A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Tub-to-Shower Conversion in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A new paver patio with a seat wall and fire pit
A single-story rear room addition with tall windows and a new patio
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Tub-to-Shower Conversion in Plano, TX

A tub-to-shower conversion in Plano typically costs $6,800 to $14,500 and takes five to ten working days, depending on whether the drain has to move and what the wall behind the old tub looks like. It’s the remodel homeowners call us for when a garden tub has sat unused for years and someone in the house needs a safer step-in entry. Call Rowan Construction Group Plano at (844) 761-8346 and we’ll put the price in writing before any work starts.

This page covers one specific job: removing an existing tub and building a walk-in or full shower in its footprint. The wider scope of tile, vanities, waterproofing and layout lives on our Bathroom Remodeling page, and it’s worth reading if the shower is part of a larger redo.

Key Takeaways

  • Most Plano conversions run $6,800 to $14,500 with a flat written price before work begins.
  • Moving the drain line roughly $1,200, and it’s the single biggest cost swing.
  • The 365-Day Done Right Promise covers the workmanship, not an asterisk.
  • Our technicians have up to 19 years of experience.
A tile setter installing wall tile in a shower

When You Need Tub-to-Shower Conversion

  • The tub never gets used. Plenty of Plano homes built in the 1990s and 2000s came with a garden tub in the primary bath that ends up holding towels or laundry baskets. If it hasn’t been filled in a year, it’s a slow-draining square of floor you could turn into real usable space.
  • Someone in the house has trouble stepping over a tub wall. A standard tub apron sits about 17 inches off the floor. A shower with a curbless or low-curb entry drops that to an inch or two, which changes the daily routine for a parent recovering from knee surgery or a homeowner thinking ahead about balance.
  • The caulk line keeps failing. In Plano, clay-heavy soil shifts through wet and dry cycles, and we see older fiberglass and cast-iron surrounds pull away at the seams as the framing moves. Recaulking it every spring is a sign the substrate behind the wall has an issue worth opening up.
  • The tub is fiberglass and has gone soft. Press on the floor of an older fiberglass tub and you may feel it give. That flex cracks the gel coat and traps moisture underneath, and no repair holds for long.
  • You’re selling or renting the home. A walk-in tile shower reads as updated in a listing in a way a worn garden tub does not, and local buyers comparing Plano properties notice.
  • The bathroom layout has dead space. Pulling a wide tub can free up floor for a bench, a niche, or a slightly larger shower, all inside the same footprint.

Our Tub-to-Shower Conversion Process

  1. Walkthrough and written scope. We measure the alcove, check whether the drain is centered or offset (many Plano tubs are not centered on the wall), and look at what’s behind the surround. You get a flat written price and scope before anyone picks up a tool.
  2. Demo and inspection. The tub, surround and old backer board come out. We photograph the framing, the drain line and any moisture damage, and if we find something the scope didn’t cover, you see the photos and sign a change order before work continues. No change proceeds without that signature, ever.
  3. Drain and rough-in. If the drain needs to move to center the new shower, a plumbing crew reworks the line and it gets inspected where local code requires. If it stays, we protect it and move on.
  4. Waterproofing. A cement backer board and a bonded waterproofing membrane go on before a single tile is set. This is the layer that keeps water out of the framing for good, and it’s where cheap conversions fail.
  5. Tile, fixtures and glass. We set the tile, install the shower valve and trim, and fit the glass or curtain-and-rod option you chose. Fixtures like Kohler or Toto are ordered to the written spec.
  6. Final walk and photo record. We test the drain, check the slope and make sure everything works before you’re handed a documented photo record of the whole job and the written warranty.
New architectural shingles with a clean valley

Tub-to-Shower Conversion Pricing in Plano

The number depends on four things: what the old tub is made of, whether the drain moves, the tile you pick, and whether the wall behind the surround has water damage. Below is the range we quote most often in Plano.

Line item Typical range
Tub removal and disposal $350 – $650
Drain relocation (if needed) $800 – $1,800
Waterproofing membrane and backer $900 – $1,600
Tile and setting (shower walls, pan) $2,400 – $5,500
Shower valve, trim and fixtures $600 – $1,400
Glass door or enclosure $900 – $2,800
Labor and finish carpentry $1,800 – $3,200
Total project $6,800 – $14,500

A few things push the number up in Plano specifically. Century-old homes near downtown often have cast-iron drains that are worth replacing while the floor is open. Homes in newer developments on the west side may have PEX supply lines that need to be rerouted for a new valve position. And a curbless entry means dropping the subfloor to recess the shower pan, which adds framing and labor.

Cheaper tile keeps the price in the lower range; large-format porcelain or a natural stone look moves it higher. If you have a competitor’s estimate, we’ll review it line by line at no charge with our Free Second Opinion. Flat written pricing goes on every project, so the number you sign is the number you pay unless you approve a change.

Why Rowan Construction Group Plano

We’ve delivered 4,000-plus projects since 2007, and every one of them had a written price before work started and a documented record when the crew left. Under Clause 1 of The Haven Standard, that written price is not optional. A crew shows up background-checked and uniformed, a live person answers the phone 24/7, and every visit ends with a photo record you keep. If something isn’t right within a year, the 365-Day Done Right Promise means we make it right. Our technicians have up to 19 years of experience across the trades, and shower waterproofing is the type of work where that experience matters most.

We source fixtures and finishes from over fifty vetted brands, so the material side of your quote reflects real market numbers rather than padded guesses. Cabinets like KraftMaid and Wellborn, countertops from Cambria and Caesarstone, and plumbing from Kohler and Toto are all standard spec options rather than upcharges.

FAQs – Tub-to-Shower Conversion

How much does a tub-to-shower conversion cost in Plano?

Plan on $6,800 to $14,500, with the most common Plano project landing near $9,000 to $11,000. Drain relocation, tile choice and any hidden water damage are what move the number. Call (844) 761-8346 for a written quote; estimates are free and there’s no “call for a quote” runaround.

Do I need a permit for a tub-to-shower conversion in Plano?

Usually yes, when plumbing is being altered or a new valve is installed. Plano’s building department requires a permit for plumbing changes even in a like-for-like footprint swap, and a shower pan that reworks the drain is squarely in that territory. We handle the permit and inspection coordination as part of the written scope, so you’re not chasing paperwork.

How long does a tub-to-shower conversion take?

Five to ten working days for most Plano jobs. A straightforward swap over the existing drain with simple tile runs closer to a week; a drain move, curbless entry or hidden damage pushes it toward two. The written scope tells you the target before demo begins.

Is it cheaper to repair my old tub or convert to a shower?

Conversion is often the better value. A fiberglass tub that’s gone soft can’t be reliably repaired, and recaulking a failing surround in Plano’s shifting soil buys a season at best. A tile shower with a proper membrane is a one-time fix rather than a recurring patch. We’ll tell you honestly if a repair is the smarter call for your situation.

If you’re ready to see the number on paper, call Rowan Construction Group Plano at (844) 761-8346 for a free estimate. We’ll walk the bathroom, take measurements, and hand you a flat written price and scope before any work begins.

Written by the team at Rowan Construction Group Plano, serving Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch