A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · McKinney, TX

Home Additions & ADU in McKinney - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across McKinney

If you’re adding on in McKinney, the smartest first move is a written price and a realistic schedule, not a drawing. Most additions here land between $45,000 and $130,000, and ADUs run $90,000 to $220,000 depending on whether you’re converting a garage or building from the ground up. We know the split across McKinney firsthand: the tight historic blocks east of downtown in 75069, and the wide subdivisions out past US 380 in 75071. Call (844) 761-8346 for a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is McKinney’s Preferred Home Additions & ADU Company

A remodeled family room with new windows and a window seat

Every project we quote in McKinney comes with a flat written price and a written scope before a tool is picked up. That’s Clause 1 of The Haven Standard: no work proceeds on a change until the change order is signed, which is why our projects finish within a few percent of the number the customer agreed to. If something isn’t done right, the 365-Day Done Right Promise means we make it right, and the terms sit on the page, not in an asterisk.

Our technicians have up to 19 years of experience and are background-checked and uniformed, and a live person answers calls 24/7. Every visit leaves a documented photo record, so you see what we found and what we did. We also offer a Free Second Opinion on any written estimate; bring a competitor’s quote and we’ll review it line by line at no charge. For a McKinney addition, that second read often surfaces staging or access costs a thinner quote left out.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in McKinney

We handle the full range of McKinney work through our Home Additions & ADU team, from a permitting-heavy historic-core project to a clean garage conversion out by US 380.

ADU Design & Permitting

An ADU is a self-contained second dwelling on your lot, and in McKinney the paperwork is where the timeline is won or lost. In the historic district east of downtown, design-review and historic-preservation approval come before a single permit is pulled, so we sequence the approvals first. Out in the 75071 subdivisions the review is lighter, but setback, lot-coverage and utility requirements still apply. Getting the permit path right up front is the difference between a smooth build and a stalled one.

ADU Design & Permitting

Room Additions

Room additions are the most common request we see in McKinney, whether it’s a primary suite off the back or an extended living room. On tight lots the real work is staging: we plan where materials and trades go before demo starts, then lay out a clean site with a rented pod if there’s no side yard to work from. That planning belongs in the quote, not in a surprise later.

Room Additions

Second Story Additions

A second story on a pier-and-beam house means the new framing has to meet an old foundation that has already moved on Collin County’s blackland clay. We survey and engineer the tie-in rather than assume a flat grade, because differential movement later shows up as cracked drywall and a failed inspection. The same care goes into post-tension slab homes in 75071, where the tensioned cables must be located before anyone saws concrete.

Second Story Additions

Junior ADU & Interior Conversion

When the budget favors reuse over new construction, a Junior ADU or interior conversion can turn an underused wing or attached garage into a separate living space. We keep the scope honest: what the existing walls and mechanicals can support, what the code requires, and the written price for each step. Garage conversions in McKinney typically run $30,000 to $80,000.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in McKinney

Concrete and foundation work is where a McKinney addition is won or lost on clay soil, so we spec ready-mix from suppliers like Oldcastle and bagged mixes from Quikrete and Sakrete when the pour calls for it. For prefab or panelized ADU options, Abodu is one name that comes up. We don’t stock parts locally; we order for your project and time deliveries around the pour schedule and the heat, because summer above 100°F in McKinney dictates when concrete goes down. You’ll see the exact product spec in your written scope.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Home Additions & ADU Problems We See in McKinney Homes

  • Approval-before-design in the historic district. Starting design or demo before historic-preservation review on a 75069 block often forces a redesign to match period detailing, which stalls permits and blows the schedule. We front-load those approvals.
  • Under-quoted tight-lot access. A quote that ignores a narrow alley approach or a blocked driveway misses the real cost of material handling and pump or crane placement. On tight McKinney lots, access is a line item.
  • Un-engineered foundation tie-in. Cutting a new footing into a pier-and-beam house on blackland clay without surveying the tie-in leaves differential movement that shows up as cracked drywall months later. The clay across Collin County swells and shrinks with the wet-dry cycle, and old foundations have already moved.
  • Cutting a post-tension slab blind. In the 75071 subdivisions the danger is the reverse: sawing into a post-tension slab before locating the tensioned cables. That’s a job for a trained professional with a locate and an engineer, not a concrete saw and a guess.

Pricing for Home Additions & ADU in McKinney, TX

A framer checking new wall framing on a home addition

McKinney pricing has to account for which side of town you’re on. A historic-core addition that needs design review plus a staged tight lot prices differently from a greenfield project out by US 380, even at the same square footage. Here’s the honest range, in dollars you can screenshot and compare:

Project Typical McKinney range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

What moves you within that range: foundation work and tie-in engineering, permit and historic-district approval complexity, staging and access, and finish level. You get a flat written price and scope before we start, and no change proceeds without a signed change order. Call (844) 761-8346 for a free estimate; second opinions on a written quote are free too.

We Also Serve Cities Near McKinney

We work across the northern Collin County corridor, so additions and ADUs in Melissa, Allen, Princeton, and Fairview are routine for us. Each city has its own review timeline and lot pattern, and we price for the one you’re in. If you’re reading this from McKinney and want the same approach nearby, we cover the surrounding towns as well.

Serving McKinney, TX – Our Local Coverage Area

We serve McKinney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in McKinney

A new stained cedar privacy fence

Why McKinney Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in McKinney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in McKinney

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What McKinney Customers Say

Trusted by homeowners across McKinney and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsula

More services in McKinney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in McKinney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in McKinney.

(844) 761-8346

Request a Free Estimate in McKinney

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch