







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Murphy
Bathroom remodeling in Murphy typically runs $9,000 to $28,000 for a full gut-and-rebuild, and most of that range is driven by what’s under the tile rather than what’s on it. If your home sits in an established Murphy neighborhood off West FM 544 or near the Tom Kimbrough Stadium corridor, you’re likely working with a 1980s – 2000s brick-veneer house where the original drain lines and venting were sized to a code book from a different era. That’s worth knowing before demo starts, not after. Call (844) 761-8346 to schedule a free estimate; a written, line-item price comes before anyone lifts a tool.
We work in Murphy often enough to know the permit desk, the inspection rhythm, and the kind of surprises these houses hold. Our technicians have up to 19 years of experience, every crew is background-checked and uniformed, and calls are answered by a live person around the clock.
Why Rowan Construction Group Plano Is Murphy’s Preferred Bathroom Remodeling Company

Murphy is a fully built-out Collin County suburb, which means almost every bathroom project here is a remodel inside an occupied home rather than part of a new subdivision build. That changes the job. You’re working around a family that still needs a functioning bathroom, in a house that’s been lived in, where the framing and plumbing reflect whatever was standard when the home went up. Our crews are set up for occupied-home work: dust containment, a documented photo record on every visit as a standard deliverable, and a written scope the customer signed off on before the first tile came off the wall.
The thing Murphy homeowners tend to ask about first isn’t the tile selection. It’s the number, in writing, and whether it holds. Under Clause 1 of The Haven Standard, the price is written before anyone starts – a flat price with a written scope and a written warranty, not a “call for a quote” runaround. No work proceeds on a change until the change order is signed, which is the reason our projects finish within a few percent of the agreed cost. If you’re weighing a competitor’s estimate, we’ll review it line by line at no charge through our Free Second Opinion offer. That’s the local reputation we’ve built: precise bids, documented work, and a live person on the phone when you call (844) 761-8346.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Bathroom Remodeling Services in Murphy
Our Bathroom Remodeling team handles the full range of Murphy bathroom work, from small hall-bath refreshes to complete gut rebuilds. Here’s where most of the demand sits.
Full Bathroom Remodeling
A full Murphy bathroom remodel runs $9,000 to $28,000 and covers demo, rough-in updates, waterproofing, tile, fixtures, and finish. In Murphy’s older brick-veneer homes, the smart money goes to the parts you can’t see: a camera inspection of the original cast-iron drain before the floor opens up, and confirmation the vent stack is sized for the fixtures going back in. Do that first and the rest of the budget stays honest.
Walk-In Showers & Shower Remodeling
Walk-in shower installation in Murphy typically costs $4,500 to $12,000, depending on whether the drain has to be relocated and how much waterproofing membrane the job requires. We build to a full-tile, properly sloped pan with a waterproof membrane behind it – not a plastic pan dropped onto old subfloor. Frameless glass enclosures are a common upgrade here and we specify the hardware to suit the shower’s actual dimensions, not a stock unit’s.
Tub-to-Shower Conversion
Tub-to-shower conversion runs $3,500 to $10,000 in Murphy. This is the service where Murphy homes get interesting: swapping a tub for a walk-in shower changes the fixture load, and the trap arm and vent stack behind that tub often weren’t sized for it in 1980s – 2000s construction. We verify the rough-in before we close walls. Skipping that check is the single most common way a cheap conversion turns into an expensive comeback.
Vanities, Tile & Fixtures
Bathroom vanity installation runs $800 to $3,000. We work with Kohler and Toto fixtures and Cambria and Caesarstone countertops where the budget allows, and we specify Oldcastle and Quikrete setting materials for tile work so the substrate and mortar meet spec. Tile and fixtures are where a Murphy bathroom gets its character – and where sloppy waterproofing hides until the first wet season.
Trusted Brands We Service in Murphy
We specify and source through a deep bench of vetted material brands, and the written quote reflects honest numbers rather than inflated ones. Kohler and Toto for fixtures, Cambria and Caesarstone for vanity tops, Oldcastle and Quikrete for the setting and substrate materials that keep tile in place. We don’t claim to stock parts locally – materials are sourced per project against the signed scope – and turnaround on common fixture and tile orders is quick. If you have a brand in mind, tell us at the estimate and we’ll price to it.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Murphy Homes
- Original cast-iron drains that fail a camera inspection. Homes built through the 1980s and 1990s in Murphy often still have the original cast-iron drain under the slab, and it can be scaled or corroded well before it leaks. A camera inspection before tile demo tells you whether the allowance holds or the budget blows.
- Undersized vent stacks behind the tub. A tub-to-shower conversion increases fixture load, and Murphy’s older homes often have vent stacks that were fine for a tub but not for a modern shower valve and drainage pattern. Verifying this before walls close is non-negotiable.
- No permit trail when walls close. A remodel that skips inspection sign-off leaves nothing on file if a later insurance claim questions the work. Documented compliance matters more than most homeowners realize until they need it.
- Foundation movement from blackland clay. North Texas blackland clay expands and contracts with the wet-dry cycle, and that movement shows up in bathroom floors, tile cracks, and out-of-level shower pans. We check for it during the estimate so the fix isn’t a surprise mid-job.
Pricing for Bathroom Remodeling in Murphy, TX

Here’s what Murphy bathroom work actually costs, stated in dollars so you can screenshot it and compare. These are our market-calibrated ranges, and a written line-item quote follows the free estimate every time.
| Service | Murphy Price Range |
|---|---|
| Bathroom Remodel (full) | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Bathroom Vanity Installation | $800 – $3,000 |
What moves a Murphy bathroom to the top of its range: drain replacement, vent-stack corrections, foundation-related floor leveling, and upgraded tile or glass. What keeps it low: solid existing rough-in, standard-size layouts, and stock vanity and fixture selections. Call (844) 761-8346 for an exact quote – estimates are free, and the price is written before any work starts.
We Also Serve Cities Near Murphy
We work throughout the Murphy area and into the surrounding Collin County communities – Sachse, Wylie, Fairview, and Lucas among them. If you’re in Murphy or nearby and want a written estimate for bathroom work, the process is the same: a free estimate, a line-item price in writing, and a signed change order before any scope change. Call (844) 761-8346 to get on the schedule.
Serving Murphy, TX – Our Local Coverage Area
We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Bathroom Remodeling in Murphy

Yes. A bathroom remodel in Murphy that touches drain, supply, or vent lines requires a plumbing permit and an inspection sign-off before the walls are closed. That sign-off is the documented proof that the rough-in meets current code, and it’s the record a homeowner needs on file if an insurance claim or a future sale ever questions the work. We pull the permit and coordinate the inspection as part of the written scope. Call (844) 761-8346 for an exact quote – estimates are free.
A camera inspection of the drain line, done before tile demo, is the only reliable answer. In Murphy’s 1980s – 2000s brick-veneer homes, cast-iron underslab drains often show scale buildup and corrosion that a visual check from the drain opening won’t catch. The camera tells you whether the drain is sound or needs a section replaced, so you can price it up front instead of discovering it after the subfloor is open. Call (844) 761-8346 to schedule an estimate that includes this check.
A compliant quote includes the camera inspection, the permit, the third-party inspection sign-off, and the waterproofing membrane and substrate materials specified by brand – a cheap quote typically leaves one or more of those off and prices the gap as an “allowance” you pay for later. The cheap number looks lower until the change orders land. Our written price is flat, scoped, and warranted, with no work proceeding on a change until the change order is signed. Call (844) 761-8346 for a second opinion on any written estimate – it’s free.
It can. A properly permitted conversion with a documented inspection trail shows the work was done to code, which can help when an insurer reviews the property – especially versus an unpermitted conversion with no record on file. Whether your specific premium changes depends on your carrier, so ask them directly. What we control is giving you the documentation: the permit, the inspection sign-off, and the photo record of the rough-in before walls closed. Call (844) 761-8346 for an exact quote.
It drives foundation movement, and foundation movement shows up in bathroom floors as cracked tile, out-of-level shower pans, and doors that no longer swing true. North Texas blackland clay expands in wet weather and contracts in dry, and that cycle stresses slabs. We check floor level and any evidence of movement during the estimate, so any floor-leveling or slab work gets priced in the written scope rather than showing up as a surprise mid-remodel. Call (844) 761-8346 – estimates are free.
If you’re ready for a bathroom you actually want to use, the first step is a free, no-pressure estimate. We’ll walk the space, check the rough-in and the floor, and hand you a flat written price with a written scope and warranty before anything starts. Backed by our 365-Day Done Right Promise: if it isn’t done right, we make it right. Call (844) 761-8346 to schedule your free estimate in Murphy today.
Written by the team at Rowan Construction Group.












