A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Full Bathroom Remodeling in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Full Bathroom Remodeling in Plano, TX

A full bathroom remodel in Plano, TX typically costs between $13,000 and $32,000 for a hall bath and $22,000 to $60,000 for a primary suite, with the spread driven mostly by tile scope, fixture tier, and whether the drain and plumbing locations move. Full bathroom remodeling means gutting the room down to the studs and subfloor, then rebuilding it: new waterproofing, tile, vanity, fixtures, lighting, and ventilation. That’s different from a cosmetic refresh that swaps a faucet and repaints. It’s the difference between a project that fixes what’s behind the wall and one that hides it. For the broader view of what our bathroom work covers from powder rooms to walk-in showers, start with our Bathroom Remodeling in Plano page.

Call Rowan Construction Group Plano at (844) 761-8346 for a free estimate. Under Clause 1 of The Haven Standard, a written price is delivered before any work starts – not after. Our technicians have up to 19 years of experience, and a documented photo record of what we found and what we did comes with every visit.

A tile setter installing wall tile in a shower

When You Need Full Bathroom Remodeling

A full remodel is the right call when the problems are behind the finish. The situations below are the ones Plano homeowners ask about most.

  • You’re seeing soft spots, loose tile, or a spongy floor near the tub. Water has likely reached the subfloor or the waterproofing has failed. Covering it with new tile just buries the damage.
  • The layout bottlenecks a house that only has one working bath. Splitting a large vanity or converting a tub-and-shower combo into a single walk-in shower frees up floor you didn’t know you had.
  • A 1990s-era bathroom still has a forest-green garden tub, brass fixtures, and a low, dark oak vanity. These rooms were built to a different standard. Full remodels let you reset lighting, storage, and ventilation together.
  • The original shower was built without a proper waterproofing membrane. In Plano, slab construction and clay soil mean the shower pan takes a beating – when the pan leaks, the water wicks into the slab edge and won’t dry out quickly.
  • You want a curbless shower, a heated floor, or a freestanding tub, and the current rough-in can’t support it. Those changes require moving the drain line and the vent stack, which is a gut-level project.
  • You bought the house between 2015 and 2025 and the previous owner’s quick-flip bathroom is already showing cracks. A full remodel is often the only way to find out what the flip hid.

Our Full Bathroom Remodeling Process

Every full remodel follows the same sequence. The order matters as much as the materials.

  1. On-site measure and written scope. We photograph the existing room and note what’s behind the tile – the substrate, the old membrane, the drain height, the vent. You get a flat written price with a written scope and a written warranty before anyone picks up a tool.
  2. Signed scope and change-order discipline. Nothing moves forward without your sign-off. If the scope changes mid-project (and it sometimes does after we open the wall), a written change order is signed before the new work starts. That discipline is why our projects finish within a few percent of the agreed number.
  3. Demo and rough-in. We tear out to the studs and subfloor, inspect the framing and plumbing, then set the new rough-in for the shower valve, drain, and any moved fixtures. Any rot or framing repair is documented with photos.
  4. Waterproofing and tile. We install a bonded waterproofing membrane at the shower and tub surround, then set tile with correct thinset and movement joints. Cambria or Caesarstone goes in at the vanity top.
  5. Fixtures and finish. Kohler or Toto toilets and sinks, a vanity (we source KraftMaid and Wellborn cabinets when you want a cabinet-grade build), lighting, exhaust fan, and trim.
  6. Final walkthrough and photo record. We walk the room with you, verify the exhaust fan actually pulls air, and hand over the documented photo record of the whole project.
A newly finished roof with a ridge vent and step flashing

Full Bathroom Remodeling Pricing in Plano

A full bathroom remodel in Plano runs $13,000 to $60,000 depending on the room and how far the scope extends. The table below shows where the money typically goes for a hall bath versus a primary suite.

Scope Typical Plano range
Hall bath, full gut, tile floor and tub surround $13,000 – $22,000
Primary bath, walk-in shower, freestanding tub $22,000 – $38,000
Primary suite with layout change and moved plumbing $38,000 – $60,000
Bathroom addition (new room, new slab) $60,000 and up
Tile allowance, installed $9 – $22 per sq ft
Vanity cabinet (KraftMaid or Wellborn) $1,400 – $4,800
Countertop (Cambria or Caesarstone) $900 – $2,400
Toilet (Kohler or Toto) $400 – $1,100
Walk-in shower build with membrane $4,500 – $11,000

Three things push a Plano bathroom toward the top of that range. The first is moving plumbing – relocating a drain or a vent stack adds days and dollars. The second is tile: a large-format floor and a fully tiled shower wall are more installation labor than a fiberglass surround. The third is the condition of what we find behind the wall. A failed membrane or a soft subfloor is a real cost, and we document it with photos rather than surprise you on the invoice.

We put the number on the page so you can screenshot it and compare before you call. Call (844) 761-8346 for a free written estimate. If a competitor has already quoted you, we’ll do a free second opinion and review it line by line at no charge.

For a sense of how a bathroom remodel fits alongside a whole-home project, the other trades we run – from home remodels to additions – follow the same written-price-and-signed-change-order discipline.

FAQs – Full Bathroom Remodeling

How much does a full bathroom remodel cost in Plano?

A full bathroom remodel in Plano typically costs $13,000 to $22,000 for a hall bath and $22,000 to $60,000 for a primary suite, with most projects landing in the middle. The range is driven by square footage, tile scope, the fixture tier, and whether plumbing moves. Call (844) 761-8346 for a written price before any work starts – estimates are free.

Can you finish a full bathroom remodel in Plano and stay within a few percent of the price?

Yes. Every Rowan project carries a flat written price, and no change proceeds until the change order is signed. That discipline is why 4,000-plus projects have finished within a few percent of the number the customer agreed to. If we find something behind the wall that changes the scope, you see it before we touch it. Call (844) 761-8346 and we’ll walk you through how the change-order process works.

How long does a full bathroom remodel take in Plano?

A full hall bath usually takes three to four weeks and a primary suite four to seven weeks, measured from demo day to the final walkthrough. The biggest variable is tile and any plumbing relocation, plus lead time on specialty materials. We schedule around your household so you’re never without a working bathroom, and we tell you the timeline in writing. Call (844) 761-8346 for a schedule you can plan around.

Is it cheaper to repair or replace a bathroom in Plano?

A repair is cheaper when the problem is isolated, like a single failed valve or a cracked tile, and a full remodel costs more up front but fixes what a repair can only mask. If the substrate, waterproofing, or multiple fixtures are failing at once, a full remodel is usually the honest answer. Call (844) 761-8346 and we’ll tell you which one your room actually needs after a free on-site look.

Do you handle waterproofing and permit review for a Plano bathroom remodel?

Yes. We install a bonded waterproofing membrane at every shower and tub surround, and our scope review covers the local permitting requirements for your project. A full remodel that skips the membrane is the single most common cause of a bathroom that fails within a few years – we don’t skip it. Call (844) 761-8346 to talk through your project.

Whether you’re updating a hall bath in a 1990s build or reworking a primary suite you bought since 2015, the goal is the same: a written price, a signed scope, and a room that’s built to last. Rowan Construction Group Plano brings the same documented discipline to this bathroom work that we bring to kitchen remodeling, roofing, and home additions across Plano.

Call (844) 761-8346 for a free estimate. Every quote includes a written price, a written scope, and a written warranty – and the 365-Day Done Right Promise backs the finished work.

Written by the team at Rowan Construction Group Plano, serving Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch