







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
The Rowan Construction Group Plano Guarantee
When we say we stand behind our work in Plano, we mean three things you can hold in your hand: a flat written price you agreed to before anyone picked up a tool, a documented photo record of what we found and what we did, and the 365-Day Done Right Promise. If something we installed or built fails to perform, Rowan makes it right. No handshake, no verbal comfort, no asterisk. The guarantee is printed on every page we hand you and backed by a terms page you can read before you sign anything.
What’s Covered
- Workmanship on every trade. Whether we’re setting Belgard pavers on a Plano driveway, hanging a GAF roof, or setting KraftMaid cabinets in a kitchen, the labor that goes into the install is covered under the 365-Day Done Right Promise. If it wasn’t done right, we come back and make it right.
- The written price, honored. Under Clause 1, the price is written before anyone starts. That number doesn’t drift because a substrate was harder than expected or a shingle layer ran deeper than we counted. If a genuine change comes up mid-job, no work proceeds until you sign a change order – which is why our projects finish within a few percent of the number you agreed to.
- Parts and materials handled honestly. We source from more than fifty vetted brands – Cambria and Caesarstone for counters, Owens Corning and GAF for roofing, Kohler and Toto for fixtures, Techo-Bloc for hardscape. When a material arrives wrong or damaged, that’s on us to swap, not on you to argue about.
- Cleanup, documented. Every visit includes a photo record as a standard deliverable – not an upgrade. You leave with evidence of what the crew found, what they did, and what condition they left the site in.
- Arrival you can plan around. Crews are background-checked and uniformed, and a live person answers your call any hour. You’ll know who’s coming and roughly when, and you can reach a human if the plan shifts.
- Free second opinion on any written estimate. Bring a competitor’s quote and we’ll review it line by line at no charge. If their number is fair, we’ll tell you so.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Satisfaction Promise
If you’re not satisfied with completed work, call us and describe what’s wrong. We’ll ask for the photo record – the one from the visit – so we can see the condition for ourselves before we respond. Then we inspect in person and correct the issue under the 365-Day Done Right Promise. What we won’t do is send a generic apology and disappear. Your call reaches a live person any hour, and the promise carries a real terms page behind it, so there’s nothing vague to argue about later. If a repair we made within the year fails again, that’s a callback we own. If the failure traces to something we should have caught at inspection – a soft substrate under pavers, a leak at a window opening we sealed – we fix it. If a change is needed beyond the original scope, we write it up and price it before anyone proceeds, so you never get a surprise invoice. The promise is simple: do it right, and if we didn’t, do it again on us.
See the difference
Before
After
Before
After
Before
AfterLicensed & Insured Backing
A guarantee is only as good as the company standing behind it. Rowan Construction Group Plano operates as licensed and insured, and every crew member is verified before they arrive at your door. That matters in a market where unlicensed crews underbid and then vanish when something goes wrong a season later. Licensing means the work meets Texas standards and inspections pass. Insurance means that if a crew member is hurt on your property, or something gets damaged during the job, you’re not the one absorbing the cost. Every one of the more than 4,000 projects we’ve delivered was backed this way – licensed, insured, and documented. That’s the difference between a promise on paper and a promise a company can actually keep.
Questions Plano Homeowners Ask About the Guarantee
Does the guarantee cover the materials or just the labor?
The 365-Day Done Right Promise covers the workmanship we perform. Manufacturer warranties on products like GAF shingles or Kohler fixtures run on their own terms, and we’ll walk you through what each product carries at the quote stage so there are no surprises. Call (844) 761-8346 for a written scope that spells out both.
What if I’m not happy with part of a finished remodel?
Call us and describe the issue. We’ll pull the photo record from the visit, inspect in person, and correct it under the promise. You don’t need to fill out a form or wait on hold – a live person answers. Estimates and second opinions are free, and so is the call.
Will the price change once work starts?
No, not without your signature. Under Clause 1, the price is written before anyone starts, and no change proceeds until a change order is signed. That discipline is why projects finish within a few percent of the agreed number. Call (844) 761-8346 to get your written price.
Do you pull the permits?
Yes. Permitted work – additions, ADUs, roofing, structural changes – gets pulled and inspected. Licensing and insurance are in place, and inspections pass as part of the job, not as an afterthought. Call us to confirm what your specific Plano project requires.
How long does the guarantee last?
The 365-Day Done Right Promise covers workmanship for one year from completion of the job, and the terms are printed on every page you receive – no asterisk, no buried clause. Call (844) 761-8346 with any question about what’s covered before you sign.
What’s the Free Second Opinion?
Bring a competitor’s written estimate and we’ll review it line by line at no charge. If their price is fair, we’ll say so. It’s a standing offer, not a sales tactic. Call (844) 761-8346 to schedule yours.
Written by the team at Rowan Construction Group Plano.

