







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Melissa
Kitchen remodels in Melissa run $14,000 – $45,000 for a full project, and most take three to eight weeks from demo to final inspection. Rowan Construction Group Plano works Melissa homeowners through The Haven Standard: a flat written price and a written scope before anyone picks up a tool, no work on a change until the change order is signed, and a documented photo record of every visit. Our technicians have up to 19 years of experience, and we know this stretch of the US 75 corridor – from the new subdivisions off SH 121 to the older homes near McKinney Street – well enough to plan for what’s actually under your floor. Call (844) 761-8346 to schedule your free estimate.
Why Rowan Construction Group Plano Is Melissa’s Preferred Kitchen Remodeling Company

Melissa is one of the fastest-growing towns on the US 75 corridor north of McKinney, and that growth shapes every kitchen project here. Most of the homes we’re asked to remodel are new-construction builds on freshly graded former farmland, which means the work skews toward first-round upgrades rather than renovation of old stock: finishing out builder-grade cabinets, relocating a sink, adding an island the builder never offered. Our technicians have up to 19 years of experience in exactly this kind of project.
Under the Haven Standard, every Melissa kitchen gets a flat written price and written scope before work begins, and no change proceeds until the change order is signed – the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs. We answer calls 24/7 with a live person, and every visit includes a documented photo record as a standard deliverable, so you can see what we found under a floor or inside a wall rather than take our word for it. Bring a competitor’s written estimate and we’ll review it line by line at no charge through our Free Second Opinion. You’ll get a text confirmation, not a phone promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Melissa
Most of our Melissa work centers on kitchen design, full remodels, and island installs – the three things homeowners here ask for most. Here’s how each one fits the local ground conditions and the county permitting pipeline.
Kitchen Design & Layout
Layout comes first in a Melissa kitchen, and that means measuring floor flatness before anyone draws a cabinet run. On slab-on-grade homes built on fresh fill around the SH 121 corridor, that check tells us whether cabinets will rack within a season. We also verify which walls are load-bearing before a relocated rough-in forces a header discovery mid-job.
Full Kitchen Remodeling
A full remodel typically runs $14,000 – $45,000 in Melissa and covers cabinets, countertops, backsplash, flooring, and any plumbing or electrical relocation. We scope the work in writing with clear allowances, so a slab that has moved since the builder turned the home over becomes a documented change order instead of a surprise. County permits and inspection sign-off are handled before the walls close.
Kitchen Island Installation
Island installs run $3,000 – $10,000 in Melissa and depend on what the slab can support after settlement. We check for level and for any drainage or soil issues before anchoring, since a heavy island on a still-moving slab is a fast way to crack tile and rack doors. If a plumbing or electrical rough-in is involved, that’s planned into the written scope.
Cabinets & Countertops
Cabinets run $4,000 – $13,000 and countertops $2,000 – $6,500 in Melissa, with quartz and granite the most-requested choices in the newer subdivisions. We source through over fifty vetted brands, including KraftMaid and Wellborn for cabinetry and Cambria and Caesarstone for counters, so the written quote carries honest numbers.
Backsplash, Tile & Flooring
Backsplash installs run $800 – $2,500. Before any tile goes down, we check that the substrate is flat – a slab that has shifted on blackland clay will telegraph through a large-format floor tile if the prep is rushed. That check happens before pricing, not after.
Trusted Brands We Service in Melissa
We work with over fifty vetted material brands, and the Melissa projects tend to lean on a handful of them: KraftMaid and Wellborn cabinets, Cambria and Caesarstone counters, Kohler and Toto fixtures. We don’t stock parts locally and we don’t claim to – the sourcing depth is what lets us put honest numbers in a written quote instead of inflated ones. If you’ve chosen a specific cabinet line or countertop slab, tell us at the estimate and we’ll price it accurately. For homeowners exploring modular options, brands like Plant Prefab and Boxabl factor into some addition and finish-out conversations, though a standard kitchen remodel doesn’t typically need them.
See the difference
Before
After
Before
After
Before
AfterCommon Kitchen Remodeling Problems We See in Melissa Homes
- Layouts drawn before the slab is checked. On freshly graded Melissa lots, expansive blackland clay and new fill are still settling, so cabinet runs and tile floors go out of level and doors and drawers rack within a season. Measuring floor flatness first is the fix.
- Loosely written allowances. When a scope is written around vague cabinet, countertop and backsplash allowances, every upgrade selection turns into an unplanned change order. The written scope has to name the numbers.
- Load-bearing headers discovered mid-job. Opening a wall for a relocated rough-in on a builder-grade Melissa home can reveal a header that wasn’t in the original plan. Verifying which walls are load-bearing before layout keeps the timeline honest.
- Schedules that ignore the county pipeline. Remodel timelines in Melissa that don’t account for county permitting and inspection sign-off can leave a punch list stranded behind a stalled framing or rough-in inspection. Permits get planned into the schedule, not bolted on.
Pricing for Kitchen Remodeling in Melissa, TX

Here’s what kitchens actually cost in Melissa. Every Rowan project gets a flat written price and written scope before work starts – “call for a quote” isn’t an option here. No work proceeds on a change until the change order is signed.
| Service | Typical Melissa range |
|---|---|
| Full Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
What moves the number in Melissa: slab condition and any leveling, load-bearing wall changes, whether plumbing or electrical gets relocated, and material selection. Bring a competitor’s written estimate and we’ll review it line by line at no charge. Call (844) 761-8346 for a free estimate.
We Also Serve Cities Near Melissa
We work across the US 75 corridor and the surrounding Collin County towns. If you’re just outside Melissa, our Kitchen Remodeling in Melissa coverage extends to McKinney, Princeton, Allen, Fairview and the surrounding communities, and the same written-price discipline applies in all of them. Call (844) 761-8346 to schedule your free estimate.
Serving Melissa, TX – Our Local Coverage Area
We serve Melissa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Melissa

Because the ground and the permitting differ. Melissa’s newly graded lots sit on blackland clay and fresh fill that are still settling, so we measure floor flatness and verify load-bearing walls before pricing – that prep work is real scope, and skipping it is how a “cheaper” quote becomes a change order. County permitting and inspection also add steps. Call (844) 761-8346 for an exact quote – estimates are free.
Yes – most kitchen remodels that touch plumbing, electrical, structural walls or gas need a permit, and on acreage properties around Melissa the issuing authority can be the county rather than the town, depending on where the lot sits. We confirm the jurisdiction and pull the permit before work begins, and we schedule the inspection sign-offs into the timeline. Call (844) 761-8346 to talk through your project.
Usually yes, but the slab has to be checked first. On fresh fill in Melissa’s newer subdivisions, an island anchored to a still-moving slab is a fast way to crack tile and rack doors, so we check for level and any settlement before anchoring and factor that into the written scope. Island installs run $3,000 – $10,000. Call (844) 761-8346 for a free estimate.
A flat price, a written scope with named allowances, the permitting jurisdiction, and a written warranty – all before a tool is picked up. On acreage around Melissa, that scope should also address equipment access, haul distances for materials, and any septic or well setback concerns near the kitchen footprint. No work proceeds on a change until the change order is signed. Call (844) 761-8346 for a free estimate.
Most full kitchen remodels run three to eight weeks in Melissa, with the county permitting and inspection pipeline the most common cause of delay. Smaller projects like countertops or an island can be shorter. We build the permit and inspection dates into the schedule up front so a framing or rough-in sign-off doesn’t strand the punch list. Call (844) 761-8346 for an exact timeline.
Written by the team at Rowan Construction Group Plano.












