







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Construction in McKinney, TX
Windows and doors are the construction item McKinney homeowners call about most, and the reason is written into the housing stock: original single-pane wood sashes in the Victorian-era homes around downtown, and builder-grade aluminum slider windows in the 1990s brick-veneer subdivisions out toward US 380 that are now past their seal life. Both fail the same way in a Collin County summer, when attic-side glass temperatures push hard against 100°F and the seals give out. We put a flat written price on the replacement before anyone touches a trim board, and you can reach us at (844) 761-8346 to start that estimate.
Why McKinney Homes Are Different
McKinney’s construction market splits sharply along a line that runs roughly down the middle of the city. North of US 380, in the 75071 ZIP, you’re working in new-build territory on the Collin County blackland prairie – greenfield framing, fresh post-tension slabs, and foundation tolerances set by the engineer. A few miles south, ZIP 75069 holds the historic core around downtown, where Victorian-era and early-1900s brick and wood-frame houses sit on pier-and-beam foundations with original cast-iron plumbing. That’s two different trades practiced within a fifteen-minute drive, and the standard details don’t transfer.
The blackland clay underneath both sides swells and shrinks hard with the wet-dry cycle, so foundation movement is a standing issue: door frames rack out of square, and thresholds that closed tight in October drag by August. On the east side of downtown, in the historic district, additions and remodels run into design-review and historic-preservation rules that simply don’t apply out by 380 – period detailing has to be matched and approvals secured before a single permit is pulled. Summer heat above 100°F then dictates concrete pour timing and framing schedules for everyone. We price each of those conditions into the written scope instead of discovering them later.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Main McKinney Services
Two trades account for most of the calls we field in McKinney – the envelope work that keeps the house sealed and the roof work that keeps it dry – and each has its own page with fuller detail.
Driveway & Pavers in McKinney
Driveway work in McKinney is largely a soil problem. The expansive blackland clay under most of Collin County moves with every wet and dry cycle, and a poured slab that wasn’t cut and reinforced for that movement will crack within a few seasons. In the 75071 subdivisions we’re often replacing builder-grade concrete; in the older 75069 blocks we’re pouring over or beside drives that have already heaved. Paver driveways handle the movement better because the units flex independently over a compacted base. See Driveway & Pavers in McKinney for base depth, drainage slope, and the written price.

Fence Installation in McKinney
Fence lines in McKinney take a beating from two directions: clay soil that swells and pulls posts out of plumb, and summer heat that dries and checks untreated cedar fast. Post setting matters more here than in most of North Texas, and we set them in concrete below the active soil layer rather than surface-tamping. HOA fence standards vary block by block across the master-planned subdivisions, so we confirm the approved height, material, and stain color before the first post goes in. Fence Installation in McKinney covers materials and ranges.

Home Additions & ADU in McKinney
An addition in McKinney is a different project depending on which side of town you’re on. East of downtown, in the historic district, the design-review and preservation rules mean period detailing has to match and approvals come before permits – a longer front end. Out toward 380, additions are more about tying new framing into a post-tension slab and matching brick veneer. An ADU, an accessory dwelling unit built as a separate living structure on the lot, runs into its own setback and utility questions. Home Additions & ADU in McKinney lays out what each path requires.

Bathroom Remodeling in McKinney
In the pier-and-beam homes around downtown McKinney, a bathroom remodel often means dealing with original cast-iron drain lines and out-of-square framing that a tract-house crew never sees. In the 1990s subdivisions, it’s usually a tired builder-grade layout and a shower pan that’s reached the end of its life. Either way the waterproofing membrane behind the tile is where the job is won or lost, and we photograph that layer before it’s closed up. Bathroom Remodeling in McKinney has the scope and price ranges.
Kitchen Remodeling in McKinney
Kitchen work in McKinney runs the same split. A 75069 kitchen may need the original plumbing brought up to current code and the walls straightened before cabinets go in; a 75071 kitchen is more often a layout change – opening a wall to the living room, upgrading to KraftMaid or Wellborn cabinets and a Cambria or Caesarstone countertop. We measure the existing walls for square first, because a written cabinet price built on an out-of-square room is a number that moves. Kitchen Remodeling in McKinney details both scenarios.
Windows & Doors in McKinney

Windows and doors fail on a schedule in McKinney, and the schedule tracks the housing era. The Victorian-era and early-1900s homes in the downtown historic district carry original single-pane wood sashes that leak air around the weight pockets, while the 1990s-to-present brick-veneer houses across ZIP 75070 and 75071 were fitted with builder-grade aluminum and early vinyl units whose insulated-glass seals break down in the 100°F-plus summers. The symptom is the same in both – fogged panes, a draft you can feel at the latch, and a utility bill that climbs. Our full Windows & Doors work covers both, and we road-test brands like Dvele and Mighty Buildings where a prefabricated unit makes more sense than a frame-by-frame replacement.
Window Replacement
Signs you need it
You need replacement when the glass itself has gone – a fogged or hazy pane between the layers means the seal has failed – or when the sash no longer closes flush against a frame that has racked with foundation movement.
What it costs in McKinney
A full window replacement in McKinney typically runs $4,500 – $15,000 depending on the number and size of units, and impact-rated windows run $8,000 – $25,000.
How we do it
We measure each opening for square and shim clearance, pull the old unit and inspect the rough opening for rot, flash the sill and jambs, set and shim the new unit plumb, insulate the perimeter, and photograph the flashing before trim goes back on.
Door Installation
Signs you need it
A door needs replacing when the slab has warped past adjustment, the frame has racked so the latch won’t catch, or the original wood has swelled and rotted at the threshold from repeated wet-dry cycles.
What it costs in McKinney
Door work bundles into a broader windows-and-doors scope; a typical McKinney exterior door replacement with frame and threshold falls inside the $4,500 – $15,000 window-and-door range.
How we do it
We set the frame plumb and square in the rough opening, plane and adjust the slab for an even reveal, fit new hinges and hardware, seal the threshold against water intrusion, and confirm the latch and deadbolt align before we leave.
What Windows & Doors Costs in McKinney
| Item | Typical range in McKinney |
|---|---|
| Window Replacement | $4,500 – $15,000 |
| Impact Window Installation | $8,000 – $25,000 |
| Exterior Door Replacement | $4,500 – $15,000 |
Do impact windows make sense in McKinney?
They do if you want the extra protection and the insurance credit. McKinney sits far enough inland that hurricane ratings aren’t the driver, but impact-rated glass still resists hail and cuts outside noise. Expect $8,000 – $25,000. Call (844) 761-8346 for a flat written price.
How long does window replacement take in McKinney?
A typical McKinney house takes one to three days for the full set, weather permitting. Each opening is measured, flashed, and photographed before trim goes back, so you get a documented record of what was sealed. Call (844) 761-8346 for a free estimate.
Roofing in McKinney

Roofing in McKinney means reading two very different roof decks. The 1990s-to-present subdivisions in ZIP 75070 and 75071 sit under standard asphalt shingle that takes a hard beating from 100°F summers and hail, while the older homes near downtown carry steeper pitches and, in some cases, original detailing that limits what can go back on. The blackland clay underneath moves both, and a roof that isn’t re-nailed and flashed correctly will show it at the valleys first. Our Roofing crews scope every job against those local conditions, using GAF and Owens Corning shingle systems where they fit the deck.
Roof Repair
Signs you need it
You need a repair when there’s a localized leak, a lifted or missing shingle field after a storm, or granule loss and exposed mat in one section rather than across the whole roof.
What it costs in McKinney
Roof repair in McKinney typically runs $400 – $1,800 depending on the extent, and tile roof repair runs $600 – $2,500.
How we do it
We locate the leak, lift the surrounding shingles, inspect the deck and underlayment for rot, replace what’s failed, re-flash the penetration or valley, and photograph the repair before we close it back up.
Roof Replacement & Installation
Signs you need it
A full replacement is due when the shingle field is uniformly worn, the roof is past its service life, or storm damage covers enough of the deck that patching no longer holds.
What it costs in McKinney
Roof replacement in McKinney typically runs $8,000 – $20,000, and metal roof installation runs $15,000 – $40,000.
How we do it
We tear off to the deck, inspect and replace any rotted sheathing, install new underlayment and ice-and-water protection, set the shingle or metal system to the manufacturer’s spec, and photograph every stage.
What Roofing Costs in McKinney
| Item | Typical range in McKinney |
|---|---|
| Roof Repair | $400 – $1,800 |
| Roof Replacement | $8,000 – $20,000 |
| Metal Roof Installation | $15,000 – $40,000 |
Will you pull the permit for a McKinney roof?
Yes. We handle the permit where the scope requires one and confirm it before the crew mobilizes. You get the written scope and flat price first, and no change proceeds without your signed change order. Call (844) 761-8346 for a free estimate.
How long does a roof replacement take in McKinney?
Most single-family roof replacements in McKinney finish in one to two days once material is on site, weather permitting. We photograph the deck, underlayment, and finished field at each stage. Call (844) 761-8346 for a free estimate.
Brands We Service in McKinney
We work with a wide range of window, door, and roofing systems, including Dvele and Mighty Buildings prefabricated units and GAF and Owens Corning roofing materials. We don’t stock parts locally – material is ordered to the signed scope – so turnaround depends on the product line. See our brands for what we fit.
See the difference
Before
After
Before
After
Before
AfterPricing for Construction in McKinney, TX
| Service | Typical range in McKinney |
|---|---|
| Window Replacement | $4,500 – $15,000 |
| Impact Window Installation | $8,000 – $25,000 |
| Roof Repair | $400 – $1,800 |
| Roof Replacement | $8,000 – $20,000 |
| Metal Roof Installation | $15,000 – $40,000 |
| Tile Roof Repair | $600 – $2,500 |
| Kitchen Remodel | $14,000 – $45,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Home Addition | $45,000 – $130,000 |
| Paver Driveway Installation | $7,000 – $18,000 |
What pushes price up in McKinney is the condition under the surface – rotted sheathing under a roof, out-of-square framing in a pier-and-beam bathroom, foundation movement that has to be addressed before new work sits level. We put the flat written price in your hands before any work starts, with the scope spelled out, so the number on the page is the number you agree to.
Neighborhoods We Serve in McKinney
We work across McKinney’s older core and its newer subdivisions, and the range of housing stock is why we scope each job on site rather than quote from a photo. Response across the city is typically within the same week for an estimate, with scheduling set once the written scope is agreed.
- Downtown McKinney and the historic district (75069)
- Stonebridge Ranch
- Adriatica Village
- Trinity Falls
- The subdivisions along US 380 (75071)
Service Area – Cities Near McKinney
We also work in the towns surrounding McKinney. If you’re just outside the city line, we likely cover your address – reach out and we’ll confirm. We serve Melissa, TX, Allen, TX, Princeton, TX, and Fairview, TX, with the same flat written price and documented record on every visit.
Serving McKinney, TX – Our Local Coverage Area
We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Construction in McKinney
For an estimate, typically within the same week, with scheduling set once the written scope is agreed. Storm and leak calls get triaged first. Call (844) 761-8346 to get on the schedule and confirm your ZIP.
Yes. We pull the permits a job requires and, for work in the historic district east of downtown, secure design-review approval before demolition or framing begins. The written scope names what’s being permitted. Call (844) 761-8346 for a free estimate.
We serve 75069, 75070, and 75071, which covers downtown, the historic core, and the subdivisions out toward US 380. If your address sits just outside those lines, call (844) 761-8346 and we’ll confirm coverage.
To put a flat written price on your McKinney windows, doors, or roof – with the scope spelled out and a documented photo record included – call Rowan Construction Group at (844) 761-8346 for a free estimate. We’ll review any competitor’s written quote line by line at no charge if you already have one in hand.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local construction pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What McKinney Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












