







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Construction Before & After in Plano, TX
Claims are cheap. Finished work isn’t. These are the kinds of transformations we deliver across Plano: a failing fence line rebuilt, a dated kitchen reconfigured, a roof torn down to the deck and replaced. Each entry shows the problem we found, what the crew did, and what the homeowner ended up with. Every project in Plano starts with a flat written price and ends with a documented photo record you keep.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Recent Transformations
These write-ups reflect representative Plano construction jobs by trade. Photos drop into the frames below as crews finish and document each one; captions identify the service so you can match a result to your own project.
Fence Replacement in a Willow Bend Backyard
Before
AfterThe problem: The original board-on-board cedar fence had heaved and twisted along a shared property line, and several posts were loose in the root ball from storm-season soil movement. What we did: We pulled the failed run to the posts, set new concrete footings, and rebuilt in cedar with a fresh stringer layout. The result: A plumb, tight fence line that closes the gaps and stands up to North Texas wind, with the before-and-after documented in the photo record.
Dated Kitchen Reconfigured in West Plano
Before
AfterThe problem: A 1990s galley layout closed off the kitchen from the living area, and the builder-grade cabinets had sagged at the hinges. What we did: We opened the wall to the living room, set KraftMaid cabinetry on a leveled run, installed Cambria quartz counters, and rebuilt the lighting. The result: An open, working kitchen with a flat written price before demo, and no change walked out the door without a signed change order.
Roof Replacement After Storm Damage in Plano
Before
AfterThe problem: Hail had bruised the shingles and lifted flashing at the valleys, and the deck showed soft spots once we inspected under the surface. What we did: We tore off to the deck, replaced the soft sheathing, and installed GAF architectural shingles with new underlayment and flashing. The result: A sealed, weather-tight roof that passes inspection, with the condition of the substrate documented in photos rather than described in a sales pitch.
Bathroom Update in a Plano Ranch Home

The problem: The original shower held a failing tile membrane, and the fixtures were the builder’s original set from decades ago. What we did: We rebuilt the shower with a proper waterproof membrane, reset the tile wall to the pan, and installed Kohler fixtures and a new vanity. The result: A watertight, updated bath with a written scope and a written warranty in hand before the first tile was set.
Driveway and Paver Walkway in East Plano

The problem: The old concrete drive had cracked along the control joints and settled toward the garage, pooling water after every rain. What we did: We removed the failed slab, corrected the base, poured a new drive at the right slope, and set a Belgard paver walkway to the front door. The result: A flat, well-drained drive that directs water away from the foundation, with the base prep and finished grade shown in the photo record.
Fence Line Rebuilt Along a Plano Property Boundary

The problem: Wind had pushed the fence out of line and the gates dragged at the latch side. What we did: We set new posts, re-strung the rails true to line, and hung gates with proper swing clearance. The result: A fence that latches cleanly and holds its line, documented at each stage so you can see the difference for yourself.
Want Results Like These?
Bring us the project. We’ll name a flat written price before any work starts, hand you a written scope, and back it with the 365-Day Done Right Promise. Have a competitor’s estimate? Get a free second opinion, line by line. Call (844) 761-8346 to schedule your free estimate with Rowan Construction Group Plano.
Written by the team at Rowan Construction Group Plano.
See the difference
Before
After
Before
After
Before
After


