A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Wylie, TX

Bathroom Remodeling in Wylie - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A freestanding soaking tub in a remodeled primary bathroom
A new paver pool deck
An open kitchen and dining area after a remodel
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Wylie

We handle bathroom remodeling in Wylie with a written flat price and a written scope before anyone lifts a tool, and most jobs we quote land between $9,000 and $28,000 depending on how far the plumbing moves. If you live off Ballard or Brown near the old downtown, or out in the newer subdivisions toward the east side, you already know this town builds on clay that moves. That soil is why we check the slab before we ever talk tile. Call (844) 761-8346 and we’ll set up a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Wylie’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

We’ve built a record across 4,000-plus projects, and every one of them went out the door with a flat written price and a documented photo record of what the crew found and what they did. Wylie homeowners get that same file. You’ll see the condition of your subfloor in the photos, not just hear about it on a callback.

Our technicians have up to 19 years of experience, and they’re background-checked and uniformed. A live person answers the phone at any hour. When work in Wylie needs a rough-in moved, we pull the permit and don’t start demolition until the inspection sequence is mapped out. That discipline is Clause 1 of The Haven Standard, and it’s the reason our projects finish within a few percent of the agreed number. Bring us a competitor’s written quote and we’ll review it line by line at no charge. Call (844) 761-8346.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in Wylie

Full Bathroom Remodeling

A full gut in Wylie starts with the slab. Because most homes here are slab-on-grade on Blackland Prairie clay, any change to the drain layout means cutting concrete and re-pouring with a positive slope toward the drain. We scope that cut into the written price up front so it never shows up as a surprise change order after the first dry summer cracks your new floor. Full remodels in Wylie typically run $9,000 to $28,000.

Walk-In Shower Installation

Walk-in showers in Wylie run $4,500 to $12,000, and the range depends mostly on what the slab allows. A curbless design needs the drain re-routed and the floor built up or recessed, which is real concrete work. We set the waterproofing membrane and drain assembly to the condition of the floor we actually find, not the one we hoped for.

Tub-to-Shower Conversion

Conversions are the most common request we get in the newer subdivisions, where the original builder put a standard tub in a hall bath that nobody uses. Tub-to-shower runs $3,500 to $10,000 in Wylie. We verify the existing drain location works before we order a single piece of glass.

Vanities, Tile & Fixtures

Vanity installation by itself runs $800 to $3,000. Tile selection matters more here than in most places because the clay moves the slab, and a rigid tile set over a moving floor cracks. We choose a tile and setting method that tolerates minor movement, and we source fixtures from Kohler and Toto so the written quote carries honest numbers. Browse the full scope on our Bathroom Remodeling service page.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Wylie

We source across fifty-plus vetted brands, and for bathrooms that means Kohler and Toto fixtures, Cambria and Caesarstone countertops, and KraftMaid and Wellborn vanities. For prefab and modular bath options we can spec Dvele or Plant Prefab components where a project calls for them. We don’t stock parts in Wylie and don’t claim to. When a brand is specified, we order it against the written scope and you get the lead time in writing before you sign. Turnaround holds because the order goes in only after the rough-in and subfloor are verified.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Bathroom Remodeling Problems We See in Wylie Homes

  • Tile and shower pans set over a slab that already moved. On Wylie’s expansive clay, a floor that has shifted will crack new tile within one dry summer. We check moisture and deflection before setting anything.
  • No permit for a rough-in change. Wylie still has a small-town permitting and inspection culture, and out-of-town builders who treat it like a big city get surprised when drain and vent work is checked before the walls close.
  • Materials ordered before the rough-in is confirmed. Vanities, tile and glass bought before the slab cut reveals a drain that can’t meet code is the classic allowance blowout. We verify first, then order.
  • A toilet that rocks or a spongy floor. Both usually trace to slab movement, and often to a shower pan that was never properly sloped during the original build. That’s a foundation question before it’s a tile question.

Pricing for Bathroom Remodeling in Wylie, TX

New painted shaker cabinets with an organized deep drawer

Here’s how the numbers break down in Wylie’s market. A written, flat price comes before any work starts, and if something in the scope changes, no work proceeds on that change until the change order is signed. Our projects finish within a few percent of the agreed cost because of that rule, not in spite of it.

Service Typical Wylie Range
Full Bathroom Remodel $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Shower Replacement $3,000 – $8,500
Bathroom Vanity Installation $800 – $3,000

What moves you up or down that scale: whether the plumbing rough-in has to move, whether the slab needs cutting and re-pouring, and how much of the floor has already shifted on the clay. Call (844) 761-8346 for a free estimate and a flat written price.

We Also Serve Cities Near Wylie

If you’re just outside Wylie in Sachse, Murphy, Rowlett or Fairview, we cover those too, and the same slab and permitting questions apply across that stretch of the Collin County growth corridor. Learn more about our Bathroom Remodeling in Wylie and the surrounding communities. Call (844) 761-8346 to schedule.

Serving Wylie, TX – Our Local Coverage Area

We serve Wylie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in Wylie

A remodeled kitchen with a waterfall island and wood cabinets

Why Wylie Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Wylie.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Wylie

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Wylie Customers Say

Trusted by homeowners across Wylie and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA single-story rear room addition with tall windows and a new patioA new clay tile roof

More services in Wylie

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Wylie?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Wylie.

(844) 761-8346

Request a Free Estimate in Wylie

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch