A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Plano, TX

Kitchen Remodeling in Plano - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A new curved paver walkway to the front porch
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Plano

Kitchen remodeling in Plano typically runs $14,000 – $45,000 for a full gut renovation, with smaller partial remodels landing between $9,000 and $20,000. We quote a flat written price before anyone picks up a tool. If you live in Deerfield, Willow Bend, Russell Creek, or the newer infill around Legacy West, you already know most of the kitchens here are original builder-grade stock from the 1980s through the 2000s, and that changes how a remodel should be planned. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Plano’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

Rowan Construction Group works under The Haven Standard, a written set of terms that puts the price on paper before any work starts and requires a signed change order before a project shifts scope. Under Clause 1, the number you agree to is the number you pay, and that discipline has kept our projects within a few percent of the agreed cost. Plano homeowners researching contractors the way they research appliances seem to appreciate that more than a sales pitch.

Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before arriving at your door. A live person answers calls 24/7, and every visit includes a documented photo record as a standard deliverable, not an optional add-on.

Plano’s building department and its HOA architectural review boards run tight. We know the difference between what the city requires on a permit and what a subdivision committee wants to see in a plan, and we build that lead time into the schedule instead of discovering it during demo.

If you already have a written estimate from another contractor, we will review it line by line at no charge through our Free Second Opinion offer. Plenty of Plano homeowners take us up on it before signing anything.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Kitchen Remodeling Services in Plano

Our Kitchen Remodeling team handles the full scope, from the first layout sketch to the final walkthrough. The work below covers what Plano kitchens most often need.

Full Kitchen Remodeling

A full remodel in Plano means new cabinets, countertops, backsplash, flooring, and often a reworked layout, all quoted as one flat price with a written scope. Expect $14,000 – $45,000 depending on square footage and finish level. In a typical Plano kitchen remodel, the original builder-grade cabinets from a 1980s – 2000s tract home are often still serviceable but the doors, hardware, and countertops are due for replacement, so a qualified pro usually starts by checking the slab for levelness before setting new cabinets.

Cabinets & Countertops

Cabinet installation runs $4,000 – $13,000 and countertop installation $2,000 – $6,500. We source KraftMaid and Wellborn cabinets and Cambria and Caesarstone countertops, so the written quote carries honest numbers rather than inflated allowances. If your boxes are sound and only the doors and drawers are dated, refacing can save you several thousand dollars.

Backsplash, Tile & Flooring

Backsplash installation in Plano runs $800 – $2,500, and tile flooring is priced per the same written-scope approach. North Texas humidity swings matter here: a membrane under the tile and a properly sealed substrate keep grout lines from cracking through the year.

Kitchen Design & Layout

Layout work in Plano tract homes is usually about working with the existing plumbing and electrical rough-in rather than moving it, which keeps the project inside a written scope of work. When the layout genuinely needs to change, we price that change on paper before demo starts. A kitchen island installation runs $3,000 – $10,000 and often delivers the most usable square footage for the money.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Plano

Our sourcing depth runs across more than fifty vetted brands, including KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, and Kohler and Toto fixtures. For exterior and site work tied to a kitchen addition, we draw on Oldcastle and Quikrete materials. We don’t stock parts locally or run a warehouse, so every material order is placed against your written scope and scheduled to the project timeline. That means no guessing at lead times and no surprise substitutions mid-job. If a specified slab or cabinet line is backordered, you hear it from us before the schedule slips, and the change order gets signed before anything moves.

Common Kitchen Remodeling Problems We See in Plano Homes

Plano is built out. Almost no greenfield construction is left, so kitchen work here is nearly always a remodel of master-planned tract housing rather than new building, and the problems that come up are consistent.

  • Skipping the slab levelness check. The expansive black clay under Plano’s slab-on-grade subdivisions shrinks and swells with the wet-dry cycle, and cabinets set on an out-of-square run will bind. We check the slab before demo, not after, so a foundation correction doesn’t become a mid-project change order.
  • Voiding a builder warranty. On newer homes near Legacy West, replacing cabinets or countertops can touch systems still covered by the original builder. We confirm what’s protected before the first cabinet comes out.
  • Starting demo before permits and HOA review. Overlay subdivisions like Willow Bend and Deerfield require architectural review on top of the city permit, and that adds lead time. Pulling permits first keeps the job legal and the inspection clean.
  • Working around an unresolved drainage issue. Water pooling against a Plano slab accelerates the movement that throws a kitchen out of level. When we find a grading problem during a remodel, we flag it and price the fix in writing rather than tiling over it.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Kitchen Remodeling in Plano, TX

A finished backyard cottage with a small covered porch

Here is what the numbers look like in Plano’s market. These are line-item ranges, quoted flat with a written scope and written warranty before work begins. Bring a competitor’s quote and we will review it line by line at no charge.

Service Typical Plano Range
Kitchen Remodel (full) $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

What pushes a Plano job toward the top of a range: moving plumbing or gas lines, foundation correction on a clay-soil lot, custom cabinetry versus semi-custom, and natural stone over quartz. What keeps it low: refacing sound cabinet boxes, keeping the existing layout, and choosing a standard backsplash tile. None of these are guesses. They are line items you approve in writing.

We Also Serve Cities Near Plano

Our independent local professionals also work in Richardson, Fairview, Lucas, and Allen. If you’re just outside Plano’s city limits, the foundation and permitting picture looks similar enough that the same sequence applies. Learn more about Kitchen Remodeling in Plano or the surrounding communities we cover.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Kitchen Remodeling in Plano

A new clay tile roof

Ready for a Written Price on Your Plano Kitchen?

You have the ranges. You know what drives them. The next step is a real number for your kitchen, in writing, with a scope and a warranty attached. Our independent local professionals serve Plano with background-checked, uniformed technicians and a 365-Day Done Right Promise: if it is not done right, we make it right. Call (844) 761-8346 to schedule your free estimate.

Written by the team at Rowan Construction Group.

Why Plano Chooses Rowan Construction Group Plano

We set the standard for kitchen remodeling in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new black aluminum pool fence with a gateA new wood side gate with black hardwareA new concrete driveway with a paver borderA remodeled hall bathroom with subway tile and a floating vanityA garage converted into a guest room and home officeNew architectural shingles with a clean valley

More services in Plano

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Plano?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Plano.

(844) 761-8346

Request a Free Estimate in Plano

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch