A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Quartz & Granite Countertops in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Quartz & Granite Countertops in Plano, TX

Quartz and granite countertop installation in Plano typically runs $3,000 to $9,500 for a standard kitchen, including templating, fabrication, and set-in-place installation. Quartz is engineered stone, a mix of ground quartz and resin that never needs sealing; granite is natural stone cut from a single block, which means every slab is different and needs resealing roughly once a year. We quote a flat written price with the slab edge profile, sink cutout, and backsplash spelled out before anyone touches your kitchen, and no work starts until you’ve signed off on that number.

Rowan Construction Group Plano runs this work as part of Kitchen Remodeling in Plano, which matters more than it sounds. Countertops are the piece most likely to blow a kitchen budget, because the slab you fall in love with at the showroom and the slab that actually arrives can be two different prices. Our technicians have up to 19 years of experience reading a slab before they commit to a quote, and we source through Cambria and Caesarstone for quartz, which gives the written price honest numbers instead of a low estimate that climbs after templating. Call (844) 761-8346 for a free estimate.

What you get in writing before the first cut

  • A flat price per square foot for the slab you actually picked, not a “starting at” figure
  • Edge profile named and priced (eased, bullnose, beveled, ogee)
  • Sink and cooktop cutouts itemized
  • Backsplash square footage, whether it’s a 4-inch splash or full-height
  • Written warranty and a documented photo record from template day through final set
Installers leveling a new base cabinet during a kitchen remodel

When You Need Quartz & Granite Countertops

Most Plano homeowners call us for one of a handful of reasons, and the reasons cluster by neighborhood and by the age of the house.

  • The laminate is failing. In the 1990s and early-2000s builds through Willow Bend and Deerfield, we regularly see laminate lifting at the sink edge where years of water intrusion have swollen the particleboard substrate underneath. Once that substrate swells, no amount of caulk fixes it. The counter has to come out.
  • You’re remodeling the kitchen and the counter is the last original surface. New cabinets and a new backsplash make an old beige laminate look worse, not better. If you’re already replacing cabinet fronts, the counter is the piece that ties the room together or dates it.
  • A crack or chip you can feel with a fingernail. Small chips in granite can sometimes be filled with a color-matched epoxy. Cracks that run through the slab, especially near a cutout, mean the structural integrity is gone and the piece needs replacing.
  • The peninsula or island is too small for how you actually cook. Lots of Plano kitchens built between 2000 and 2010 have an island big enough for a bowl of fruit and not much else. Extending it means new stone, templated to the new footprint.
  • You want a surface that doesn’t need annual sealing. Quartz is the answer for a household that doesn’t want the maintenance ritual granite requires. It’s non-porous by construction, so red wine and lemon juice sit on the surface instead of soaking in.
  • You’re selling and the listing photos show dated counters. We see this constantly in Legacy West and Shops at Legacy condos, where a kitchen refresh moves a unit faster than almost any other dollar spent.

One local note worth knowing: North Texas heat and the way Plano homes run their HVAC can cause natural stone to expand and contract slightly against a cabinet run over the seasons. That’s why the substrate and the seam placement matter as much as the slab itself. We check the cabinet tops for level before we template, because a slab set on an out-of-level run will crack at the seam within a couple of years. Under Clause 1 of the Haven Standard, we tell you what we found before we quote, not after.

Our Quartz & Granite Countertops Process

Countertops are a templated trade, which means the sequence is fixed and skipping a step is how jobs go wrong. Here’s how we run it.

  1. In-home measure and slab selection. We measure the existing layout, check cabinet level and cabinet-top condition, and walk you through slab options from Cambria and Caesarstone for quartz, or natural granite if you want stone that’s genuinely one of a kind. You’ll get a written price at this visit or within a day of it, with the slab, edge, and cutouts named.
  2. Template day. A technician creates a physical template of your actual countertop footprint, including sink and cooktop cutouts, wall scribes, and seam locations. This is where we catch the surprises: an out-of-square wall, a dishwasher that won’t clear a thicker slab, a cabinet run that’s a half-inch off level. Any change to the original scope gets a signed change order before we proceed, every time.
  3. Fabrication. The slab is cut, edge-profiled, and polished at the fabricator, then delivered. We photograph the slab before fabrication and share it with you so you can confirm the veining and pattern match what you picked.
  4. Removal and set. Old counters come out, substrate gets repaired or replaced where it’s soft, and the new slab is set in place and shimmed level, with seams color-matched and the sink and cooktop reconnected by a licensed trade.
  5. Final walk-through and photo record. We check every seam, cutout, and edge by hand with you present, then hand you a documented photo record of what we found and what we set, plus the written warranty. If anything isn’t right in the next 365 days, the Done Right Promise means we come back and make it right.

We also offer a free second opinion on any written estimate. If you’ve got a countertop quote from another contractor, bring it and we’ll review it line by line at no charge; it’s the fastest way to spot a price that’s missing the backsplash or the cutouts. The same discipline applies whether we’re setting stone or building an addition in Plano, so the paperwork looks familiar across every trade we run.

A garage converted into a guest room and home office

Quartz & Granite Countertops Pricing in Plano

Here are realistic Plano ranges as of 2026, quoted as a flat written price with the scope included. These are ballpark numbers to help you compare against a competitor’s quote, not a final figure; your actual price depends on the slab you pick and the size of the job.

Line item Typical range
Quartz installed (standard grade) $55 – $90 per sq ft
Granite installed (level 1 – 2) $45 – $85 per sq ft
Premium / exotic granite or book-matched quartz $95 – $150+ per sq ft
Edge profile upgrade (bullnose, beveled, ogee) $15 – $45 per linear ft
Sink cutout (undermount) $150 – $350
Cooktop cutout $100 – $200
4-inch backsplash $12 – $25 per linear ft
Full-height backsplash slab $45 – $80 per sq ft
Old countertop removal and disposal $150 – $400

A standard 30 to 40 square-foot Plano kitchen usually lands between $3,000 and $9,500 all-in for quartz with a 4-inch splash. Granite at the lower levels often comes in slightly under quartz on a comparable slab, but the annual sealing and the fact that natural stone varies slab-to-slab are the trade-offs. Edge profile, slab thickness (2cm vs. 3cm), and whether there’s an island or peninsula to template all move the number.

What affects the price most in Plano: slab selection, the number of cutouts, whether the existing substrate needs repair, and the length of the backsplash run. We name every one of those in the written quote so there’s no surprise line item three weeks in. The Free Second Opinion offer exists because a quote that leaves out the backsplash or the cutouts isn’t a lower price; it’s an incomplete one. Call (844) 761-8346 for a free estimate and a written price before any work starts.

FAQs – Quartz & Granite Countertops

Is quartz or granite better for a Plano kitchen?

Quartz is the better pick for most Plano households that want zero maintenance; it’s non-porous, doesn’t need sealing, and handles the humidity swings better than people expect. Granite is the better pick if you want natural stone with genuinely unique veining and don’t mind resealing once a year. Both hold up in a busy kitchen; the choice comes down to maintenance tolerance and how much you value the one-of-a-kind look. Call (844) 761-8346 and we’ll walk you through both slabs side by side.

How much do quartz and granite countertops cost in Plano?

A typical Plano kitchen runs $3,000 to $9,500 installed for quartz, and $2,700 to $8,500 for standard-grade granite. Premium and exotic slabs push higher, and edge profiles, cutouts, and backsplash length add to either. We quote a flat written price with every line itemized before work starts. Call (844) 761-8346 for an exact quote; estimates are free.

Is it cheaper to repair or replace a cracked granite countertop?

Repair is cheaper only for small chips and surface scratches; a crack that runs through the slab, especially near a sink or cooktop cutout, means replacement because the structural integrity is gone. A cosmetic chip can often be filled with color-matched epoxy for $150 to $400. A full replacement ranges from $2,700 to $9,500 depending on slab and size. We’ll tell you honestly which you’re dealing with after a look. Call (844) 761-8346 for a free assessment.

Can you install new countertops the same day?

No. A proper countertop install runs on a fixed sequence of measure, template, fabricate, then set, and rushing it is how seams fail. Most Plano jobs run about 7 to 14 days from template to final walk-through, depending on slab availability and fabrication lead time. What we can do same-day is the in-home measure and the written quote. Call (844) 761-8346 to get that scheduled.

Get a Written Price on Your Countertops

Bring your slab questions, your existing quote, or just a photo of the kitchen you want to replace, and we’ll turn it into a flat written price with the scope, edge, cutouts, and warranty named. Every visit comes with a documented photo record, and our technicians are background-checked and uniformed. Call (844) 761-8346 for a free estimate, or ask for the free second opinion on any written quote you already have. If your kitchen needs more than countertops, our home page lists every trade we run.

Written by the team at Rowan Construction Group Plano, serving Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch