A Rowan company - serving Plano, TX
A new herringbone paver driveway
Driveway & Pavers · McKinney, TX

Driveway & Pavers in McKinney - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new curved paver walkway to the front porch
A new concrete driveway with a paver border
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A stone counter, tile backsplash and open shelf after a kitchen remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Driveway & Pavers Across McKinney

If you live in McKinney, you already know the ground moves. The blackland clay under Collin County swells after a wet spring and shrinks hard in a dry August, and your driveway is where that movement shows up first. We connect McKinney homeowners with independent local professionals who read soil and drainage before they quote a square foot, so the fix holds. Whether you’re off Virginia Parkway in 75070 or a few blocks from the downtown square in 75069, the first step is a written price. Call (844) 761-8346 to schedule your free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is McKinney’s Preferred Driveway & Pavers Company

A crew setting pavers over a compacted base

Our crews work across all three McKinney ZIP codes – 75069, 75070, and 75071 – and the volume shows in how the work is priced and documented. Under Clause 1 of the Haven Standard, the price is written before anyone starts: a flat number, a written scope, and a written warranty, not a range that drifts once the crew is on site. No change proceeds until the change order is signed, which is why projects finish within a few percent of the number you agreed to.

The 365-Day Done Right Promise applies to every McKinney driveway we touch. If it isn’t done right, we make it right – printed on the page and backed by terms, not an asterisk. Every visit includes a documented photo record as a standard deliverable, so you end up with evidence of what was found under the slab and what was poured on top. Our technicians have up to 19 years of experience, and they’re background-checked and uniformed before they arrive at your door. Calls are answered by a live person around the clock.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Driveway & Pavers Services in McKinney

These are the four services McKinney homeowners ask for most. Each one starts with a look at what’s actually under the surface – the substrate, the grading, the drainage path – before we name a price.

Paver Driveways

A paver driveway gives you something concrete can’t: when a single section settles, you lift that section and reset the base instead of demolishing the whole slab. In McKinney we set pavers on a compacted gravel base sized for the clay’s movement, with edge restraints that hold the field in place through the wet-dry cycle. We work with Belgard and Techo-Bloc pavers, and the written quote names the brand and the pattern before work begins.

Paver Driveways

Concrete Driveways & Concrete Work

Concrete in McKinney lives or dies by base preparation and joint placement. We spec control joints and proper grading so the slab has somewhere to crack when the soil shifts, rather than cracking wherever it wants. Materials come from brands like Quikrete and Sakrete, mixed to the spec the job calls for, not whatever’s closest. A typical concrete driveway installation runs $4,500 – $12,000, and you’ll see that range as a line item in your written scope.

Concrete Driveways & Concrete Work

Asphalt Driveways & Resurfacing

Asphalt is the lower-cost option for a McKinney driveway, and resurfacing can add years to a surface that’s cracked but still structurally sound. The catch is drainage – asphalt is more forgiving of small movement than concrete but less forgiving of water sitting against it. We grade away from the slab and check that downspouts and swales actually move water off the drive. Paving runs $3,500 – $9,000 in this market.

Asphalt Driveways & Resurfacing

Driveway Repair & Replacement

Not every cracked McKinney driveway needs to come out. Mudjacking or slab leveling can rescue a settled section; full replacement makes more sense when the base itself is gone. We’ll tell you which one the evidence supports, and the photo record shows you why. Replacement in McKinney typically runs $5,000 – $14,000, and the number is fixed in writing before the first cut.

For the full range of work – patios, walkways, pool decks, stamped concrete, brick pavers, and sealing – see our Driveway & Pavers team, and for the local picture, Driveway & Pavers in McKinney.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in McKinney

We don’t stock parts or materials locally – the independent professionals who do the work source what each job needs. What that means for you is choice: brand-specific requests are welcome, and the written quote names exactly what’s going in before anything is ordered. Pavers from Belgard and Techo-Bloc, bagged concrete from Quikrete and Sakrete, Oldcastle hardscape products where the spec calls for them – if you want a specific brand on your McKinney driveway, say so at the estimate and it goes into the scope. No runner has to call around after the fact.

Common Driveway & Pavers Problems We See in McKinney Homes

The failures in McKinney tend to repeat. Here’s what we run into most, and why it happens here rather than everywhere else.

  • Concrete cracking from clay soil movement. Collin County’s blackland clay expands when wet and contracts when dry, and a slab poured on an inadequate base cracks along the path of least resistance. The ground didn’t fail – the base preparation did.
  • Historic district design review delays. East of downtown, driveway materials have to match the period look, and approval comes before a permit is pulled. A material that’s fine out by US 380 can get rejected a few miles away in the historic core.
  • Drainage pooling that eats pavers and concrete alike. Flat grading or a swale that runs the wrong way traps water against the drive, and standing water shortens the life of any surface. On pier-and-beam homes in 75069, we also check whether foundation movement is affecting how the driveway sits.
  • Settling where the base was thin. A paver field or slab laid over under-compacted gravel settles unevenly. More gravel, proper grading, and joint placement are the answer – not a cosmetic patch.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Driveway & Pavers in McKinney, TX

A new multi-panel patio door opening a kitchen to the patio

McKinney’s split between the historic core and the new subdivisions out by US 380 shows up in the price, not just the look. Historic-district work can carry review and approval time; greenfield work north of 380 runs on straightforward scheduling. Either way, you get a flat written price with a written scope, and the line items look like this:

Service Typical McKinney Range
Paver Driveway Installation $7,000 – $18,000
Concrete Driveway Installation $4,500 – $12,000
Driveway Replacement $5,000 – $14,000
Driveway Sealing $250 – $700

What moves the number: square footage, base depth required by the soil, material choice, and whether historic review applies. Bring a competitor’s written quote and we’ll review it line by line at no charge. Call (844) 761-8346 to schedule your free estimate.

We Also Serve Cities Near McKinney

We also take work in the towns around McKinney – Melissa up the road, Allen to the southwest, Princeton out east, and Fairview just south. The clay is the same and the pricing logic is the same, so if your driveway sits on any side of the McKinney line, the estimate process doesn’t change. Call if you’re unsure whether your address falls in our service area.

Serving McKinney, TX – Our Local Coverage Area

We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Driveway & Pavers in McKinney

A new stained cedar privacy fence

Get Your McKinney Driveway Priced in Writing

Whether your driveway is cracked from the clay or you’re ready to set pavers on a proper base, the first step is the same: a written price before any work starts. We’ll bring the background-checked crew, document what we find with a photo record, and stand behind it with the 365-Day Done Right Promise. Call (844) 761-8346 today to schedule your free estimate in McKinney.

Written by the team at Rowan Construction Group.

Why McKinney Chooses Rowan Construction Group Plano

We set the standard for driveway & pavers in McKinney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in McKinney

Getting your driveway & pavers project started is simple.

1

Call or Request a Free Estimate

Tell us about your driveway & pavers project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local driveway & pavers pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What McKinney Customers Say

Trusted by homeowners across McKinney and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patioA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in McKinney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Driveway & Pavers in McKinney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in McKinney.

(844) 761-8346

Request a Free Estimate in McKinney

Tell us about your driveway & pavers needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch