A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Bathroom Remodel Cost in Plano - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Bathroom Remodel Cost in Plano, TX: What the Number Actually Includes

A Plano bathroom remodel typically costs $9,000-$28,000, with primary bath guts running $18,000-$45,000 and hall bath updates landing at $9,000-$18,000. Those numbers hold only when the substrate behind the tile is sound. In Plano’s 1980s-2000s tract homes, it often isn’t. Call (844) 761-8346 for a written price before anyone picks up a tool. Estimates are free, and we’ll tell you upfront whether substrate replacement belongs in your scope.

A tile setter installing wall tile in a shower

Why Plano Bathroom Remodel Costs Run Higher Than the National Average

Behind the tile in a 1990s Plano bathroom, there’s a strong chance you’ll find moisture-damaged greenboard drywall. That’s not a scare tactic. It’s what our documented photo records show across bathroom projects in Plano’s tract-home subdivisions: Deerfield, Willow Bend, Russell Creek, and the older infill around Legacy West.

Builder-grade construction in that era used greenboard – a paper-faced drywall rated “moisture resistant” – in wet areas. It resists humidity. It does not resist the slow wicking that happens behind a shower surround over ten or twenty years. By the time a homeowner notices soft grout or a loose tile, the paper face has absorbed moisture and the gypsum behind it has started to crumble. The tile still looks fine from the outside. That’s the silent-failure problem.

In sandier or rockier metros, a bathroom remodel is closer to pure cosmetics. In Plano, it’s often substrate surgery. The city is built-out and largely master-planned, so nearly every job here is renovation of 1980s-2000s housing rather than new construction. The original builder-grade systems are hitting end-of-life at roughly the same time. That’s a concentrated remodel market, and it’s why the cost you read online rarely matches the cost you hear from a Plano contractor standing in your bathroom.

What a Plano Bathroom Remodel Costs, Line by Line

Here are the ranges we work from in Plano, calibrated to local labor and material costs. Every one of these is a flat written price with a written scope before work begins. Under Clause 1 of The Haven Standard, the number is on paper first; “call for a quote” isn’t part of how we operate.

Scope Typical Plano Range
Hall bath update (fixtures, vanity, tile refresh) $9,000-$18,000
Primary bath gut remodel (Kohler or Toto fixtures, Cambria or tile surround) $18,000-$45,000
Walk-in shower conversion from tub $12,000-$28,000
Walk-in shower installation (no tub removal) $4,500-$12,000
Tub-to-shower conversion $3,500-$10,000
Shower replacement (like-for-like) $3,000-$8,500
Vanity installation $800-$3,000
Small bathroom remodel (under 40 sq ft) $5,000-$12,000
Cement-board substrate replacement (wet-area upgrade) $800-$2,500
An open kitchen and dining area after a remodel

The Greenboard-to-Cement-Board Upgrade: Why It Isn’t Optional in Plano

Plano summers push humidity high enough that a bathroom without a proper moisture barrier stays damp long after the shower stops. Greenboard doesn’t fail because it’s a bad product. It fails because it was asked to do a job it wasn’t designed for.

Our standard spec replaces it. In the wet areas, we install cement board – HardieBacker is our default, with Schluter Kerdi waterproofing membrane on top. Cement board won’t crumble when it gets wet; Kerdi decouples the tile from minor substrate movement and keeps moisture out of the wall assembly entirely. Together they add $800-$2,500 to the job, depending on wet-area square footage.

Skip that step and you’ll likely be tearing the shower apart within five years. The $800-$2,500 you saved turns into a repeat remodel. We’ve walked into Plano bathrooms where the previous tile-out was done on fresh greenboard, and the failure started almost immediately.

If you want the full scope of what we handle, our Bathroom Remodeling service page lays out the process end to end, from demo to final walkthrough.

Fixtures That Hold Up in Plano’s Water

Plano draws from a mix of surface and groundwater sources, and that blend leaves mineral deposits on fixtures faster than national averages suggest. Faucet aerators clog. Shower glass spots. Chrome pits. The fix isn’t a water softener; it’s spec’ing materials that tolerate hard water from the start.

We name the brand and the model in the written quote. Two we spec regularly:

  • Kohler – specifically the DTV digital valve system, which lets you set a precise temperature instead of nudging a single-lever handle every time. Fewer moving parts in the valve body means fewer failure points in a hard-water household.
  • Toto – the Tornado Flush system, which uses a cyclonic rinse rather than full-bowl gravity-feed. Better solids clearance, and less mineral buildup in the bowl under Plano’s water conditions.

On faucets, we lean toward matte and brushed finishes where the coating spec is rated for hard water, and we’ll flag it in the quote when a finish won’t hold up. The full detail on materials and process is on our home page.

What the Photo Record Actually Shows You

Every visit comes with a documented photo record, included as standard. It’s not an upgrade. Here’s what it captures, and why it matters to a Plano homeowner deciding whether a contractor is being straight with them:

  • Before demo: photos of the original substrate, so you see the moisture damage we found and you can compare it to the photos a contractor who skipped demo might have shown you.
  • Mid-project: photos of the waterproofing membrane installed and sealed, before tile goes over it. This is the layer you can never inspect again once the job is done.
  • Post-tile: photos of the finished surface, seams, and edges.

You’ll also get a documented photo record of the plumbing rough-in and drain work. If you’re ever selling the home, that file is documentation of what was done behind the wall. And if something fails within the first year, the 365-Day Done Right Promise is backed by those photos – we can see exactly what was installed and fix it correctly.

The Plano permitting process adds its own layer. Permits, inspection timing, and HOA overlays (Legacy West and the older Willow Bend and Deerfield subdivisions each have their own approval layers) affect the schedule. Our written scope names the permit work explicitly so you know what’s covered.

FAQs

Get a Written Price Before You Commit

Rowan Construction Group Plano has been putting the number on paper since 2007 across more than 4,000 projects. Every crew is background-checked and uniformed. A live person answers our line, day or night. And every visit comes with a documented photo record, included. Bring a competitor’s estimate and we’ll review it line by line at no charge. Call (844) 761-8346 for your free estimate on a Plano bathroom remodel.

Written by the team at Rowan Construction Group Plano, serving Plano, TX.

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346

Request a Free Estimate

Tell us what's going on in Plano. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch