A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Toto · Plano

Toto Bathroom Remodeling in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A new paver patio with a seat wall and fire pit
A single-story rear room addition with tall windows and a new patio
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Toto Bathroom Remodeling in Plano: What to Know First

We provide independent Toto bathroom remodeling in Plano, and most jobs run $9,000 – $28,000 for a full remodel or $5,000 – $12,000 for a smaller bathroom. A typical bathroom takes two to four weeks of scheduled work, and you get a flat written price before anyone picks up a tool. This page is for Plano homeowners who own Toto fixtures (the Washlet, the Drake and EcoPromenade lines, the Ultramax, and the ones we get asked about most) and want a remodel that keeps the good parts of those fixtures and fixes the joints, tile, and valve work around them. Call (844) 761-8346 for a free estimate.

Call (844) 761-8346

We’re an independent Toto service provider. We’re not affiliated with or authorized by Toto, and we won’t pretend otherwise. What we can show you is the documentation, the written price, and the crew record.

How Toto Products Fail – and How We Fix Them

A tile setter installing wall tile in a shower

Toto makes durable fixtures, but Plano homes put them under specific stress: hard water from the North Texas supply, slab foundations that shift with our clay soil, and bathroom humidity from a climate with four to six months of summer heat. Here’s what we actually find and what we do about it.

  • Supply-line and fill-valve mineral scale on the Drake series. The Toto Drake (CST776, CST746) is the most common toilet we see in Plano homes because builders installed them for years. The fill valve and supply line scale up fast in Plano’s water, which shows up as a slow or ghost-flush that the owner hears at midnight. We don’t just replace the valve: we pull the tank, check the refill tube and gasket, and flush the line clear before installing the OEM Toto fill valve. Aftermarket valves fit but they change the fill timing and can void the Toto warranty on the tank, so we quote both and let you decide.
  • Washlet bidet-seat failures. The Toto Washlet (S550e, C5, C200, and the newer C410) fails in one of two ways here: the seat heater pump or the spray nozzle clogs from mineral deposits, or the supply connection at the T-adapter weeps. Both are repairable on most models with OEM parts. We replace the internal water filter and nozzle assembly, pressure-test the T-adapter, and reseat the seat to the bowl so there’s no flex. If the logic board is gone, we say so and quote a replacement grade rather than a rebuild.
  • Ultramax and Ultramax II tank-to-bowl seal leaks after slab movement. Plano sits on expansive clay. When the foundation shifts, the porcelain tank-to-bowl gasket can compress unevenly and seep at the base. We replace the gasket with the correct Toto part (the sizes differ across Ultramax and Ultramax II generations), set the toilet level on a fresh wax ring, and check the flange height. That’s a bathroom-remodeling fix, not a toilet-part fix, because the floor and flange are often the deeper problem.
  • EcoPromenade and one-piece toilets with cracked or warped seats and lids. The seat hinge and lid on one-piece Toto toilets take abuse in a family bathroom and crack at the hinge post. OEM lids and seats are available; aftermarket lids often don’t align. We fit the correct Toto seat and confirm the slow-close mechanism seats flush to the bowl rim. If the bowl itself is chipped, that’s a replacement conversation, which is what a remodel is for.
  • Washlet electrical and vent fan integration in older Plano bathrooms. Many Plano homes built before 2005 have a bathroom outlet that was never GFCI-protected and a vent fan sized for a smaller bathroom. A Washlet needs a dedicated GFCI outlet and a properly vented room. We check the circuit, add the GFCI, and spec a fan that moves enough air for the room’s square footage. This matters more here than in cooler climates, where humidity doesn’t hang in the room the same way.

If a fixture isn’t in our pricing or the model isn’t listed, call us and we’ll tell you what we’ve seen in Plano. Nobody wins from guessing on a quote.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Toto Bathroom Remodeling Process

Here’s what a Toto job looks like from the first call to the last photo:

  1. 1
    Diagnostic visit. We inspect the fixture in place, photograph the condition, and confirm the model number from the tank stamp or the seat tag. The photo record is included, not an add-on, and you get it whether you hire us or not.
  2. 2
    Written scope and flat price. We write down the scope: fixture, tile, membrane, valve, vent fan, GFCI. The range you see on this page ($9,000 – $28,000) becomes a specific number for your bathroom. No “call for a quote.”
  3. 3
    Parts decision, in writing. OEM Toto parts where they matter to fit and warranty, quality aftermarket where they don’t. We show you both lines on the quote so the difference is visible.
  4. 4
    Work. Everything from demolition to tile to setting the fixture. Any change to the agreed scope stops until a change order is signed, which is the discipline that keeps projects within a few percent of the number you agreed to.
  5. 5
    Test and documentation. We run the fixture through cycles, check for weeps, and leave you the photo record and the written warranty.
  6. 6
    365-Day Done Right Promise. If something isn’t right within the year, we make it right. The guarantee is printed, not hidden in an asterisk.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Toto Bathroom Remodeling Costs in Plano

A remodeled family room with new windows and a window seat

Here are the line-item ranges we quote in Plano. Bring us a competitor’s written estimate and we’ll review it line by line at no charge.

Item Typical Range in Plano
Full bathroom remodel $9,000 – $28,000
Small bathroom remodel $5,000 – $12,000
Walk-in shower installation $4,500 – $12,000
Tub-to-shower conversion $3,500 – $10,000
Shower replacement $3,000 – $8,500
Bathroom vanity installation $800 – $3,000

What moves the price: whether the Toto fixture stays or is replaced, tile selection (porcelain vs. natural stone), whether the shower gets a waterproof membrane and a new pan, and whether the electrical for a Washlet or vent fan needs a new circuit. A fixture that’s repaired rather than replaced keeps cost down; a full gut with new waterproofing brings it toward the top of the range. Call (844) 761-8346 for a free estimate and a written price before any work starts.

Why Plano Homeowners Call Rowan Construction Group Plano for Toto Work

Every project is quoted at a flat written price before work begins, with a written scope and a written warranty. No work proceeds on a change until the change order is signed. That’s a record, not a slogan. Our technicians have up to 19 years of experience across the trades, and the crews are background-checked, uniformed, and arrive with a documented photo record on every visit. A live person answers the phone (you won’t get a voicemail tree). When a Toto job touches materials beyond the fixture, we source across brands we already know well, including KraftMaid and Kohler for the rest of the bathroom, plus GAF and PGT when the job wraps in roofing or windows. You also get a free second opinion on any written estimate, and the 365-Day Done Right Promise stands behind the work for a year. Call (844) 761-8346 and we’ll walk you through what your bathroom needs.

FAQs

A standing-seam metal roof over a covered porch

Does a bathroom remodel void my Toto warranty? No, as long as the fixture itself is installed with Toto-approved parts and according to Toto’s installation specs. We use OEM Toto parts on the fixture and keep the receipt and the photo record, so if a warranty claim ever comes up, you have documentation. Cosmetic work around the bathroom doesn’t affect the fixture warranty. Call (844) 761-8346 for a free estimate.

Can you get Toto replacement parts, or do I have to buy them online? We source OEM Toto parts directly, and in most cases we have them in hand for the diagnostic visit. For less common models we’ll tell you the lead time upfront rather than leave you guessing. Call for availability on your model.

Should I repair my Toto toilet or replace it during the remodel? Repair, usually. The Drake and Ultramax are built to last, and a fill valve or gasket repair is a fraction of the cost of a new fixture. We replace only when the bowl is cracked or the model is discontinued and parts are locked. We walk you through both numbers on the quote.

How long does a Toto bathroom remodel take in Plano? A full bathroom runs two to four weeks of scheduled work; a smaller remodel runs one to two. We give you a start date and a finish date in writing, and the schedule doesn’t move because of a change order without your signature.

Why do Toto fixtures fail faster in Plano? Hard water and slab movement. Plano’s supply scales up fill valves and Washlet filters, and the expansive clay under most Plano slabs can shift a toilet base enough to break a tank-to-bowl seal. Both are fixable, and both are part of the diagnostic we run on every job. Call (844) 761-8346 for a free estimate.

Reach Rowan Construction Group Plano at (844) 761-8346 for a free estimate on your Toto bathroom remodeling project. You’ll get a written price, a written scope, and a photo record, no matter what you decide.

Written by the team at Rowan Construction Group Plano.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA new bay window with a cushioned seatA new wood side gate with black hardware

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch