







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterKitchen Remodeling Near You in Plano, TX
Kitchen remodeling in Plano, TX typically runs $18,000 to $75,000 for a full tear-out and rebuild, with most mid-size projects landing near $34,000. Cosmetic refreshes (cabinet refacing, new countertops, backsplash) usually fall between $9,000 and $22,000, and a written flat price gets to you before a single tool comes out of the truck. We serve homeowners throughout Plano and the surrounding Collin County suburbs, from the older streets near downtown to the newer builds out toward Legacy West and beyond. Call us at (844) 761-8346 and a live person picks up, day or night.
Key Takeaways
- Full kitchen remodels in Plano: roughly $18,000 – $75,000 depending on scope, appliances, and whether walls move.
- Every quote is a flat written price with a written scope and a written warranty. Under Clause 1 of The Haven Standard, no work starts until you’ve seen the number.
- A 365-Day Done Right Promise backs every job. If it isn’t done right, we make it right.
- We connect you with background-checked, uniformed technicians. Technicians on our network have up to 19 years of experience.
- A live person answers calls 24/7, and every visit includes a documented photo record as standard.

Fast, Local Kitchen Remodeling
Speed matters more than most contractors admit. A kitchen that sits half-finished for eight weeks is a family eating takeout in the dining room for two months. When you reach out for kitchen remodeling near you, we aim to have a written estimate in your hands within a few business days, not a vague “sometime next week.” For straightforward scope reviews and site checks, we can often get eyes on your kitchen within 48 hours of your first call. Free estimates are standard on every job.
What sets the pace is the paperwork done up front. The quote is a flat price with a written scope and a written warranty. When you can see the exact line items for cabinets, countertops, labor, and permit before work starts, the project moves without a week of back-and-forth over what was actually agreed to. That’s the whole point of The Haven Standard: no work proceeds on a change until the change order is signed. It’s why projects finish within a few percent of the number the customer agreed to.
We cover the Plano core and the surrounding Collin and Dallas County suburbs. If you need someone fast, call (844) 761-8346.
Areas We Cover
We connect homeowners with independent local pros across Plano and the surrounding cities. If you’re in Kitchen Remodeling in Plano territory proper, near the Shops at Willow Bend or the older neighborhoods off Park Boulevard, we can help. Same goes for neighbors in Richardson, Allen, Murphy, Fairview, Lucas, Sachse, and McKinney. Whether you’re updating a 1990s galley kitchen in Allen or finishing a newer build out in Fairview, the process is the same: a written flat price, a written scope, a documented photo record on every visit, and background-checked, uniformed technicians who show up when they say they will.
Not sure if your address falls in our service range? Call us and we’ll tell you straight, no runaround. Head back to our home page to see the full picture of what we do.

How much does kitchen remodeling cost in Plano, TX?
Kitchen remodeling in Plano runs roughly $18,000 to $75,000, and a full gut remodel with new cabinets, countertops, appliances, and flooring usually lands between $34,000 and $58,000. The number on your written quote depends on square footage, whether load-bearing walls move, and the materials you pick. Here’s how the line items typically break out:
| Scope / Line item | Typical range in Plano |
|---|---|
| Cabinet replacement (KraftMaid, Wellborn) | $6,000 – $16,000 |
| Countertops (Cambria, Caesarstone quartz) | $3,500 – $9,000 |
| Backsplash tile and install | $1,200 – $3,200 |
| Flooring (LVP, tile, or hardwood) | $2,000 – $6,500 |
| Sink, faucet, and fixtures (Kohler, Toto) | $900 – $3,500 |
| Electrical and plumbing rough-in changes | $1,500 – $5,000 |
| Full cosmetic refresh (no wall moves) | $9,000 – $22,000 |
| Full gut remodel, mid-size kitchen | $34,000 – $58,000 |
Those are honest ranges, not upcharged guesses. Sourcing depth across 50-plus vetted brands (KraftMaid and Wellborn for cabinets, Cambria and Caesarstone for countertops, Kohler and Toto for fixtures) keeps the quote grounded in real numbers. Call (844) 761-8346 for a written price on your specific kitchen. Estimates are free, and you’ll have the number in writing before anyone picks up a tool.
Do you serve my area?
If you’re in Plano or any of the neighboring Collin and Dallas County suburbs, yes. That covers Plano, Richardson, Allen, Murphy, Fairview, Lucas, Sachse, and McKinney. We connect you with local, background-checked, uniformed technicians who work in your part of North Texas. Not certain about your street or subdivision? Call (844) 761-8346 and we’ll confirm in a minute.
How fast can you start a kitchen remodel?
Most kitchen projects in Plano can get a written estimate within a few business days of your first call, and site checks often happen within 48 hours. Actual start dates depend on cabinet lead times and permit timing. Under The Haven Standard, no change order means no work moves, so the schedule stays honest rather than padded with guesswork. Call (844) 761-8346 to get your estimate scheduled.
Can I reach you after hours?
Yes. A live person answers calls 24/7. There’s no voicemail tree and no “we’ll call you back tomorrow.” When a kitchen project stalls or you have a question before the crew arrives, you get a real person. Call (844) 761-8346 any time of day.
How we put the written price together
A flat written price doesn’t come from a square-foot guess. When we scope a Plano kitchen, we look at the condition of the substrate under the old flooring, the age and routing of the electrical panel serving the kitchen, the plumbing run to the sink and dishwasher, and whether the wall between the kitchen and living room carries a load. That last one matters in Plano’s older ranch homes more often than homeowners expect, because removing a wall can mean a header beam and a revised cost.
We also spell out the change order process in plain terms. If a wall opens up and the plumbing isn’t where the drawings said it was, we don’t quietly absorb it or quietly add it. A changed work order gets written up, priced, and signed before the crew touches it. That discipline is why we can say projects finish within a few percent of the agreed number. It’s also why we offer a free second opinion on any written estimate: bring us a competitor’s quote and we’ll review it line by line at no charge, whether or not you hire us.
Every visit comes with a documented photo record as standard, not an add-on. You’ll see what was found and what was done, with photos tied to the job. Under the 365-Day Done Right Promise, if something isn’t right within a year, we make it right.
Getting started near you
If you’re searching for kitchen remodeling near you in Plano, the fastest path is the one that puts a real number in your hands. Call Rowan Construction Group at (844) 761-8346 for a free estimate. A live person answers 24/7. You’ll get a flat written price with a written scope and written warranty before any work starts, technicians with up to 19 years of experience, and a photo record of every visit. Serving Plano, Richardson, Allen, Murphy, Fairview, Lucas, Sachse, and McKinney.
Written by the team at Rowan Construction Group Plano, serving Plano and nearby areas.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












