A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Melissa, TX

Home Additions & ADU in Melissa - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Melissa

If you’re adding on in Melissa, the price you get before anyone opens a wall is the number you should be able to hold us to. Home additions here typically run $45,000 – $130,000, and detached ADUs run $90,000 – $220,000 because they carry their own foundation, utilities, and inspection sequence. We work in Melissa’s fast-growing subdivisions off US 75 and around the historic center along McKinney Street, and we know what builder-grade construction looks like once the drywall comes down. One call to (844) 761-8346 and a live person answers, day or night. From there we inspect first, put the scope and price in writing, and nothing moves until you’ve signed off.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Melissa’s Preferred Home Additions & ADU Company

A garage converted into a guest room and home office

Melissa isn’t an old town with old houses. It’s a small Collin County farm community that turned into one of the fastest-growing suburbs on the US 75 corridor north of McKinney, so most of the housing stock is first-generation: new builds on freshly graded lots, builder-grade finishes, slab-on-grade foundations. That changes how an addition gets built. We plan for first-generation settlement, inspect what the production builder left behind, and write allowances into the contract so a hidden problem doesn’t arrive as a surprise bill.

Homeowners in Melissa get a written flat price before any work starts, a written scope, and a written warranty. Clause 1 of the Haven Standard is the whole point: the number is on paper before anyone picks up a tool. If we open a wall and find outdated wiring or undersized framing, the change is priced and approved in writing before we touch it. Every crew that arrives is background-checked and uniformed, and every visit includes a documented photo record as a standard deliverable, not an upgrade. Calls are answered by a live person 24/7, and you can reach us at (844) 761-8346. If you have a competitor’s quote in hand, we’ll review it line by line at no charge through our Free Second Opinion offer.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Melissa

Our Home Additions & ADU team handles the full range of add-on work in Melissa, from a single room to a fully permitted detached unit. The four we do most here:

ADU Design & Permitting

An accessory dwelling unit is a self-contained living space on the same lot as your house, with its own entrance, kitchen, and bath. In Melissa, that means design drawings, a site plan, and a permit package that clears town review while the inspection pipeline is still scaling up. We handle the design and permitting sequence so the build isn’t held up by paperwork.

ADU Design & Permitting

Garage Conversion ADU

Converting an attached garage into a living unit is the fastest way to add square footage without touching the roofline. The work is mostly interior: insulation, a bath, a kitchenette, and the utility rough-in a garage never had. A garage conversion in Melissa typically runs $30,000 – $80,000, well under a ground-up build.

Garage Conversion ADU

New Detached ADU

A detached ADU is a separate structure on your lot, and on Melissa’s fresh fill it needs its own foundation design that accounts for clay movement. That drives the price to the $90,000 – $220,000 range. We plan the drainage and slab before the first form goes down.

New Detached ADU

Junior ADU & Interior Conversion

A junior ADU is a smaller unit built inside the existing footprint, often from a spare bedroom, converted garage bay, or unused storage area. It’s the lower-cost path when you don’t need a full kitchen. The permit still triggers inspection of anything the walls reveal.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Melissa

When the addition calls for fencing, a patio, or hardscape, we source through a catalog of more than fifty vetted brands, including Belgard and Unilock pavers and ActiveYards fencing. Naming the brand is how the written quote gets honest numbers instead of inflated ones. We don’t claim to keep parts on a truck; the material is specified on the quote and delivered to the Melissa job. That keeps the schedule predictable and the price where we wrote it.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Home Additions & ADU Problems We See in Melissa Homes

The reason an addition quote moves in Melissa is almost always something found after the walls are opened. Here’s what we run into:

  • Permit-triggered upgrades. Opening a wall often reveals outdated wiring or undersized framing from the original production build. The fix requires a change order and a new inspection before work continues, which is why we price it in writing first.
  • Failed waterproofing at slab-on-grade transitions. Fresh fill and clay movement cause moisture intrusion around new additions. The remedy is revised drainage grading, planned before the slab is poured.
  • Builder-grade subfloor and framing shortcuts. An addition tied into the existing structure often needs reinforcement or replacement to meet current code, adding scope you never budgeted for. We document it with the photo record and price it before touching it.
  • Drainage complaints on newly graded lots. Builders sometimes grade to send runoff toward a neighboring slab or the addition’s foundation. That means re-grading, and occasionally foundation repair, before final sign-off.

The clay and the fill are why

Because most Melissa subdivision homes sit on freshly graded fill over expansive blackland clay, an addition’s foundation and drainage have to account for first-generation settlement. This is the one thing that separates building here from building in an older, settled neighborhood like McKinney’s historic core, where the soil has already moved and the ground has found its level. In Melissa, the ground is still finding its level. North Texas clay swells when it’s wet and shrinks when it’s dry, and that cycle pushes on a new slab for years. We design the drainage first and the foundation around it. A typical job here looks like this: while opening walls for an addition on a builder-grade Melissa home, contractors commonly find undersized ceiling joists or missing fire-blocking that the original builder never meant to have exposed. The usual fix is to reframe the load-bearing path and add proper rough-in for electrical and plumbing before new drywall goes up, with an inspection sign-off required before the walls close. We price that work as a written allowance before we start, so it lands in the contract instead of on your lap.

Pricing for Home Additions & ADU in Melissa, TX

A framer checking new wall framing on a home addition

Here are the ranges we work to in Melissa’s market. These are the numbers you can compare against another quote, not a “call for pricing” placeholder.

Project Typical Melissa Range
Home Addition (room addition, first floor) $45,000 – $130,000
ADU Construction (detached) $90,000 – $220,000
Garage Conversion ADU $30,000 – $80,000

What moves the price within those ranges: foundation design for clay and fill, the depth of utility rough-in, and what the inspection turns up once walls are open. A second-story addition costs more than a single-story room because of the structural and load-path work. Every project gets a flat written price and written scope before work begins, and no change proceeds without your signed change order. The estimate is free, and so is the second opinion on another contractor’s quote.

We Also Serve Cities Near Melissa

We take on work in the communities around Melissa too: McKinney, Princeton, Allen, and Fairview. Each has its own soil and housing character, so the plan changes from one town to the next. You can read more about our Home Additions & ADU in Melissa work, or call (844) 761-8346 and we’ll route the right crew to your address.

Serving Melissa, TX – Our Local Coverage Area

We serve Melissa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Melissa

A new clay tile roof

Why Melissa Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Melissa.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Melissa

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Melissa Customers Say

Trusted by homeowners across Melissa and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerNew double-hung windows in a dining room

More services in Melissa

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Melissa?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Melissa.

(844) 761-8346

Request a Free Estimate in Melissa

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch