A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Vanities, Tile & Fixtures in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Vanities, Tile & Fixtures in Plano, TX

Vanity, tile, and fixture work is the visible finish of a bathroom remodel: the cabinet and counter you touch every morning, the floor and shower tile you stand on, and the faucets, drains, and lighting that make the room function. In Plano, a full vanity, tile, and fixture upgrade typically runs $6,200 to $18,500 depending on square footage and material tier, and a vanity-only swap with a new counter and faucet lands closer to $1,400 to $3,800. We write that number down before anyone picks up a tool.

Rowan Construction Group Plano handles this work as part of Bathroom Remodeling, and as a standalone finish package when the plumbing rough-in and framing are already sound. You get a flat written price with a written scope, a signed change order before any scope shift, and a documented photo record of the substrate, waterproofing, and set tile. Call (844) 761-8346 and a live person answers, day or night.

Our technicians have up to 19 years of experience, and they’ve set tile and installed vanities across Plano’s older and newer housing stock alike. If you’re starting from a broader project, the home page lays out all seven of our trades.

A tile setter installing wall tile in a shower

When You Need Vanities, Tile & Fixtures

Bathroom finishes fail on a schedule, and Plano’s climate pushes that schedule. The clay soil under most of Collin County shifts with our wet-spring and dry-summer cycle, and that movement shows up as hairline cracks in floor tile and grout lines that open within a season or two. Here’s what usually brings a homeowner to us:

  • Grout cracking and tile lifting in the floor. You’ll see it first along the perimeter of the room or where the floor meets the tub. In Plano’s slab-on-grade homes, minor settling is common, and a flexible membrane under the tile is what keeps the grout from telegraphing that movement.
  • A vanity that’s water-damaged at the toe kick or the sink base. Particleboard cabinets swell and delaminate once they take on moisture, and no amount of paint fixes a swollen base. We replace the cabinet, address the leak source, and set a new top.
  • Grout and caulk turning black in the shower. That’s often a sign moisture is getting behind the tile rather than sitting on top of it. The fix is a proper waterproofing membrane, not a new coat of sealer.
  • Fixture finishes pitting or peeling. Builder-grade chrome and low-end brushed nickel often degrade in 8 to 12 years, especially in households running hard water. Kohler and Toto fixtures are what we typically spec when a homeowner wants the finish to last the life of the room.
  • You’re updating before a sale or a rental turnover. Plano’s resale market rewards a clean, current bathroom, and a vanity, tile, and fixture refresh is the highest-return portion of the job.
  • The layout works but everything in it is dated. If the plumbing stays put, you don’t need a full remodel. Finish-level work gets you a current room without moving walls.

Our Vanities, Tile & Fixtures Process

Every step below happens in order, and nothing moves forward until the prior step is signed off. That’s the discipline behind the fact that our projects finish within a few percent of the agreed price.

  1. On-site assessment and written scope. We inspect the existing substrate, the waterproofing (or lack of it), the shutoff valves, and the drain condition. You get a flat written price and a written scope before any work starts. Under Clause 1 of the Haven Standard, the price is written before anyone starts.
  2. Material selection with real numbers. We walk you through vanity cabinet lines, counter materials, tile, and fixtures, pricing each option against your written scope. Cabinet brands we work with include KraftMaid and Wellborn; counters run Cambria and Caesarstone quartz; fixtures include Kohler and Toto. When a selection changes the price, you see the change order before it’s approved, and no work proceeds on a change until that change order is signed.
  3. Demolition and substrate inspection. We pull the old tile and vanity and photograph what’s underneath: the subfloor, the framing, the wall board, the state of any prior waterproofing. You receive those photos as part of the documented photo record, included as standard.
  4. Waterproofing and setting. A cementitious or sheet membrane goes down over the substrate before a single tile is set. We photograph the membrane at every seam and corner because that’s the part you can’t see once the tile is on. Tile is set, leveled, and grouted, and the photo record shows the process.
  5. Vanity and fixture install. Cabinet set and leveled, counter templated and installed, sink and faucet connected, lighting and exhaust verified. We check every shutoff and drain for leaks before we close up.
  6. Final walkthrough and warranty. We walk the room with you, hand over the photo record, and confirm the written warranty. The 365-Day Done Right Promise backs it: if it isn’t done right, we make it right.

Crews are background-checked and uniformed, and you get a live person on the phone whenever you call. If you’d like a free second opinion on an estimate you already have, bring it and we’ll review it line by line at no charge.

A new bay window with a cushioned seat

Vanities, Tile & Fixtures Pricing in Plano

Plano bathroom finish pricing depends mostly on square footage, material tier, and whether the substrate needs repair. Here are honest ranges based on work we’ve quoted and completed in the city:

Line item Typical range What drives the number
Vanity cabinet replacement (single) $650 – $1,900 Stock vs. semi-custom; KraftMaid and Wellborn pricing differs by door style and finish
Vanity countertop with sink $500 – $1,600 Quartz (Cambria, Caesarstone) vs. cultured marble; edge profile
Floor tile, set and grouted $9 – $22 per sq ft Porcelain vs. natural stone; pattern complexity; subfloor prep
Shower wall tile with waterproofing $2,400 – $7,200 Membrane system, tile size, niche and bench work
Faucet, drain, and trim fixtures $350 – $1,400 Kohler and Toto vs. builder-grade
Full vanity, tile, and fixture package $6,200 – $18,500 Room size, material tier, substrate repairs

Two things move the number more than anything else. First, the substrate: if the subfloor is soft or the old waterproofing was installed wrong, we have to fix that before we set tile, and that’s the one line item that can surprise a homeowner. We photograph what we find and show you the condition before any change is written. Second, material tier: a quartz Cambria top and Kohler fixtures price differently than cultured marble and builder chrome, and we’ll quote each so you can compare.

No-hassle upfront pricing means every quote is a flat price with a written scope and a written warranty. The 365-Day Done Right Promise is printed on the page and backed by a terms page, not an asterisk.

FAQs – Vanities, Tile & Fixtures

How much does a vanity, tile, and fixture update cost in Plano?

A full package typically runs $6,200 to $18,500. A vanity-only swap with a new counter and faucet is usually $1,400 to $3,800. The spread comes down to room square footage, whether the substrate needs repair, and material tier. Call (844) 761-8346 for an exact written quote; estimates are free.

Can you install a new vanity without moving the plumbing?

Yes, in most cases. If the existing drain and supply lines are in good condition and in a workable position, a new vanity and counter can be set without opening the walls. We verify shutoff valves and drain condition during the assessment. If the rough-in needs to move, that’s a scope item you’ll see in a signed change order before we proceed.

How long does a vanity, tile, and fixture job take in Plano?

A vanity-only replacement is typically one to two days. A full room package with floor tile, shower tile, waterproofing, and fixtures usually runs seven to twelve working days, depending on tile size and dry time for the membrane. We give you the timeline in writing before we start.

Is it cheaper to repair or replace a damaged vanity?

Replace it, in almost every case where water damage has hit the cabinet base. Particleboard that has swollen won’t return to shape, and patching it just hides a moisture problem that will show up again. A new cabinet plus a properly sealed counter is the fix that lasts. Call (844) 761-8346 and we’ll tell you what we see on site, with the price in writing.

What tile and fixtures do you recommend for Plano bathrooms?

We spec porcelain tile most often because it handles the seasonal temperature swings in North Texas well and resists staining. For fixtures, Kohler and Toto hold their finish under hard water. We source from more than fifty vetted brands, so the written quote reflects honest material numbers rather than inflated ones.

If you’re weighing a finish refresh against a full Bathroom Remodeling project, call us and we’ll walk you through both numbers side by side.

Ready to see a written price? Call Rowan Construction Group Plano at (844) 761-8346 for a free estimate. We answer live, we send a background-checked, uniformed crew, and you get a documented photo record with every visit. No urgency theatre, no “call for a quote” runaround – just the number, in writing, before anyone starts.

Written by the team at Rowan Construction Group Plano, serving Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch