, or tearing out to the studs and starting over. If that’s you, call (844) 761-8346 and we’ll put a number in writing. As an independent KraftMaid service provider, we work on the product; we’re not affiliated with or authorized by the manufacturer.
Key Takeaways
- KraftMaid full kitchen remodels in Plano: $14,000 – $45,000. Small or partial: $9,000 – $20,000.
- We know which KraftMaid lines are common in Plano homes and what actually goes wrong with each.
- Flat written price, written scope, signed change orders, 365-Day Done Right Promise.
- Free second opinion on any written estimate – we’ll review a competitor’s quote line by line.
How KraftMaid Products Fail – and How We Fix Them
KraftMaid builds a solid cabinet. What we find in Plano kitchens isn’t a manufacturing problem so much as an installation and climate problem – and the two interact in ways that are specific to this product line. Here’s what we actually see when we open a KraftMaid kitchen in Plano and what we do about it.
- Drawer glides that bind after four or five summers. The standard side-mount epoxy glides on older KraftMaid base cabinets collect dust and cooking grease, and North Texas humidity swells the wood slightly, so a drawer that slid fine in March drags by August. We replace with full-extension soft-close undermount glides sized to the existing box – not a generic retrofit that leaves a gap at the back. The fix is a hardware swap, not a cabinet replacement.
- Door and drawer-front finish checking on painted maple. KraftMaid’s painted maple fronts are common in Plano’s 1990s and 2000s builds, and the joint between stile and panel is where paint first cracks. In a kitchen with a gas range and no dedicated hood venting to the exterior, the grease film accelerates it. We sand, prime, and repaint to the original sheen, or replace the fronts entirely if the checking has gone past the surface.
- Sagging shelves in wall cabinets over the range. The adjustable shelf pins on KraftMaid wall cabinets are rated for a normal load, not for a stack of cast-iron skillets. When we see a bowed shelf, we add a mid-span support or swap to a fixed shelf with a cleat – and we check the cabinet’s attachment to the wall, because a shelf doesn’t sag in isolation.
- Water damage under the sink from a slow supply-line weep. This is the failure that turns a refacing job into a cabinet replacement. The particleboard box swells and never comes back. We probe the substrate with a moisture meter before we quote refacing, because quoting refacing on a swollen box and discovering it mid-job is exactly the kind of surprise a signed change order exists to prevent.
- Countertop seams that open over the dishwasher. Heat and moisture from the appliance cycle push a laminate or solid-surface seam apart over time. We reseat and re-seal the seam, or if the countertop is at the end of its life, we quote a replacement in Cambria or Caesarstone with a seam placed away from the heat source.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our KraftMaid Kitchen Remodeling Process
Every KraftMaid job in Plano follows the same sequence, whether it’s a $2,500 backsplash or a $45,000 full remodel. The order matters as much as the work.
- 1
On-site assessment with a written scope. We open doors, pull drawers, meter the substrate under the sink, and photograph everything. The photo record is included on every visit, not sold as an upgrade – you leave with evidence of what we found.
- 2
Parts and product decision. Where a KraftMaid OEM part is still available and the box is sound, we spec OEM. Where it isn’t, or where a quality aftermarket part is the better call for the money, we name the part, the brand, and the price difference in writing so you can decide.
- 3
Flat written price and signed scope. The quote is a flat number with the scope and a written warranty. No “call for a quote.” If the scope changes later, no work proceeds on the change until the change order is signed.
- 4
The work. Background-checked, uniformed technicians arrive on schedule, protect the floors and counters, and work in sequence so you’re never without a functioning kitchen for longer than the scope requires.
- 5
The test and the walkthrough. Every drawer opens and closes, every door is adjusted for reveal, every seam and caulk line is checked. We walk the kitchen with you and hand over the photo record and written warranty.
- 6
The guarantee. The 365-Day Done Right Promise backs the work for a full year. If it isn’t done right, we make it right.
What KraftMaid Kitchen Remodeling Costs in Plano

These are the numbers we quote in Plano, not national averages. They’re flat prices with a written scope attached.
| Scope | Typical Price Range |
|---|---|
| Full kitchen remodel (KraftMaid cabinets, counters, backsplash, flooring) | $14,000 – $45,000 |
| Small or partial kitchen remodel | $9,000 – $20,000 |
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
Three things move the price on a KraftMaid job: whether you’re keeping the boxes, the countertop material, and how much plumbing or electrical has to move. Refacing costs less than replacement because the boxes stay. A Cambria quartz top costs more than laminate. Moving the sink or the range doubles the labor on that wall.
Call (844) 761-8346 to schedule your free estimate. Bring a competitor’s written quote and we’ll review it line by line at no charge.
See the difference
Before
After
Before
After
Before
AfterWhy Plano Homeowners Call Rowan Construction Group Plano for KraftMaid Work
Because we show the work instead of describing it. Our technicians have up to 19 years of experience, and they know what a KraftMaid drawer box looks like when it’s been in a Plano kitchen through fifteen summers – which is a different piece of knowledge than knowing how to hang a generic cabinet. We’ve delivered 4,000-plus projects, every one quoted with a flat written price before work started, every one with a documented photo record when the crew left.
The 365-Day Done Right Promise is printed on the page and backed by a terms page. Calls are answered by a live person, and every crew member is background-checked and uniformed before they arrive. When a KraftMaid job needs a product outside the cabinet box – a Kohler faucet, a GAF or Owens Corning roof over the addition, PGT windows, a Master Halco fence – we carry the sourcing depth across fifty-plus vetted brands that keeps the written quote honest instead of inflated.
FAQs

It can, if the work compromises the cabinet or the installation. KraftMaid’s warranty covers the cabinet as manufactured; it doesn’t cover damage from a remodel, and an improper installation can void it. We work to warranty-safe practice on every KraftMaid job in Plano – we don’t drill into a finished door face, we don’t alter the box in a way that changes its structural rating, and we document the cabinet’s condition before we start so there’s a record. If warranty coverage is a concern on your kitchen, call (844) 761-8346 and we’ll walk through what’s covered and what isn’t.
Usually, yes – some series and finishes are still orderable and some are discontinued. KraftMaid has retired certain door styles and stains over the years, and a discontinued front means a color or profile match that isn’t exact. We check availability by series and finish before we quote a refacing job, and if the exact match is gone we tell you in writing rather than letting you discover it at install. Call (844) 761-8346 for a free estimate and we’ll check your specific door style.
Reface if the boxes are sound and the layout works; replace if the boxes are swollen, the layout doesn’t fit how you cook, or you want a different footprint. The deciding factor is almost always the substrate under the sink and the condition of the box joints – a moisture meter answers it in five minutes. Refacing typically lands in the $4,000 – $13,000 cabinet installation range in Plano, while a full replacement with new KraftMaid boxes runs toward the top of the $14,000 – $45,000 range. Call (844) 761-8346 and we’ll meter it and tell you which one you’re looking at.
Two to five weeks for most full remodels, and a backsplash or a countertop swap is often a few days. The timeline depends on whether the cabinets are being refaced in place or replaced, whether plumbing and electrical move, and the lead time on the countertop material – quartz templating and fabrication adds roughly a week. Your written scope includes a schedule. Call (844) 761-8346 to schedule your free estimate.
No, not without a signed change order. The flat written price is the price, and the only thing that moves it is a change you approve in writing before the work proceeds – which is the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs. If we open a wall and find something the assessment couldn’t see, we stop, photograph it, quote the change, and wait for your signature. Call (844) 761-8346 for a free estimate with the number in writing.
Get Your KraftMaid Kitchen Priced in Writing
Call Rowan Construction Group Plano at (844) 761-8346 to schedule your free estimate on your KraftMaid kitchen remodel. You’ll get a flat written price, a written scope, and a written warranty before any work starts – and a free second opinion on any competitor’s quote if you’d like one reviewed line by line. No work proceeds on a change until the change order is signed, and the 365-Day Done Right Promise backs every job for a full year.
Written by the team at Rowan Construction Group Plano, serving Plano and nearby areas.












