







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Driveway & Pavers Across Allen
If you live in Allen, you already know the driveway is the first thing that fails. The slab cracks at the apron, the pavers rut after a wet spring, and suddenly your curb appeal is working against you. We build and rebuild driveways, walkways, patios, and pool decks across Allen with a written price before anyone touches the ground, and a documented photo record when the crew leaves. Call (844) 761-8346 for a free estimate.
Why Rowan Construction Group Plano Is Allen’s Preferred Driveway & Pavers Company

Allen is a specific kind of town, and it produces a specific kind of driveway problem. Most of the housing was built in two compressed waves: the late-1990s and early-2000s brick traditional subdivisions like Twin Creeks, Bethany Ridge, and Watters Crossing, then a newer infill and teardown-rebuild wave around the old downtown at Main and Belmont. That means Allen isn’t a restoration market. It’s a first-cycle renovation market, and driveways here are hitting the reuse-by date all at once.
We’ve built our reputation in Allen on one thing homeowners can actually verify: a flat written price before work starts, a written scope, and a written warranty. Every job gets a signed change order if the scope moves. No work proceeds on a change until that signature is on the page. Our technicians have up to 19 years of experience on paver and concrete systems, and they arrive background-checked and uniformed. When you call, a live person answers, and when the job is done you get the photo record of what was found and what was done. Under our 365-Day Done Right Promise, if something isn’t right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Driveway & Pavers Services in Allen
Paver Driveways
Paver driveways are the upgrade most Allen homeowners ask about first, and they’re also where base work separates a good job from a failed one. Because Allen sits on North Texas blackland clay, the paver itself is surface; the compacted aggregate base, the grading, and the edge restraint are what hold the plane. In Twin Creeks and Bethany Ridge we regularly see 20-to-30-year-old lots where the pavers rut and migrate along the apron because the original base was never built for today’s loads. A proper build here means a test pit to read the subgrade, corrected drainage, and a base spec in writing before material is ordered.

Concrete Driveways & Concrete Work
Concrete is still the standard on Allen’s 1990s and 2010s brick traditional lots, but the clay is unforgiving. Slabs poured without expansion relief or proper reinforcement crack and heave as the wet-dry cycle moves the ground. We scope the concrete mix, the joint layout, and the subgrade compaction in writing, then tie the new slab into the garage edge so the seam doesn’t open. If you’re in the 75013 or 75002 ZIP and the existing slab has already failed, we’ll tell you honestly whether it’s a repair or a replacement.

Asphalt Driveways & Resurfacing
Asphalt is common on Allen’s older ranch lots near downtown and on longer rural-style driveways toward Lucas. Resurfacing adds years when the base is sound; when the base has failed, sealing or overlaying it just hides the problem for a season. We check the base first, resurface or repave the right way, and put the scope of work in writing so you know exactly what you’re paying for.

Driveway Repair & Replacement
Allen repair calls usually start with the same complaint: the driveway cracks at the apron or ruts after a wet spring. In most cases that’s a base-and-drainage problem, not a surface problem. A qualified local contractor pulls a core or test pit to read the base, corrects grading and compaction, and ties the new apron into the existing slab or garage edge. We give you the written scope, the base spec, and a flat price before ordering anything.
Trusted Brands We Service in Allen
Driveway work lives or dies on the materials under the surface. We source hardscape and concrete materials from vetted brands, including Oldcastle hardscape and Quikrete and Sakrete bagged concrete products, and we name the material and spec in the written quote so you can compare bids line by line. We don’t carry stock or keep a yard. We connect Allen homeowners with independent local professionals who order the right material for the job and get it to your driveway on the schedule the scope calls for.
See the difference
Before
After
Before
After
Before
AfterCommon Driveway & Pavers Problems We See in Allen Homes
- Clay-soil heave under a 1990s Twin Creeks or Bethany Ridge driveway. The expansive blackland clay shrinks and swells with every wet-dry cycle, cracking the slab or rutting the pavers long before the surface itself wears out. The fix is almost always in the base and grading, not the topping.
- Paver driveways installed without a compacted aggregate base and edge restraint. Pavers migrate and settle along the apron, especially with DFW’s wet-dry cycling. Once the edge restraint fails, the whole field starts to move.
- Failed aprons and joints on original 1990s slabs. Many of Allen’s original driveways were poured without expansion relief for today’s heavier vehicle loads. The joint at the apron and the garage edge is usually the first place it shows.
- Long-lead stone and paver selections ordered before the scope is fixed. When the homeowner upgrades the paver line mid-job without a signed change order, the price moves and the schedule slips. That’s why we lock the selection and the allowance in writing first.
Pricing for Driveway & Pavers in Allen, TX

Allen driveway pricing tracks the base and drainage work more than the visible surface, so treat any quote that skips the base spec as incomplete. Here’s what a typical job runs in Allen’s market:
| Service | Typical Allen Price Range |
|---|---|
| Paver Driveway Installation | $7,000 – $18,000 |
| Concrete Driveway Installation | $4,500 – $12,000 |
| Driveway Replacement | $5,000 – $14,000 |
| Driveway Sealing | $250 – $700 |
| Paver Patio Installation | $3,500 – $11,000 |
What moves the number: the footage and slope, the condition of the base, whether a test pit reveals failed subgrade, and the paver or concrete selection. We hand you a flat written price and a written scope before work starts, and a signed change order is required before any change proceeds. Estimates in Allen are free.
We Also Serve Cities Near Allen
We serve homeowners across the surrounding area, including Fairview, Lucas, Plano, and Murphy. If you’re in one of these communities and want the same written-price approach, our Driveway & Pavers team can scope it for you. You can also see everything we do for Allen homeowners on the city page.
Serving Allen, TX – Our Local Coverage Area
We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Driveway & Pavers in Allen

Because the base under the two driveways is different ground. Allen’s late-1990s and early-2000s subdivisions were built on expansive blackland clay, and many original slabs were poured without expansion relief for today’s heavier loads. A newer subdivision may sit on better-prepared or different fill, so its slab moves less. The crack is almost always a base-and-drainage issue, not a surface wear issue. Call (844) 761-8346 for a free estimate and a written scope.
Driveway and hardscape work in Allen often requires a permit depending on scope, and it’s the contractor’s job to confirm the current requirement with the city before work starts. A qualified local professional should handle that check and pull any required permit before ordering material, not after. Ask for it in writing. Call (844) 761-8346 and we’ll walk through what your specific job needs.
Because on the higher-end paver lines, the material schedule, not the labor, sets the calendar. Long-lead stone and paver selections can add weeks before the crew ever breaks ground. That’s exactly why we lock the paver selection and the allowance in the written scope before ordering, so an upgrade doesn’t turn into a change order mid-job. Call (844) 761-8346 for a free estimate that includes the lead time up front.
A properly compacted, drained aggregate base with edge restraint is what keeps a paver driveway from settling on Allen clay. The pavers are the surface; the base, the grading, and the edge restraint do the structural work. In Twin Creeks and Bethany Ridge lots, we read the subgrade with a test pit first, correct the grading and drainage, then build the base to spec in writing. Call (844) 761-8346 and we’ll scope it for your driveway.
Compare the written scope, the base spec, and the material selection side by side, not just the total. A bid that skips the base spec or leaves the paver line “to be selected” is where change orders start. We give you a flat written price before work starts and require a signed change order before any change proceeds. We also offer a Free Second Opinion on any written estimate: bring a competitor’s quote and we’ll review it line by line at no charge. Call (844) 761-8346 to schedule.
Whether you’re in Twin Creeks facing a cracked slab or near downtown Allen planning a paver driveway or patio, the right first step is a written price with the base spec spelled out. Our technicians have up to 19 years of experience, they arrive background-checked and uniformed, and every visit includes a documented photo record. Call (844) 761-8346 to schedule your free estimate with Rowan Construction Group Plano. Under our 365-Day Done Right Promise, if it isn’t done right, we make it right.
Written by the team at Rowan Construction Group Plano.












