A Rowan company - serving Plano, TX
A new herringbone paver driveway
Driveway & Pavers · Sachse, TX

Driveway & Pavers in Sachse - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new curved paver walkway to the front porch
A new concrete driveway with a paver border
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Driveway & Pavers Across Sachse

If you’re pricing a driveway or paver project in Sachse, the number that matters most is the one written down before anyone lifts a shovel. We’re Rowan Construction Group, and we build driveways, patios, and walkways for Sachse homeowners on both sides of the Dallas-Collin county line – from the older brick ranches along the established corridors to the newer subdivisions off Sachse Road and Miles Road. Our technicians have up to 19 years of experience, every crew member is background-checked, and every visit comes with a documented photo record. Call (844) 761-8346 for a free estimate and a written price before work starts.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Sachse’s Preferred Driveway & Pavers Company

A crew setting pavers over a compacted base

Sachse is a small city with an unusual problem: it’s growing fast enough that you can stand on one lot and see a brand-new two-story next to a 1970s ranch, and the ground underneath both of them is the same expansive blackland clay. That patchwork is what most contractors get wrong here, and it’s where we spend the most time before we quote. We look at how water moves off your lot, where the adjacent slabs have already settled, and how the new flatwork will tie into the grade without trapping water against an older structure.

Under Clause 1 of The Haven Standard, the price is written before anyone starts – a flat written number with a written scope and a written warranty, not an hourly estimate that drifts. If it isn’t done right, our 365-Day Done Right Promise means we make it right. We also offer a free second opinion on any written estimate: bring a competitor’s quote and we’ll review it line by line at no charge. Work only proceeds on a change once the change order is signed, which is how projects finish within a few percent of the number the customer agreed to. That discipline matters more on acreage lots, where a quote built without a site walk can double once a pump truck gets involved.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Driveway & Pavers Services in Sachse

These are the services we handle most often in Sachse, and the ones where local site conditions change the scope the most.

Paver Driveways

A paver driveway in Sachse runs $7,000 – $18,000 for a typical two-car width, and the difference between a paver job that holds and one that rutts is almost always the base, not the pavers. We set Belgard and Tremron pavers on a compacted, properly drained base, with edge restraint specified to the lot’s slope. On an open acreage lot, we grade swales first so runoff doesn’t soak the subgrade under the pavers.

Paver Driveways

Concrete Driveways & Concrete Work

Concrete driveway installation in Sachse runs $4,500 – $12,000 depending on square footage, thickness, and whether a pump truck is needed to reach the pour area. On blackland clay, flatwork poured without a re-graded swale and proper edge restraint will show hairline cracks and heaving panels within a few seasons. We specify base depth, compaction, and joint layout before the first yard goes down.

Concrete Driveways & Concrete Work

Asphalt Driveways & Resurfacing

Asphalt driveway paving in Sachse runs $3,500 – $9,000 for a standard residential drive, with resurfacing at the lower end. Asphalt needs a stable subgrade here too – on lots where water ponds against the edge, we address drainage before we lay a new surface, because resurfacing over a failed base just buys you a year.

Asphalt Driveways & Resurfacing

Driveway Repair & Replacement

Full driveway replacement in Sachse runs $5,000 – $14,000. If your existing drive is heaving at the corners and cracking from the edges inward, the concrete usually isn’t the problem – the base under it is. We assess whether repair or full replacement is the honest call, and we put that recommendation in writing with photos of what we found.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Sachse

We work with Belgard and Tremron pavers, and we source Belgard’s full line for driveway and patio work. We don’t stock parts locally and we don’t claim to – materials are ordered to your project’s spec, which keeps the written quote honest instead of inflated to cover dead inventory. When you ask for a specific paver profile, we’ll name it and price it by name. No vague “premium paver” line items.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Driveway & Pavers Problems We See in Sachse Homes

  • Flatwork poured on an open lot with no re-graded swale. Runoff from the wider lot ponds against the slab edge, the expansive clay heaves, and the panels lift within a few seasons. The fix is drainage and grade, not a thicker slab.
  • New base graded independent of the settled slab next door. On Sachse lots squeezed between mature and new construction, the two structures fight at the property junction. We tie the new grade into the adjacent slab instead of treating it as someone else’s problem.
  • Long material hauls and narrow equipment access on large lots. Trucks and skid steers can’t always reach the pour area, which forces pump or extra-haul charges. A quote built without a site walk blows up here.
  • Pavers settling into ruts along the low side of the lot. Usually failed edge restraint and a base that wasn’t compacted to spec, not the pavers themselves.

Pricing for Driveway & Pavers in Sachse, TX

A remodeled kitchen with a waterfall island and wood cabinets

Here’s what these projects run in the Sachse market. These are real ranges, not teasers.

Service Typical Cost in Sachse
Paver Driveway Installation $7,000 – $18,000
Concrete Driveway Installation $4,500 – $12,000
Driveway Replacement $5,000 – $14,000
Driveway Sealing $250 – $700
Paver Patio Installation $3,500 – $11,000

What moves you within these ranges: total square footage, base depth and compaction required by your lot’s grade, whether a pump truck is needed for access, and how much re-grading (swales, edge restraint, tie-ins to adjacent slabs) the site needs. We put a written line-item quote in front of you before any work starts, and a free second opinion on any written estimate is always available. Call (844) 761-8346 to schedule your free estimate.

We Also Serve Cities Near Sachse

We handle Driveway & Pavers work across the surrounding area too – Murphy, Rowlett, Garland, and Wylie are all within easy reach. If you’re comparing quotes across the region, see what’s involved for Driveway & Pavers in Sachse and how the county-versus-city permit split affects your price before you sign anything.

Serving Sachse, TX – Our Local Coverage Area

We serve Sachse and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Driveway & Pavers in Sachse

A wood double vanity with two mirrors after a bathroom remodel

Why Sachse Chooses Rowan Construction Group Plano

We set the standard for driveway & pavers in Sachse.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sachse

Getting your driveway & pavers project started is simple.

1

Call or Request a Free Estimate

Tell us about your driveway & pavers project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local driveway & pavers pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sachse Customers Say

Trusted by homeowners across Sachse and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA finished backyard cottage with a small covered porchA new roof with clean valleys and new flashingA new front yard fence with a matching gate

More services in Sachse

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Driveway & Pavers in Sachse?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sachse.

(844) 761-8346

Request a Free Estimate in Sachse

Tell us about your driveway & pavers needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch