A Rowan company - serving Plano, TX
A renovated home on a quiet residential street at golden hour
Allen, TX

Driveway & Pavers in Allen - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A new paver patio with a seat wall and fire pit
A new paver pool deck
A remodeled primary bathroom with a soaking tub and walk-in shower
A single-story rear room addition with tall windows and a new patio
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
An open kitchen and dining area after a remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Construction in Allen, TX

Allen’s housing stock was largely built in two compressed waves – late-1990s brick traditional subdivisions and a newer infill wave near downtown – which means most homes here are hitting their first full exterior renovation at the same time. Windows and doors are the work we get called to most, because the original aluminum and early vinyl units in Twin Creeks and Watters Crossing are now 20 to 30 years old, fogged or failing, and working against a North Texas summer they were never built for. Call (844) 761-8346 for a written price before anything starts.

Call (844) 761-8346

Why Allen Homes Are Different

Allen went from roughly 8,000 people in 1990 to over 100,000 today, and the housing followed fast. Twin Creeks, Bethany Ridge, and Watters Crossing are nearly all 1990s-to-2000s brick-veneer traditional and Tudor single-families on small-to-medium lots, most now crossing the 25-year mark together. That age matters: the roof, windows, and exterior trim in these homes tend to fail in unison rather than one at a time.

Underscoring all of it is blackland Prairie clay that shrinks and swells with every wet-dry cycle. A slab in Bethany Ridge that was fine at year ten can show movement by year twenty five, which is why any addition or second-story build here often starts with a foundation evaluation before framing. Add hail and high-wind events along the US-75 corridor and you get constant roofing and exterior repair work. Near old downtown at Main and Belmont, original 1960s ranch homes sit between new million-dollar rebuilds, so trades there juggle demolition, new construction, and tight lot conditions in the same block. HOA architectural review is common across the newer subdivisions and shapes window styles, roof color, and fence height before a permit is even filed.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Allen Services

Allen homeowners call us most often about two things: windows and doors that have reached the end of their service life, and roofs that have taken one too many hail seasons. Both are covered in depth below; the five trades with their own Allen pages are here too.

Driveway & Pavers in Allen

Clay soil is the story with Allen driveways. A concrete pour over unprepared blackland Prairie will crack as the ground moves, so we look at base prep and drainage before we talk surface. Paver driveways and patios – Belgard and Tremron among the brands we quote – flex with the soil instead of fighting it, which is why they hold up better on the shrinking side of a wet-dry cycle. Replacement, sealing, and new patio work all start with a written scope. See Driveway & Pavers in Allen for the full breakdown.

Driveway & Pavers in Allen

Fence Installation in Allen

Most Allen fences are shared-property lines between tight suburban lots, so fence work here is as much about the neighbor conversation as the material. HOA rules in the newer subdivisions specify height, material, and finish, and we check those before ordering a single panel. Cedar privacy fencing, aluminum, and vinyl all get quoted with the post depth and set method spelled out. See Fence Installation in Allen for details on materials and pricing.

Fence Installation in Allen

Home Additions & ADU in Allen

Adding square footage in Allen frequently means dealing with the clay first. A 20-year-old slab in Twin Creeks or Bethany Ridge may need piers before an addition can be permitted, so we budget a foundation evaluation into the plan rather than discovering it mid-framing. Second-story additions and detached ADUs are both common requests on the larger lots near downtown. Every addition gets a written price and a drawn scope before demolition. See Home Additions & ADU in Allen for how the process runs.

Home Additions & ADU in Allen

Bathroom Remodeling in Allen

Allen bathrooms from the 1990s boom share a familiar problem: original tile over greenboard, a tub nobody uses, and a vanity that has outlived its drawers. Walk-in shower conversions and tub-to-shower swaps are the most requested jobs, and waterproofing is where a cheap remodel fails – we specify the membrane and show it in the photo record. Small hall baths and primary suites get different scopes and different prices. See Bathroom Remodeling in Allen for the numbers.

Kitchen Remodeling in Allen

The Allen kitchen remodel is usually a “first-cycle” job: original oak cabinets, laminate counters, and a layout built for a 1998 family. Replacing cabinets and counters without moving plumbing keeps the price honest, and opening a wall to the family room is the change most homeowners actually want. KraftMaid and Wellborn cabinets and Cambria quartz are the brands we quote most here. Every change gets a signed change order before work moves. See Kitchen Remodeling in Allen for pricing.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Windows & Doors in Allen

A new multi-panel patio door opening a kitchen to the patio

Windows and doors are the first exterior item Allen homeowners replace, and the reason is timing: the original units in Twin Creeks, Bethany Ridge, and Watters Crossing were installed in the late 1990s and early 2000s, and most have now outlived their seals and their efficiency ratings. The other reason is the climate – Allen summers push 100°F and winter fronts drop fast, so a fogged double-pane or a door that leaks air shows up on the utility bill immediately. Our Windows & Doors work starts with a written price and a documented photo record of what we found at each opening.

Window Replacement

Signs you need it

Fog or condensation between the panes, a sash that won’t stay up, or a frame you can feel cold air through in January all point to a failing unit.

What it costs in Allen

Window replacement in Allen typically runs $4,500 – $15,000 depending on count and style, with impact-rated units at the higher end.

How we do it

We measure every opening, confirm the style against HOA architectural rules, order the units, then remove and reset each window with new flashing and a sealed perimeter.

Impact Windows & Doors

Signs you need it

Hail and high-wind events along the US-75 corridor make impact-rated glass worth considering if you’ve replaced broken panes more than once.

What it costs in Allen

Impact window installation in Allen runs $8,000 – $25,000, reflecting the heavier glass, frames, and anchoring required.

How we do it

We verify the rating against the product spec sheet, anchor the frames to the wall structure, and seal the perimeter before finishing the interior trim.

What Windows & Doors Costs in Allen

Item Typical range in Allen
Window replacement $4,500 – $15,000
Impact window installation $8,000 – $25,000
Energy-efficient window upgrade $4,500 – $15,000

Do I need a permit to replace windows in Allen?

Allen requires a permit for most window and door replacements, and HOA approval often comes first. We handle the paperwork and confirm the timeline before ordering materials so your job isn’t delayed mid-install.

How long does window replacement take in Allen?

A typical whole-home window replacement takes one to three days once materials arrive, depending on count and whether frame repair is needed. Impact-rated units can add a day for the heavier anchoring work.

Roofing in Allen

A new roof with clean valleys and new flashing

Every roof in Allen is one good hailstorm from a claim, and the US-75 corridor gets more than its share. The original shingle roofs on the 1990s subdivisions in Twin Creeks and Watters Crossing are now at or past the 20-to-25-year mark and taking that hail on aged granules, so repairs that would hold on a newer roof often don’t. We quote a written scope with the shingle layer count and decking condition spelled out before anything gets torn off. More on Roofing.

Roof Repair

Signs you need it

Missing or lifted shingles after a storm, granule buildup in the gutters, or a ceiling stain after heavy rain all call for a repair.

What it costs in Allen

Roof repair in Allen runs $400 – $1,800, with larger sections and decking replacement at the upper end.

How we do it

We photograph the damaged area, replace the shingles and any soft decking, then seal the repair and document the finished work.

Roof Replacement & Installation

Signs you need it

A roof past 20 years old with widespread granule loss, multiple prior repairs, or repeated leaks is usually a replacement rather than another patch.

What it costs in Allen

Roof replacement in Allen typically runs $8,000 – $20,000, depending on square footage, pitch, and shingle choice.

How we do it

We tear off to the deck, inspect and replace damaged sheathing, install the underlayment and shingles to spec, and walk the yard for nails before finishing.

What Roofing Costs in Allen

Item Typical range in Allen
Roof repair $400 – $1,800
Roof replacement $8,000 – $20,000
Metal roof installation $15,000 – $40,000

Does insurance cover hail damage to my Allen roof?

Most Allen homeowners policies cover hail damage, but the claim needs a documented inspection first. We photograph the damage and give you a written scope you can submit with the claim.

How many shingle layers can an Allen roof hold?

Texas code generally allows up to two shingle layers, but we recommend a full tear-off whenever possible so the decking can be inspected. Hail damage is often hidden under the top layer.

Brands We Service in Allen

For fence and paving work in Allen we quote ActiveYards, Belgard, Unilock, and Tremron materials, each selected for how it handles clay movement and summer heat. We don’t stock parts locally – everything is ordered per job, which typically adds a few days to the lead time and keeps the written quote accurate. See our brands for the full list.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Construction in Allen, TX

Service Typical range in Allen
Window replacement $4,500 – $15,000
Impact window installation $8,000 – $25,000
Roof repair $400 – $1,800
Roof replacement $8,000 – $20,000
Metal roof installation $15,000 – $40,000
Fence installation (vinyl) $3,500 – $9,000
Fence installation (aluminum) $4,000 – $10,000
Paver driveway installation $7,000 – $18,000
Home addition $45,000 – $130,000
ADU construction $90,000 – $220,000

In Allen, price climbs fastest when the clay has moved under a slab or when an older roof needs full decking replacement rather than a patch. Both are things we check before quoting, not after. Under Clause 1 of The Haven Standard, you get a written flat price and a written scope before any work starts, and no change proceeds without a signed change order.

Neighborhoods We Serve in Allen

We work across both Allen ZIP codes, 75013 and 75002, covering the full spread from the older downtown core to the newer subdivisions off Exchange Parkway and McDermott Road. Response across Allen is generally within a few days for scheduled work, and we route crews by ZIP so a Twin Creeks job and a Bethany Ridge job don’t compete for the same slot.

  • Twin Creeks
  • Bethany Ridge
  • Watters Crossing
  • Downtown Allen / Main and Belmont area
  • West Allen near US-75

Service Area – Cities Near Allen

Allen sits in the middle of Collin County, and we cover the surrounding communities as part of our normal service area. If you’re just outside Allen in Fairview, TX, Lucas, TX, Plano, TX, or Murphy, TX, the same written-price and photo-record standards apply. Call to confirm coverage for your address and to schedule a free estimate.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Construction in Allen

Ready to get started? Free estimates in Allen
Call (844) 761-8346

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

How It Works in Allen

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA remodeled family room with new windows and a window seat

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Allen. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch