A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Kitchen Remodel Cost in Plano - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Kitchen Remodel Cost in Plano, TX: What the Number Actually Depends On

Kitchen remodel cost in Plano runs $14,000 to $45,000 for most projects, with a cosmetic refresh landing near the bottom of that range and a full gut with a layout change pushing past it. The KraftMaid cabinet quote is the easy part. In a Plano tract home, the number that actually determines your cost is what’s hiding in the soffit above the upper cabinets – original ductwork, wiring chases, and sometimes a load-bearing header that has to be engineered before the layout can change at all. Call Rowan Construction Group Plano at (844) 761-8346 for a written price before anything moves.

Installers leveling a new base cabinet during a kitchen remodel

Why Plano Kitchens Cost More Than the Cabinet Quote Suggests

Plano is a built-out, master-planned suburb where nearly all the work is renovation rather than new construction. The city has little undeveloped land left, so the housing stock is dominated by 1980s through 2000s brick-veneer tract homes in subdivisions like Deerfield, Willow Bend, and Russell Creek. Those kitchens were built to a builder-grade spec: a 36-inch dishwasher alcove, minimal island clearance, and a dropped soffit boxing in the mechanicals above the uppers.

That soffit is where budgets go sideways. Behind the drywall you’ll typically find the range hood duct, a wiring chase for the countertop circuits, and – in two-story plans especially – a structural header carrying the second floor. Removing it to gain cabinet height or open the room isn’t a cosmetic line item. It’s engineering, and it has to be priced before demolition, not discovered during it.

Under Clause 1 of The Haven Standard, we don’t quote a kitchen until we’ve looked inside the walls and the attic. That pre-project walk is how ductwork re-routing and header costs end up in the signed contract rather than as change orders once the drywall is on the floor.

What Do Plano Kitchen Remodel Tiers Actually Cost?

Three tiers cover almost every kitchen we quote in Plano, and the jump between them is mostly about whether the layout moves. Every figure below is a flat written price that includes the named product and finish, not a per-linear-foot estimate that changes once the cabinets arrive.

Scope What’s included Typical cost
Cosmetic update New cabinet doors and fronts, Cambria or Caesarstone countertop, Kohler fixtures, paint, no layout change $28,000-$55,000
Full gut with layout change Cabinet replacement, soffit removal, appliance relocation, new tile and backsplash $60,000-$120,000
Premium with island work Island extension, load-path engineering, upgraded storage and finishes $110,000-$180,000

Individual components price out on their own too, which helps when you’re comparing a written estimate line by line:

  • Cabinet installation: $4,000-$13,000
  • Countertop installation: $2,000-$6,500
  • Kitchen island installation: $3,000-$10,000
  • Backsplash installation: $800-$2,500
  • Small kitchen remodel (galley or condo-sized): $9,000-$20,000

Cosmetic work that keeps the footprint often stays inside the $14,000-$45,000 lead range for the whole project. The moment the soffit comes down, you’re in the full-gut tier whether the cabinets are kraft-paper or painted maple. This is the reason we walk the attic before we talk numbers – the quote should tell you which tier you’re in on day one. More on our process lives on the Kitchen Remodeling in Plano page.

A finished backyard cottage with a small covered porch

What Should You Compare in a Plano Kitchen Quote?

Compare scope documents, not totals. A $48,000 bid and a $61,000 bid for the same kitchen usually differ in what’s been left out, not in how much the contractor wants to earn.

  • Cabinet construction, named. KraftMaid and Wellborn are the two lines we source most in Plano. Look for a dovetail drawer box – interlocking wood joints that hold under load – rather than staple-and-glue construction that loosens at the corners within a few years. The contract should name the specific product and finish, not describe them as “standard cabinets.”
  • Soffit and structural scope. Does the quote say what happens if a header is found? Ours is priced before the demo, because we’ve already been in the attic.
  • Countertop material. Cambria and Caesarstone are quartz surfaces with different edge and seam options. Seam placement at the sink and range should be drawn on the plan.
  • Fixtures and finishes named. Kohler, Grohe, and Sterling appear in our written scope by model, not by category, so you can price-check each one.
  • HOA review, if exterior walls are touched. Window enlargement or a new exterior vent in Deerfield or Willow Bend requires HOA review, which adds two to four weeks to the permit sequence. A quote that ignores that timeline is a quote that will miss its date.

The kitchen is rarely the only room on the list. Homeowners who bought between 2015 and 2025 often pair it with a bathroom remodel while the trades are already on site, and a home addition if the kitchen can’t solve the space problem.

Does Plano’s Soil and Climate Affect a Kitchen Remodel?

Yes, more than most guides admit. Plano sits on expansive black-clay soil, and the wet-dry cycle moves slab foundations enough to open grout lines and stress countertop seams. Before a tile or quartz install, we check for movement and drainage issues that would crack a new floor within a season. The same soils are why our crews are careful about cabinet shimming and island anchoring – a floor that looks flat in July can be off by the following spring.

Every visit comes with a documented photo record: what we found in the substrate, the condition of the subfloor and framing, and what we did about it. That record is standard, not an upgrade, so you have evidence of the condition of your home before and after the work.

What Happens After the Kitchen Is Finished?

The highest-failure-rate items in any kitchen are the same three on every job: tile grout, caulk joints at the countertop seams, and cabinet hinge adjustment. All three are covered under the 365-Day Done Right Promise. If the grout cracks or a hinge sags within the year, we make it right – it isn’t billed as a service call. The promise is printed on the page and backed by a terms page, not an asterisk.

Our technicians have up to 19 years of experience, are background-checked and uniformed, and a live person answers calls around the clock. If a competitor hands you a written estimate, we’ll review it line by line at no charge under our Free Second Opinion – you keep the comparison either way.

FAQs

Get Your Kitchen Price in Writing

Every project we quote gets a flat written price and a written scope before anyone picks up a tool – a number you can screenshot and compare. Call (844) 761-8346 to book a free estimate, and we’ll inspect the soffit and the framing before we put the price on paper. That’s the whole point of how we work: measure twice, say it once.

Written by the team at Rowan Construction Group Plano, serving Plano, TX.

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new white vinyl privacy fence with a double gateA remodeled hall bathroom with patterned floor tile and painted wallsA wood double vanity with two mirrors after a bathroom remodelA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346

Request a Free Estimate

Tell us what's going on in Plano. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch