A Rowan company - serving Plano, TX
A new herringbone paver driveway
Belgard · Plano

Belgard Driveway & Pavers in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new concrete driveway with a paver border
A new paver patio with a seat wall and fire pit
A remodeled hall bathroom with subway tile and a floating vanity
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Belgard Driveway & Pavers in Plano: What to Know First

We install and repair Belgard paver driveways, patios, walkways and pool decks across Plano as an independent Belgard service provider, and most residential jobs run three to six days from tear-out to cleanup. Paver driveway installation in Plano typically lands between $7,000 and $18,000, and you get that number in writing before anyone picks up a tool. The page is for homeowners whose Belgard surface is lifting, settling, draining wrong or due for replacement, and who want the price on the page before they call.

Call (844) 761-8346

We’re not affiliated with or authorized by Belgard, and we don’t pretend otherwise. We’re a Plano construction contractor with up to 19 years of technician experience on hardscape, and we quote a flat written price with a written scope and warranty every time.

How Belgard Products Fail – and How We Fix Them

Belgard makes good pavers. Most of what goes wrong on a Plano Belgard driveway isn’t the paver itself. It’s the base under it, the joint sand in it, or the water that should have drained off it and didn’t. Here are the five failures we see most in Plano.

  • Rutting and settling in the drive lane. Belgard’s Urbana Stone and Catalina Slate pavers get laid on a base that was compacted once and never proven. Plano’s black clay soil swells when it’s wet and shrinks when it’s dry, and a driveway that’s fine in March can show a depression at the tire tracks by August. We pull the affected field, re-tighten the base in lifts with a plate compactor, and re-set on a fresh bedding layer. The paver survives. The base is what we replace.
  • Bulging and “tenting” at the edge. This is root pressure or edge restraint failure, and it shows up on Belgard Weston Stone borders where the spike-and-plate edge was set too shallow. Pavers creep outward, joints open, and the row at the curb starts to rotate. We reset the soldier course and re-anchor the edge restraint into a concrete collar, so the border has something to push against.
  • Joint sand washing out. Belgard recommends polymeric joint sand for a reason. In Plano, spring and fall storms sheet water across a driveway whose slope is off by a quarter inch per foot, and sand leaves with it. You get loose pavers and weeds in the joints within a season. We correct the cross-slope first, then re-sand with polymeric. Sanding a driveway that drains wrong is money spent twice.
  • Efflorescence that keeps coming back. That white haze on Belgard Mega-Lafitt or Catalina pavers is mineral salt rising through the surface. A one-time cleaner won’t hold if water is sitting under the paver. We find where the water’s trapped, fix the drainage, then treat the surface. If a crew tells you efflorescence is cosmetic-only, ask them where the moisture is going.
  • Cracking under load near the apron. Where the driveway meets the street, Belgard pavers on a thin base take the full turning load of a vehicle. Cracks at the apron usually trace back to insufficient base depth at the transition, not a bad paver lot. We cut out the apron, deepen the base, and rebuild it to spec. That’s the section that decides whether the rest of the driveway holds.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Belgard Driveway & Pavers Process

  1. 1
    Call and schedule. A live person answers, we get your address and the age of the surface, and we book a site visit.
  2. 2
    Diagnostics on site. We probe the base depth, check slopes with a level, and photograph what we find. You see the photos whether or not you hire us.
  3. 3
    The parts decision. If replacement pavers are needed, we match the Belgard series and color. Where the exact series is discontinued or a lead time won’t work, we show you the compatible aftermarket or alternate Belgard line and price both, so you’re choosing with numbers, not a recommendation.
  4. 4
    Written price, written scope. Flat number, written warranty, no change until you sign a change order.
  5. 5
    The work. Base correction, edge restraint, bedding, pavers, polymeric joint sand, compaction. Background-checked, uniformed crew.
  6. 6
    Test and handoff. We water-test the slope and drainage, walk the finished surface with you, and hand over the photo record of what we found and what we did.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Belgard Driveway & Pavers Costs in Plano

A crew setting pavers over a compacted base
Belgard job Typical Plano range
Paver driveway installation (Belgard) $7,000 – $18,000
Driveway replacement (paver or concrete) $5,000 – $14,000
Paver patio installation $3,500 – $11,000
Driveway sealing $250 – $700
Concrete driveway installation (adjacent / partial) $4,500 – $12,000

What moves the number: square footage and paver pattern (a herringbone field takes more cuts than a running bond), base depth if the clay has to come out, edge restraint and drainage corrections, and whether pavers have to be sourced from a discontinued run. Sealing after installation adds a line item but is worth pricing up front rather than after a salt-caked winter.

Every quote is a flat written price with a written scope. Call (844) 761-8346 for a free estimate, and bring any competitor’s written quote for a free second opinion, line by line.

Why Plano Homeowners Call Rowan Construction Group Plano for Belgard Work

Belgard fields fail for reasons a general handyman won’t catch: base compaction, cross-slope, edge restraint depth. Our technicians have up to 19 years on hardscape and read those signals before they quote a fix. Every Plano job comes with a written price before work starts and the 365-Day Done Right Promise: if it’s not done right, we make it right. Work doesn’t proceed on a change until the change order is signed, which is why projects finish within a few percent of the agreed number. Every visit includes a documented photo record, and a live person answers calls 24/7. When a Belgard job also touches cabinets, counters, roofing or windows, we cover that too through our other trades and brands including KraftMaid, Kohler, GAF and PGT.

FAQs

A remodeled primary bathroom with a soaking tub and walk-in shower

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New double-hung windows in a dining roomA new front yard fence with a matching gateAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA second-story addition that matches the existing rooflineA newly finished roof with a ridge vent and step flashing

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch