A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · McKinney, TX

Bathroom Remodeling in McKinney - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A freestanding soaking tub in a remodeled primary bathroom
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across McKinney

Bathroom remodeling in McKinney runs $9,000 to $28,000 for a full gut-and-rebuild, and $5,000 to $12,000 for a smaller hall or guest bath. The number you land on depends less on the tile you pick than on what’s underneath it, and in McKinney that varies house by house. A pier-and-beam home off the downtown square and a post-tension slab house out by US 380 are two different jobs before a single box of tile is opened. We know both sides of that line, and we quote them differently because the work is different. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is McKinney’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

McKinney homeowners research contractors the way they research appliances: they read the three-star reviews and want a price range before they call. So we put the range on the page, in dollars, and we deliver a written flat price with a written scope before any work starts. That’s the whole promise under Clause 1 of The Haven Standard, and it’s why 4,000-plus projects have finished within a few percent of the number the customer agreed to. No work proceeds on a change until the change order is signed.

We bring a Free Second Opinion on any written estimate you’re holding. Bring a competitor’s quote and we’ll review it line by line at no charge, whether or not you hire us. Every crew is background-checked and uniformed, a live person answers calls 24/7, and every visit ends with a documented photo record you keep, not an optional add-on. Our technicians have up to 19 years of experience across the trades, and the 365-Day Done Right Promise is printed on every page and backed by a terms page.

Serving McKinney means reading the block before reading the plan. On a tight downtown lot, access and staging shape the bid as much as square footage does. That’s a local fact, and it’s why we ask about parking and party walls before we quote a job in 75069.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in McKinney

We handle the full range of Bathroom Remodeling scope, from a vanity swap to a down-to-studs rebuild, and we calibrate each one to the house it’s going in.

Full Bathroom Remodeling

A full remodel in a McKinney home usually means new tile, fixtures, vanity, waterproofing membrane, and ventilation. In the 75069 pier-and-beam homes, we don’t finalize the rough-in until the floor is open and the plumbing and framing have been assessed. Out in 75071’s master-planned subdivisions, the job often starts by locating the post-tension cables before any concrete gets cut.

Walk-In Showers & Shower Remodeling

A walk-in shower installation in McKinney runs $4,500 to $12,000 depending on tile, glass, and whether the drain line moves. We build the waterproofing layer correctly the first time, because a shower pan that fails is expensive to redo. The blackland clay under much of Collin County moves with the wet-dry cycle, and a pan set over a subfloor that wasn’t leveled will crack.

Tub-to-Shower Conversion

A tub-to-shower conversion in McKinney runs $3,500 to $10,000, and it’s the most common request we get from homeowners aging in place or opening up a tight hall bath. The conversion is only as good as what it’s set on. On older homes we check the drain and subfloor before the first tile gets laid, because a conversion over original cast-iron plumbing needs a look before you close it up.

Vanities, Tile & Fixtures

A bathroom vanity installation in McKinney runs $800 to $3,000, and we source cabinets and fixtures from names like Kohler and Toto so the quote reflects honest numbers. Tile selection drives the rest of the budget as much as any line item. We help you pick something that fits the period of a historic-district home or the clean lines of a newer subdivision build.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in McKinney

We work with vetted material brands across fifty-plus names, and our sourcing depth is why the written quote holds honest numbers rather than inflated ones. Cabinets come from KraftMaid and Wellborn. Countertops come from Cambria and Caesarstone. Fixtures come from Kohler and Toto. For outdoor-adjacent work, patio and hardscape brands include Belgard and Unilock. We don’t stock parts locally and we don’t claim to. What we do is coordinate with the brands and suppliers for your build so material lead times are quoted up front, not discovered mid-job.

Common Bathroom Remodeling Problems We See in McKinney Homes

  • Demo before design-review approval in the historic district. On the east side of downtown, preservation and design-review rules mean demo can’t start until the plan clears. We sequence the review first, so no one reworks a job after the rules get applied.
  • Pier-and-beam subfloors tiled over without correcting movement. In 75069 homes, tiling over a subfloor that has shifted with the clay cracks tile and shower pans within a season. We level and repair the subfloor before tile goes down.
  • No staging or parking plan set before demo. On tight downtown lots, dumpsters and material deliveries block shared alleys and draw neighbor complaints. We set the access plan before day one.
  • Rough-in finalized before the pipes and framing are exposed. In the 1800s-1920s homes near the square, a remodel frequently turns up original cast-iron drain lines. We open, assess, and coordinate plumbing inspection sign-off before closing anything back up.

Pricing for Bathroom Remodeling in McKinney, TX

The single biggest pricing driver in McKinney isn’t tile – it’s which side of the city the house sits on. A pier-and-beam home in 75069 with original plumbing typically costs more than a slab home in 75071 doing the same square footage of work, because the rough-in is more involved. The other driver is site access. A tight downtown lot with no curb parking and shared alley access adds staging cost that an open subdivision driveway doesn’t. We write every quote as a flat price with a written scope and a written warranty, and we don’t say “call for a quote.” Call (844) 761-8346 for your free estimate.

Service Typical Price Range in McKinney
Bathroom Remodel (full) $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Shower Replacement $3,000 – $8,500
Bathroom Vanity Installation $800 – $3,000
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How McKinney’s Two Housing Markets Change the Same Remodel

Here’s the local insight that shapes every bathroom remodel quote we write for Bathroom Remodeling in McKinney. In the 1800s-1920s core around downtown (75069), a bathroom remodel may need historic-preservation or design-review approval before a single permit is pulled. That approval alone can add weeks that the same job never sees in a 75071 subdivision north of US 380, where a standard city permit carries no design review. Same scope, different schedule, different cost.

The pier-and-beam homes on the historic side of downtown also carry original cast-iron drain lines, and the subfloor under them has shifted with the collin county blackland clay. So the rough-in can’t be finalized until plumbing and framing are exposed and assessed. A qualified pro opens the floor, replaces the failing drain section, repairs and levels the subfloor, and gets a plumbing inspection sign-off before tile goes down.

Out in the newer subdivisions, the house sits on a post-tension slab, and the same job often starts with locating the tension cables before cutting concrete. The work looks identical on paper. Underneath, it isn’t.

On tight downtown lots, none of this matters if the site logistics aren’t planned. Dumpsters, deliveries, and crew parking on a narrow street with shared alleys need a plan set before demo begins, or you’ll be fielding neighbor calls and pulling material from the wrong place. We build staging and access into the quote up front, so the price you agree to covers the actual conditions on the lot.

We Also Serve Cities Near McKinney

We work across the neighboring cities of Melissa, Allen, Princeton, and Fairview on the same terms: a written price before work starts, background-checked crews, and the 365-Day Done Right Promise. The housing stock shifts as you cross the county line, but the documentation standard doesn’t.

Serving McKinney, TX – Our Local Coverage Area

We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in McKinney

Schedule Your Free Bathroom Remodeling Estimate in McKinney

A new concrete driveway with a paver border

Whether you’re in a pier-and-beam home near the square or a subdivision house out by US 380, the first step is the same: a written price with a written scope before anyone picks up a tool. Our technicians have up to 19 years of experience, crews are background-checked and uniformed, a live person answers calls 24/7, and every visit ends with a documented photo record you keep. Bring a competitor’s written estimate and we’ll give you a Free Second Opinion line by line at no charge. Call Rowan Construction Group Plano at (844) 761-8346 to schedule your free estimate.

Written by the team at Rowan Construction Group Plano.

Why McKinney Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in McKinney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in McKinney

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What McKinney Customers Say

Trusted by homeowners across McKinney and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA garage converted into a guest room and home officeA finished backyard cottage with a small covered porchA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fence

More services in McKinney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in McKinney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in McKinney.

(844) 761-8346

Request a Free Estimate in McKinney

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch