







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Why Plano Homeowners Choose KraftMaid Construction
We provide independent KraftMaid construction service in Plano, TX: cabinet repair, refacing, full kitchen remodeling, and countertop work on KraftMaid Vantage, Cabico, Sanctuary, and Passage lines. What makes our KraftMaid work different is diagnosis before demolition. We identify whether you’re dealing with stripped hinge screws in a plywood stile, delaminated dovetail joints, or true structural water damage, and we recommend the cheapest fix that actually holds. Rowan Construction Group Plano is not affiliated with, sponsored by, or authorized by KraftMaid. We’re an independent service provider, which means we answer to you and nobody else. Written price before any work starts, every time. Call (844) 761-8346 to schedule a free estimate.
Why Trust Rowan Construction Group Plano for Your KraftMaid Construction?

KraftMaid builds cabinets in tiers, and the tier tells you what will fail. The Vantage series uses plywood cabinet boxes with a face-frame construction. The Cabico line runs all-plywood drawer boxes with dovetail joinery. The Sanctuary series is built for bath environments and uses moisture-resistant substrates, though not moisture-proof ones. The Passage series leans on value-engineered materials that behave differently again under load.
Our technicians have up to 19 years of experience, and that time matters here because KraftMaid’s hardware is proprietary. The soft-close hinges, the drawer glide systems, the face-frame screw patterns: these aren’t interchangeable with generic cabinet hardware off a shelf. We source OEM-compatible parts from authorized KraftMaid distributors, which keeps the installation warranty-safe. When we replace a hinge or a drawer glide with the correct OEM part, you’re not creating a warranty exclusion down the road. When a line is discontinued and OEM parts are gone, we say so up front and walk you through the color-matched alternatives.
Every visit includes a documented photo record as a standard deliverable. You see what we found: the stripped screw hole, the separated glue line, the swollen drawer bottom. Under Clause 1 of The Haven Standard, the written price arrives before anyone picks up a tool.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Common KraftMaid Construction Problems We Fix in Plano
Plano’s 1980s through 2000s brick-veneer tract homes are hitting their first real kitchen and bath replacement cycle right now. The KraftMaid cabinets installed in that era are failing in predictable ways. Here’s what we actually find.
- Vantage face-frame glue-line failure. In humid North Texas kitchens, the plywood cabinet boxes on KraftMaid Vantage can suffer glue-line separation at the face-frame joints. That’s the seam where the front frame meets the box. When it lets go, doors hang out of square and drawers rack sideways. Plano’s summer humidity swings, running 60 to 90 percent through July and August, accelerate the process.
- Cabico dovetail delamination. KraftMaid Cabico all-plywood drawer boxes can delaminate along the dovetail joints when they sit next to a dishwasher or under a sink. Steam and splash exposure works into the joint, the plywood layers separate, and the drawer bottom drops. Usually it starts with one drawer near the heat source.
- Cracked hinge screw holes. The proprietary KraftMaid soft-close hinges often lose tension or crack at the mounting screw holes in the cabinet stile. The result: doors that won’t stay shut or hang visibly crooked. Overtightened factory screws plus seasonal wood movement cause most of these.
- Sanctuary vanity finish blistering. In KraftMaid bathroom vanities, painted or stained finishes on MDF doors can blister or peel near sinks and tubs. Chronic moisture exposure is the cause, especially in small, poorly ventilated Plano bathrooms where the exhaust fan runs two minutes after a twenty-minute shower.
- Passage series drawer glide wear. Value-engineered glide systems on the Passage line wear faster under heavy loads. Fully loaded utensil drawers and pot drawers show the wear first, usually as a grinding sound or a drawer that won’t close flush.
Notice a pattern? None of these failures mean the whole kitchen has to go. Diagnosis first, then the honest answer.
KraftMaid Parts & Our Repair-vs-Replace Approach

We know KraftMaid’s construction quirks in Plano, and we can tell the difference between a true plywood-box KraftMaid build and a particleboard budget line. That distinction decides the whole repair strategy. You can’t reface particleboard, and you can’t reasonably save a plywood box that’s been soaking under a leaking sink for a decade.
Parts sourcing works one of three ways. When the cabinet box is sound, we order genuine KraftMaid replacement doors, drawer fronts, and hardware from authorized distributors. When the line is discontinued or budget is tight, we use color-matched aftermarket hardware and custom doors built by local millwork shops. We don’t claim to stock KraftMaid parts locally, because we don’t. Every part is ordered for your specific job, and we tell you the lead time before you commit.
The repair-versus-replace call follows a simple rule. If the box has structural water damage or widespread glue-line failure, replacement usually costs less over five years than repair. If one drawer or three hinges failed, repair wins. We put both numbers in writing and let the math speak. Call (844) 761-8346 for a free second opinion on any written estimate you already have.
Our KraftMaid Service Process – Step by Step
- 1
Diagnosis. We pull the affected doors and drawers and inspect the cabinet box, face frame, hinge stiles, and drawer joinery. Photos go into your record. We identify the KraftMaid series so the correct OEM part numbers can be matched.
- 2
Written price and recommendation. You get a flat written price and scope for both repair and replacement where both are viable. No signed change order, no work.
- 3
Repair or install. Hinges get replaced with OEM or OEM-style heavier-duty units. Stripped screw holes get filled and redrilled. Delaminated drawer boxes get rebuilt or replaced. New cabinets and countertops get shimmed, leveled, and fastened to the wall per KraftMaid’s install specs.
- 4
Test and document. Every door, drawer, and soft-close mechanism gets cycled. Countertop seams and backsplash joints get inspected. The photo record goes to you.
- 5
Written warranty. The 365-Day Done Right Promise covers the work. If it’s not done right, we make it right.
See the difference
Before
After
Before
After
Before
AfterKraftMaid Products We Service & Install in Plano
We service and install the KraftMaid lines Plano kitchens and baths actually contain: Vantage series cabinetry, the Cabico series plywood drawer boxes, Sanctuary series bath vanities, and Passage series value-line cabinets. That covers door and drawer front replacement, hinge and glide replacement, refacing, full cabinet installation, quartz and granite countertops, backsplash tile, and kitchen island builds. If you’re remodeling rather than repairing, we install new KraftMaid cabinetry alongside Cambria and Caesarstone countertops, so the quote reflects real material costs instead of padded ones.
We Also Service These Brands
We’re not dependent on any single manufacturer. Kohler fixtures, GAF roofing, PGT windows and doors, and Master Halco fencing all run through the same documented process and the same written-price discipline. If your project mixes KraftMaid cabinets with a Kohler sink and GAF shingles overhead, one quote covers it all.
FAQs – KraftMaid Construction Service in Plano

No. We are an independent KraftMaid service provider and have no affiliation with, sponsorship from, or authorization by KraftMaid. We work on KraftMaid products because we know them well, not because the manufacturer endorses us. That independence means our repair recommendation is based on the condition of your cabinet, not on a manufacturer incentive. Call (844) 761-8346 for a free estimate.
Yes, whenever the line is current. For KraftMaid Vantage, Cabico, Sanctuary, and Passage cabinets still in production, we order genuine KraftMaid replacement doors, drawer fronts, and hardware from authorized distributors. For discontinued lines, we use color-matched aftermarket hardware and custom doors from local millwork shops. We tell you which category your job falls into before you commit, and the written quote names the parts.
Hinge and drawer-glide repairs typically finish in one visit. Door and drawer front replacement runs longer because parts are ordered per job, and lead time depends on the KraftMaid line and finish. Full cabinet installation or a kitchen remodel runs days to weeks depending on scope. We give you a written timeline with the written price before work starts, and any schedule change comes to you as a signed change order. Call (844) 761-8346 to get your timeline.
We cover the KraftMaid Vantage series, Cabico series, Sanctuary series for baths, and Passage series. Each has a distinct construction and a distinct set of failure points: Vantage face-frame glue lines, Cabico dovetail delamination, Sanctuary MDF door finishes, and Passage glide wear. Knowing which series you own is the first step in the right diagnosis. Call (844) 761-8346 and tell us the series.
It can, if the service uses non-OEM parts or improper installation methods. That’s why we source OEM-compatible parts and follow KraftMaid’s install specifications on every job. We can’t speak for how KraftMaid will rule on a specific claim, but we keep the work warranty-safe by using the correct parts and documenting what was done. The photo record we leave with you is your evidence. Call (844) 761-8346 to review your situation.
KraftMaid cabinet and kitchen work in Plano runs across these ranges, quoted as a flat written price before any work starts:
| Service | Price Range |
|---|---|
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Full Kitchen Remodeling | $14,000 – $45,000 |
A hinge and drawer repair sits far below these ranges; we price it separately once we’ve seen the cabinet. Call (844) 761-8346 for an exact quote. Estimates are free.
Yes, and it’s often the right call. If the Vantage plywood box is structurally sound and the failure is cosmetic or hardware-related, refacing saves real money over replacement. We check the face-frame glue lines and the stile integrity before recommending it. Call (844) 761-8346 for a free assessment.
Two causes, usually together: the hinge mounting screw holes strip out in the plywood stile, and normal seasonal wood movement loosens the tension. Plano’s humidity cycle, wet springs and dry summers, works the wood constantly. The fix is heavier-duty OEM-style hinges with the screw holes filled and redrilled, not just swapping hinges into the same stripped holes. Call (844) 761-8346 to get it fixed properly.
Usually yes, if the delamination is isolated. Cabico drawer boxes can be rebuilt or replaced while the cabinet box stays. If delamination has spread through most drawers, or the box itself shows water damage, replacement is more cost-effective. We put both numbers in writing. Call (844) 761-8346 for an honest answer.
Yes, with the right series and the right installation. KraftMaid’s plywood-box lines hold up well in North Texas humidity when properly installed and ventilated. The failures we see trace back to installation shortcuts or moisture exposure, not the brand. We install new KraftMaid cabinetry with the correct shimming and fastening, and we flag ventilation problems before they cost you a vanity. Call (844) 761-8346 to plan a kitchen or bath.
For current lines, yes, because the door or front comes from KraftMaid with the factory finish. For discontinued finishes, local millwork shops can produce a close match, though an exact match isn’t always possible on older stains. We show you a sample before ordering. Call (844) 761-8346 to start the match.
A common KraftMaid service call involves a homeowner with Vantage cabinets where the doors no longer align and the soft-close feature has failed. The usual cause is a combination of hinge screw holes stripped in the plywood stile and normal seasonal wood movement. A qualified pro typically replaces the hinges with a heavier-duty OEM-style hinge, fills and redrills the screw holes, and adjusts the door alignment, often resolving the issue without replacing the entire cabinet box. That’s the pattern we see most in Plano, and it’s the one we can usually fix in a single visit.
Book Your KraftMaid Service in Plano, TX
Whether it’s a sagging Vantage door, a delaminated Cabico drawer, or a full kitchen remodel with new KraftMaid cabinets and quartz countertops, we put the price in writing first. Free estimates, free second opinions on any written estimate you already have, background-checked technicians, and a documented photo record on every visit. Call (844) 761-8346 to schedule your KraftMaid service in Plano.
Written by the team at Rowan Construction Group Plano.












