A Rowan company - serving Plano, TX
A worker laying floor protection before work starts

Our Guarantee & Warranty - Rowan Construction Group Plano

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

The Rowan Construction Group Plano Guarantee

When we say we stand behind our work in Plano, we mean three things you can hold in your hand: a flat written price you agreed to before anyone picked up a tool, a documented photo record of what we found and what we did, and the 365-Day Done Right Promise. If something we installed or built fails to perform, Rowan makes it right. No handshake, no verbal comfort, no asterisk. The guarantee is printed on every page we hand you and backed by a terms page you can read before you sign anything.

Call (844) 761-8346

What’s Covered

  • Workmanship on every trade. Whether we’re setting Belgard pavers on a Plano driveway, hanging a GAF roof, or setting KraftMaid cabinets in a kitchen, the labor that goes into the install is covered under the 365-Day Done Right Promise. If it wasn’t done right, we come back and make it right.
  • The written price, honored. Under Clause 1, the price is written before anyone starts. That number doesn’t drift because a substrate was harder than expected or a shingle layer ran deeper than we counted. If a genuine change comes up mid-job, no work proceeds until you sign a change order – which is why our projects finish within a few percent of the number you agreed to.
  • Parts and materials handled honestly. We source from more than fifty vetted brands – Cambria and Caesarstone for counters, Owens Corning and GAF for roofing, Kohler and Toto for fixtures, Techo-Bloc for hardscape. When a material arrives wrong or damaged, that’s on us to swap, not on you to argue about.
  • Cleanup, documented. Every visit includes a photo record as a standard deliverable – not an upgrade. You leave with evidence of what the crew found, what they did, and what condition they left the site in.
  • Arrival you can plan around. Crews are background-checked and uniformed, and a live person answers your call any hour. You’ll know who’s coming and roughly when, and you can reach a human if the plan shifts.
  • Free second opinion on any written estimate. Bring a competitor’s quote and we’ll review it line by line at no charge. If their number is fair, we’ll tell you so.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Satisfaction Promise

If you’re not satisfied with completed work, call us and describe what’s wrong. We’ll ask for the photo record – the one from the visit – so we can see the condition for ourselves before we respond. Then we inspect in person and correct the issue under the 365-Day Done Right Promise. What we won’t do is send a generic apology and disappear. Your call reaches a live person any hour, and the promise carries a real terms page behind it, so there’s nothing vague to argue about later. If a repair we made within the year fails again, that’s a callback we own. If the failure traces to something we should have caught at inspection – a soft substrate under pavers, a leak at a window opening we sealed – we fix it. If a change is needed beyond the original scope, we write it up and price it before anyone proceeds, so you never get a surprise invoice. The promise is simple: do it right, and if we didn’t, do it again on us.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Licensed & Insured Backing

A guarantee is only as good as the company standing behind it. Rowan Construction Group Plano operates as licensed and insured, and every crew member is verified before they arrive at your door. That matters in a market where unlicensed crews underbid and then vanish when something goes wrong a season later. Licensing means the work meets Texas standards and inspections pass. Insurance means that if a crew member is hurt on your property, or something gets damaged during the job, you’re not the one absorbing the cost. Every one of the more than 4,000 projects we’ve delivered was backed this way – licensed, insured, and documented. That’s the difference between a promise on paper and a promise a company can actually keep.

Questions Plano Homeowners Ask About the Guarantee

Does the guarantee cover the materials or just the labor?

The 365-Day Done Right Promise covers the workmanship we perform. Manufacturer warranties on products like GAF shingles or Kohler fixtures run on their own terms, and we’ll walk you through what each product carries at the quote stage so there are no surprises. Call (844) 761-8346 for a written scope that spells out both.

What if I’m not happy with part of a finished remodel?

Call us and describe the issue. We’ll pull the photo record from the visit, inspect in person, and correct it under the promise. You don’t need to fill out a form or wait on hold – a live person answers. Estimates and second opinions are free, and so is the call.

Will the price change once work starts?

No, not without your signature. Under Clause 1, the price is written before anyone starts, and no change proceeds until a change order is signed. That discipline is why projects finish within a few percent of the agreed number. Call (844) 761-8346 to get your written price.

Do you pull the permits?

Yes. Permitted work – additions, ADUs, roofing, structural changes – gets pulled and inspected. Licensing and insurance are in place, and inspections pass as part of the job, not as an afterthought. Call us to confirm what your specific Plano project requires.

How long does the guarantee last?

The 365-Day Done Right Promise covers workmanship for one year from completion of the job, and the terms are printed on every page you receive – no asterisk, no buried clause. Call (844) 761-8346 with any question about what’s covered before you sign.

What’s the Free Second Opinion?

Bring a competitor’s written estimate and we’ll review it line by line at no charge. If their price is fair, we’ll say so. It’s a standing offer, not a sales tactic. Call (844) 761-8346 to schedule yours.

Written by the team at Rowan Construction Group Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch