A Rowan company - serving Plano, TX
A living room with a wall of new windows and a sliding glass door
PGT · Plano

PGT Windows & Doors in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
New double-hung windows in a dining room
A new front entry door with glass sidelights
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A finished backyard cottage with a small covered porch
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

PGT Windows & Doors in Plano: What to Know First

Replacing or installing PGT windows and doors in Plano typically runs $4,500 – $15,000 for standard replacement and $8,000 – $25,000 for impact-rated units, with most single-room jobs finished in one to two days once materials are on site. We’re an independent PGT service provider, so we quote you a flat written price before any work starts and tell you plainly whether a repair or a full replacement makes more sense for your home. This page is for PGT owners in Plano who want the number on the page, the failure mode named, and the documentation to back it up. Call (844) 761-8346 to schedule your free estimate.

Call (844) 761-8346

How PGT Products Fail – and How We Fix Them

A new bay window with a cushioned seat

PGT builds strong products, but the Texas climate and the way Plano homes sit in full afternoon sun stress windows and doors in predictable ways. Here’s what we find most often on PGT jobs.

  • Weep-hole blockage on WinGuard impact units. PGT’s WinGuard line relies on small drain channels in the sill to shed water. Plano’s spring pollen and cottonwood fluff clog them fast, and the result is water sitting in the frame and a fogged or leaking unit. We clear and flush every weep channel, then re-seal the sill with a proper weep baffle rather than a bead of caulk.
  • Spacer-bar seal failure in aluminum-clad PGT series. On older PGT aluminum-clad windows, the warm-edge spacer fails before the glass does, showing as a hazy band or condensation between panes. It’s a sealed-unit failure, not a frame problem, and often the sash can be re-glazed with a new insulated unit while the original frame and warranty documentation stay intact.
  • Roller and track wear on PGT sliding and patio doors. Plano’s clay soil shifts slab and frame movement over the seasons, and that pinches sliding-door tracks. The door starts to drag, then the rollers flat-spot. We re-set the track, replace rollers with OEM-matched hardware, and confirm the panel glides through a full open-close cycle before we call it done.
  • Sill and frame rot on wood-interior PGT entry doors. Where a PGT door’s wood sill meets an exterior threshold, Plano’s humidity and heavy fall rain can wick moisture into the sill end-grain. By the time a homeowner sees paint bubbling, the sill has usually been soft for a season. We cut out the failed sill, replace it, and flash the threshold so the same spot doesn’t fail twice.
  • Weatherstripping compression on PGT casement windows. The leaf-hinge weatherstripping on PGT casement units compresses after years of sun exposure, letting air and dust in along the hinge side. We swap in OEM or matched aftermarket stripping and adjust the sash so it seats firmly against the closed stop.

Each of these is a fix we can scope and price in writing, and the photo record we leave behind shows the failed part and the replacement so you can see what changed.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our PGT Windows & Doors Process

Here’s the path from your first call to a finished job.

  1. 1
    Diagnostics. We inspect the unit, name the specific PGT series, and photograph the failure. You get a written scope describing what we found, not a verbal guess.
  2. 2
    Repair-or-replace decision. We compare the cost of a repair against a full replacement and give you both numbers, plus a free second opinion on any written estimate from another contractor.
  3. 3
    Parts choice. We source OEM hardware where it keeps your PGT warranty documentation valid, and matched aftermarket parts where OEM is on backorder, explaining the trade-off in writing.
  4. 4
    The work. Our technicians, with up to 19 years of experience, background-checked and uniformed, do the install or repair with the written scope in front of them. No change proceeds without a signed change order.
  5. 5
    The test. We open, close, latch, and water-check the unit before cleanup so you’re not the one discovering a leak in the next storm.
  6. 6
    The guarantee. Every job is covered by our 365-Day Done Right Promise, and you leave with the photo record and written warranty in hand.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What PGT Windows & Doors Costs in Plano

Installers setting a new window and checking it for level

These are the ranges we quote for typical PGT jobs in Plano:

Job Price range
Window replacement (standard, per project) $4,500 – $15,000
Impact window installation $8,000 – $25,000
Single sliding or patio door replacement $1,200 – $4,000
Sealed-unit re-glaze (per unit) $250 – $600
Track re-set and roller replacement $180 – $450

What moves the price: the PGT series you own, whether you choose impact-rated glass, frame material (vinyl vs. aluminum-clad), and whether we’re replacing one unit or a whole wall of them. Whole-home jobs bring the per-unit cost down. We deliver a flat written price with a written scope before any work starts, so the number you agree to is the number you pay. Call (844) 761-8346 to schedule your free estimate.

Why Plano Homeowners Call Rowan Construction Group Plano for PGT Work

We put the number in writing before anyone picks up a tool. Every PGT job comes with a flat written quote, a written scope, and a written warranty, and no change moves forward without a signed change order. Our technicians know PGT series well enough to tell a sealed-unit failure from a frame problem on sight, and our sourcing depth across more than fifty vetted brands (KraftMaid, Kohler, GAF, Master Halco, and others) means our quote reflects honest material costs rather than inflated ones. Every visit includes a documented photo record as standard, and a live person answers your call. If it isn’t done right, the 365-Day Done Right Promise means we make it right.

FAQs

A new curved paver walkway to the front porch

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA garage converted into a guest room and home officeNew architectural shingles with a clean valleyA new white vinyl privacy fence with a double gateA new stained cedar privacy fence

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help nationwide? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch