A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
KraftMaid · Plano

KraftMaid Kitchen Remodeling in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
A new concrete driveway with a paver border
A remodeled hall bathroom with subway tile and a floating vanity
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

KraftMaid Kitchen Remodeling in Plano: What to Know First

KraftMaid kitchen remodeling in Plano typically runs $14,000 to $45,000 for a full kitchen and $9,000 to $20,000 for a small or partial remodel, with most projects taking two to five weeks from demolition to final walkthrough. We quote a flat written price with a written scope before anyone picks up a tool, and no change proceeds without a signed change order. That’s Clause 1 of The Haven Standard, and it’s why our projects land within a few percent of the number the customer agreed to.

Call (844) 761-8346

This page is for Plano homeowners who already have KraftMaid cabinets in the kitchen – whether you’re keeping the boxes and refacing, replacing the doors and drawer fronts, or tearing out to the studs and starting over. If that’s you, call (844) 761-8346 and we’ll put a number in writing. As an independent KraftMaid service provider, we work on the product; we’re not affiliated with or authorized by the manufacturer.

Key Takeaways

  • KraftMaid full kitchen remodels in Plano: $14,000 – $45,000. Small or partial: $9,000 – $20,000.
  • We know which KraftMaid lines are common in Plano homes and what actually goes wrong with each.
  • Flat written price, written scope, signed change orders, 365-Day Done Right Promise.
  • Free second opinion on any written estimate – we’ll review a competitor’s quote line by line.

How KraftMaid Products Fail – and How We Fix Them

KraftMaid builds a solid cabinet. What we find in Plano kitchens isn’t a manufacturing problem so much as an installation and climate problem – and the two interact in ways that are specific to this product line. Here’s what we actually see when we open a KraftMaid kitchen in Plano and what we do about it.

  • Drawer glides that bind after four or five summers. The standard side-mount epoxy glides on older KraftMaid base cabinets collect dust and cooking grease, and North Texas humidity swells the wood slightly, so a drawer that slid fine in March drags by August. We replace with full-extension soft-close undermount glides sized to the existing box – not a generic retrofit that leaves a gap at the back. The fix is a hardware swap, not a cabinet replacement.
  • Door and drawer-front finish checking on painted maple. KraftMaid’s painted maple fronts are common in Plano’s 1990s and 2000s builds, and the joint between stile and panel is where paint first cracks. In a kitchen with a gas range and no dedicated hood venting to the exterior, the grease film accelerates it. We sand, prime, and repaint to the original sheen, or replace the fronts entirely if the checking has gone past the surface.
  • Sagging shelves in wall cabinets over the range. The adjustable shelf pins on KraftMaid wall cabinets are rated for a normal load, not for a stack of cast-iron skillets. When we see a bowed shelf, we add a mid-span support or swap to a fixed shelf with a cleat – and we check the cabinet’s attachment to the wall, because a shelf doesn’t sag in isolation.
  • Water damage under the sink from a slow supply-line weep. This is the failure that turns a refacing job into a cabinet replacement. The particleboard box swells and never comes back. We probe the substrate with a moisture meter before we quote refacing, because quoting refacing on a swollen box and discovering it mid-job is exactly the kind of surprise a signed change order exists to prevent.
  • Countertop seams that open over the dishwasher. Heat and moisture from the appliance cycle push a laminate or solid-surface seam apart over time. We reseat and re-seal the seam, or if the countertop is at the end of its life, we quote a replacement in Cambria or Caesarstone with a seam placed away from the heat source.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our KraftMaid Kitchen Remodeling Process

Every KraftMaid job in Plano follows the same sequence, whether it’s a $2,500 backsplash or a $45,000 full remodel. The order matters as much as the work.

  1. 1
    On-site assessment with a written scope. We open doors, pull drawers, meter the substrate under the sink, and photograph everything. The photo record is included on every visit, not sold as an upgrade – you leave with evidence of what we found.
  2. 2
    Parts and product decision. Where a KraftMaid OEM part is still available and the box is sound, we spec OEM. Where it isn’t, or where a quality aftermarket part is the better call for the money, we name the part, the brand, and the price difference in writing so you can decide.
  3. 3
    Flat written price and signed scope. The quote is a flat number with the scope and a written warranty. No “call for a quote.” If the scope changes later, no work proceeds on the change until the change order is signed.
  4. 4
    The work. Background-checked, uniformed technicians arrive on schedule, protect the floors and counters, and work in sequence so you’re never without a functioning kitchen for longer than the scope requires.
  5. 5
    The test and the walkthrough. Every drawer opens and closes, every door is adjusted for reveal, every seam and caulk line is checked. We walk the kitchen with you and hand over the photo record and written warranty.
  6. 6
    The guarantee. The 365-Day Done Right Promise backs the work for a full year. If it isn’t done right, we make it right.

What KraftMaid Kitchen Remodeling Costs in Plano

Installers leveling a new base cabinet during a kitchen remodel

These are the numbers we quote in Plano, not national averages. They’re flat prices with a written scope attached.

Scope Typical Price Range
Full kitchen remodel (KraftMaid cabinets, counters, backsplash, flooring) $14,000 – $45,000
Small or partial kitchen remodel $9,000 – $20,000
Cabinet installation $4,000 – $13,000
Countertop installation $2,000 – $6,500
Backsplash installation $800 – $2,500
Kitchen island installation $3,000 – $10,000

Three things move the price on a KraftMaid job: whether you’re keeping the boxes, the countertop material, and how much plumbing or electrical has to move. Refacing costs less than replacement because the boxes stay. A Cambria quartz top costs more than laminate. Moving the sink or the range doubles the labor on that wall.

Call (844) 761-8346 to schedule your free estimate. Bring a competitor’s written quote and we’ll review it line by line at no charge.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Plano Homeowners Call Rowan Construction Group Plano for KraftMaid Work

Because we show the work instead of describing it. Our technicians have up to 19 years of experience, and they know what a KraftMaid drawer box looks like when it’s been in a Plano kitchen through fifteen summers – which is a different piece of knowledge than knowing how to hang a generic cabinet. We’ve delivered 4,000-plus projects, every one quoted with a flat written price before work started, every one with a documented photo record when the crew left.

The 365-Day Done Right Promise is printed on the page and backed by a terms page. Calls are answered by a live person, and every crew member is background-checked and uniformed before they arrive. When a KraftMaid job needs a product outside the cabinet box – a Kohler faucet, a GAF or Owens Corning roof over the addition, PGT windows, a Master Halco fence – we carry the sourcing depth across fifty-plus vetted brands that keeps the written quote honest instead of inflated.

FAQs

A newly finished roof with a ridge vent and step flashing

Get Your KraftMaid Kitchen Priced in Writing

Call Rowan Construction Group Plano at (844) 761-8346 to schedule your free estimate on your KraftMaid kitchen remodel. You’ll get a flat written price, a written scope, and a written warranty before any work starts – and a free second opinion on any competitor’s quote if you’d like one reviewed line by line. No work proceeds on a change until the change order is signed, and the 365-Day Done Right Promise backs every job for a full year.

Written by the team at Rowan Construction Group Plano, serving Plano and nearby areas.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled family room with new windows and a window seatA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new stained cedar privacy fenceA new paver patio with a seat wall and fire pit

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch