A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Princeton, TX

Bathroom Remodeling in Princeton - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Princeton

If you own a home in Princeton, you already know the town looks two ways at once. Drive through 75407 and you’ll pass small-town houses on generous lots, then round a bend into a subdivision that didn’t exist ten years ago. We work in both, and we quote both the same way: a flat written price before anyone lifts a tile. A full bathroom remodel in Princeton runs $9,000 – $28,000, and you’ll have that number in writing, not a verbal ballpark. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Princeton’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

We’re a construction contractor, not a bath-and-tile-only shop, and that shows up the moment an older Princeton wall comes open. Rowan works under The Haven Standard, which means every ballpark becomes a written scope and a flat price before work starts. We don’t wander off into unrelated trades; bathrooms are one of seven we run, and it’s the one where hidden surprises do the most damage to a budget.

Princeton customers tell us the same thing: they read the three-star reviews, they wanted the range on the page first, and they wanted a text confirmation instead of a phone promise. Our technicians have up to 19 years of experience, and every one is background-checked and uniformed before they reach your door. Every visit includes a documented photo record as a standard deliverable, so you see what we found in the substrate and framing, not just what we installed.

We’re set up to move between brand-new tract construction and aging edge-of-town properties inside the same service area. That range is what Princeton needs. Sourcing runs deep too: Kohler and Toto fixtures, KraftMaid and Wellborn cabinetry, Cambria quartz and Caesarstone counters across fifty-plus vetted brands. If you have a written estimate from another contractor, bring it. Our Free Second Opinion reviews it line by line at no charge.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in Princeton

Three of these cover most of the work we do in Princeton. If you’re weighing a full remodel against a targeted install, our Bathroom Remodeling team walks the room with you and prices both.

Full Bathroom Remodeling

Full gut-and-rebuild is where the permit and inspection spine below matters most, because old Princeton homes are where rough-in plumbing and electrical surprises turn up. We open the walls under permits, order inspection sign-off on the rough-in before anything is closed back up, and price each surprise as a signed change order. You approve it in writing before we touch it.

Walk-In Shower Installation

A walk-in shower installation in Princeton runs $4,500 – $12,000 and comes down to waterproofing, not glass. We build a proper membrane over the substrate and set tile over a surface that won’t leak into the framing behind it. That’s the difference between a shower that looks done and one that stays dry.

Tub-to-Shower Conversion

Tub-to-shower conversion in Princeton costs $3,500 – $10,000 and is the single most popular change we make in older small-town homes, since the tub is the first thing to go. Pulling the tub exposes the subfloor and the drain, and that’s where we slow down. If the deck is soft, we repair it before the new pan goes in.

Vanities, Tile & Fixtures

A vanity install runs $800 – $3,000, and we’ll spec Kohler or Toto fixtures and a Cambria or Caesarstone top so the numbers in your written quote are honest, not padded. Tile is where we obsess over the substrate beneath it. Tile is only as good as the surface it’s bonded to.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Princeton

The brands below live in the written quote, not on a showroom floor we don’t have. We don’t stock parts locally, and we don’t pretend to. When your plan calls for modular fabrication – Mighty Buildings, Boxabl, Plant Prefab – we work the site-built connections around it, so the modular rough-in and the site plumbing meet where they’re supposed to. Kohler fixtures, KraftMaid cabinetry and Cambria tops all get named in your quote with real numbers. Turnaround stays tight because the sourcing is documented before the crew shows up.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Bathroom Remodeling Problems We See in Princeton Homes

  • Walls closed before inspection sign-off. On rough-in plumbing and electrical, a contractor who skips the inspection forces a re-open later and a costly change order. We get the sign-off before the drywall goes back.
  • Failed waterproofing tiled over. In older small-town homes, a shower that was leaking behind the tile gets covered with new tile rather than repaired. It leaks again within a season or two, and the framing rots further.
  • Quotes with no allowances. A written contract with no line for outdated wiring or framing repair balloons the moment the walls come open. We write those allowances in from day one.
  • Expansive clay soil under the slab. The ranch and agricultural land that Princeton’s subdivisions sit on means soil that swells and shifts, which stresses framing and moves cast-iron or PVC drain lines under the floor. It’s why we inspect the drain before a shower pan or vanity goes in.

Pricing for Bathroom Remodeling in Princeton, TX

A new white vinyl privacy fence with a double gate

Here’s the number you can screenshot and compare. Line items below reflect Princeton’s market, and they’re the exact ranges that go in your written quote.

Service Princeton price range
Full Bathroom Remodel $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Bathroom Vanity Installation $800 – $3,000

What moves a Princeton number is what’s behind the wall: framing repair, wiring brought up to current code, and drain work if the slab has shifted. Under Clause 1 of the Haven Standard, the price is written before anyone starts, and no change happens without a signed change order. That discipline is why projects finish within a few percent of the agreed cost. Call (844) 761-8346 for an exact quote; estimates are free.

We Also Serve Cities Near Princeton

Princeton isn’t the only place we work along the corridor. People in Princeton regularly ask us about the neighbors, so here it is: we also remodel bathrooms in McKinney, Fairview, Lucas, and Melissa. Same written price, same change-order discipline, same photo record when the crew leaves. Call (844) 761-8346 to schedule.

Serving Princeton, TX – Our Local Coverage Area

We serve Princeton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in Princeton

New painted shaker cabinets with an organized deep drawer

Why Princeton Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Princeton.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Princeton

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Princeton Customers Say

Trusted by homeowners across Princeton and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA single-story rear room addition with tall windows and a new patioA galley kitchen opened up to the dining room with a new peninsula

More services in Princeton

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Princeton?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Princeton.

(844) 761-8346

Request a Free Estimate in Princeton

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch