







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Construction in Plano, TX
Windows and doors are where most Plano construction conversations start, because a house built in 1994 with the original aluminum frames is now losing cooled air fast enough to show up on the July electric bill. Plano is a built-out, master-planned suburb, so nearly every job here is renovation, addition, or teardown-rebuild on an existing lot rather than new ground. That changes how we quote: the scope has to account for what the last thirty years did to the envelope, not what a fresh build would need. Call (844) 761-8346 for a written price before anything starts.
Why Plano Homes Are Different
The housing stock across Plano runs from 1980s brick-veneer tract homes in Deerfield through the 1990s and 2000s subdivisions at Willow Bend and Russell Creek, with newer infill at Legacy West. Plano has little undeveloped land, so the work concentrates on upgrading what’s already standing.
The ground underneath is the other factor. Expansive black-clay soil across Plano’s slab-on-grade subdivisions swells when it’s wet and shrinks in drought, which moves foundations and, by extension, door frames, window openings, and roof decks. Spring hail is a routine event rather than a surprise. And Plano’s permitting and HOA overlays are strict, particularly in Legacy West and the older Willow Bend and Deerfield subdivisions, where exterior changes can require architectural review before a permit is even filed. We budget for that review time into the schedule instead of letting it surprise you mid-project.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Main Plano Services
Two services account for most of the calls we take from Plano homeowners: windows and doors on houses whose original frames have failed, and roofing on shingle fields that hail and heat have finished off.
Driveway & Pavers in Plano
A driveway in Plano takes a beating that driveways in sandier metros don’t. The clay beneath a slab-on-grade subdivision moves through the wet-dry cycle, so a poured concrete drive that looked fine five years ago can show diagonal cracking and settled sections along the apron. We assess the base before we talk about surface, because resurfacing over a bad subgrade just buys you a shorter failure. Paver and concrete options are both on the table depending on how the lot drains. See Driveway & Pavers in Plano for the full breakdown.

Fence Installation in Plano
Fence work in Plano runs into two local realities: HOA height and material rules that vary by subdivision, and clay soil that heaves posts out of plumb faster than sandy ground would. We set posts to account for that movement and pull the plat and HOA covenants before the crew arrives, so the fence you get is the fence that’s allowed. Cedar privacy fencing and aluminum are the two most common requests in the older subdivisions. Details are on Fence Installation in Plano.

Home Additions & ADU in Plano
Because Plano is built out, adding square footage usually means going up or out on an existing lot rather than finding land. That brings setbacks, impervious-cover limits, and HOA review into the conversation early. We look at how the addition ties into the existing roofline and foundation, which matters on clay soil where a new footing can settle at a different rate than the original slab. Detached ADUs and garage conversions are both common here for multigenerational households. Read the full scope at Home Additions & ADU in Plano.

Bathroom Remodeling in Plano
A bathroom in a 1990s Plano tract home usually has the same list of problems: a fiberglass tub-and-shower surround at the end of its life, original vinyl flooring, and a vanity that no longer fits how the room gets used. We check the substrate and the shower pan before we quote tile, because a failed pan under new tile is a leak waiting to happen. Tub-to-shower conversions are the single most requested job. See Bathroom Remodeling in Plano for what each configuration involves.
Kitchen Remodeling in Plano
Kitchens in Plano’s 1980s and 1990s subdivisions were built with builder-grade cabinets, laminate counts, and a layout that assumed a smaller appliance package than what’s now standard. Most of the work is reconfiguration rather than pure cosmetics: opening a wall, rerouting a range hood, upgrading the electrical for a modern appliance load. Cabinet and countertop selection drives most of the budget, and we name the actual brands in the quote. The full options are at Kitchen Remodeling in Plano.
Windows & Doors in Plano

Windows and doors are the first thing we look at on any Plano house built before 2005, because the original aluminum and early vinyl units installed across Deerfield, Willow Bend, and Russell Creek were never meant to handle North Texas summers for thirty years. Thermal seals fail, frames warp on the sun-facing elevations, and the cooling loss compounds every July. Our full scope is on the Windows & Doors page, and every quote is a written price before a single unit comes out.
Window Replacement
Replacing the original single-pane and early dual-pane units that have lost their seal.
Signs you need it
Fogging between the panes, condensation that won’t clear, a draft you can feel at the frame, or a cooling bill that’s climbed two summers running with no other change.
What it costs in Plano
Window replacement in Plano typically runs $4,500 – $15,000 across a house, depending on unit count, frame material, and how many openings need re-flashing.
How we do it
We measure every opening, order the units to specification, remove the old frames, check and repair the rough opening and flashing, then set, shim, insulate, and seal each unit before checking operation and documenting the install with photos.
Energy-Efficient Windows
Upgrading to low-E, argon-filled units rated for the local climate, with attention to solar heat gain on west elevations.
Signs you need it
Rooms on the west side of the house that stay hot through the evening regardless of the thermostat setting, or glazing that’s cold to the touch in winter.
What it costs in Plano
Impact-rated and energy-efficient window installation in Plano runs $8,000 – $25,000, with the higher end driven by unit count and the impact rating itself.
How we do it
We match the glazing spec to the orientation of each elevation, verify the U-factor and solar heat gain rating before ordering, and install with the same flashing and sealing sequence so the efficiency gain isn’t lost at the frame.
What Windows & Doors Costs in Plano
| Item | Typical range in Plano |
|---|---|
| Window Replacement | $4,500 – $15,000 |
| Impact Window Installation | $8,000 – $25,000 |
| Door replacement (exterior, per opening) | $4,500 – $15,000 |
Do Plano HOAs have to approve new windows or doors?
Often yes, especially in Legacy West, Willow Bend, and Deerfield, where exterior changes go through architectural review. We ask for the HOA covenants before ordering anything, so the units you receive are the ones that were approved.
How long does a window replacement take in Plano?
A whole-house replacement typically takes two to four days once the units arrive, and ordering lead time runs several weeks depending on the manufacturer and rating. We give you both dates in writing at the quote stage.
Roofing in Plano

Roofing in Plano is a hail-and-heat problem. The composition shingle fields installed across 1980s through 2000s subdivisions at Russell Creek and Willow Bend are now at or past the twenty-year mark, and North Texas spring hail finishes off the ones that heat alone didn’t. We inspect the layer count, the deck condition, and the flashing before quoting, because a repair on a roof that’s already at the end of its life just moves the cost forward. The full scope lives on our Roofing page.
Roof Repair
Targeted repair on a roof that still has service life left, usually after a hail event or a flashing failure.
Signs you need it
Granule loss in the gutters, a single ceiling stain after a storm, or visible damage limited to one slope or one penetration.
What it costs in Plano
Roof repair in Plano generally runs $400 – $1,800, depending on the extent of the damage and whether decking needs replacement.
How we do it
We photograph the damage, confirm the shingle match, replace the affected shingles or flashing, and reseal the penetrations before documenting the repair.
Roof Replacement & Installation
Full tear-off and re-roof when the existing shingle field is at the end of its service life.
Signs you need it
Shingles curling or losing tabs across multiple slopes, a roof past twenty years old, or repeated leaks in different areas after the same storm.
What it costs in Plano
Roof replacement in Plano runs $8,000 – $20,000, driven by roof size, pitch, and how much decking needs replacement.
How we do it
We tear off to the deck, inspect and replace any rotted sheathing, install underlayment and new shingles to spec, then photograph the finished roof and haul the debris away.
What Roofing Costs in Plano
| Item | Typical range in Plano |
|---|---|
| Roof Repair | $400 – $1,800 |
| Roof Replacement | $8,000 – $20,000 |
| Metal Roof Installation | $15,000 – $40,000 |
Will insurance cover my Plano roof after hail?
Often it will, if the damage is storm-related and documented. We photograph the damage in detail and provide a written scope you can submit to your adjuster, then review their estimate with you at no charge.
How long does a roof replacement take in Plano?
Most residential re-roofs take one to three days once materials are on site. We give you the schedule in writing, and if decking damage turns up mid-tear-off, nothing proceeds on that change until you sign the change order.
Brands We Service in Plano
Our material lineup includes GAF and Owens Corning roofing systems, Kohler and Toto fixtures, and KraftMaid and Wellborn cabinetry, among fifty-plus vetted brands. We don’t stock parts locally, so ordering lead time depends on the manufacturer and the specific product. Browse the full list on our brands page.
See the difference
Before
After
Before
After
Before
AfterPricing for Construction in Plano, TX
| Service | Typical range in Plano |
|---|---|
| Window Replacement | $4,500 – $15,000 |
| Impact Window Installation | $8,000 – $25,000 |
| Roof Repair | $400 – $1,800 |
| Roof Replacement | $8,000 – $20,000 |
| Metal Roof Installation | $15,000 – $40,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Kitchen Remodel | $14,000 – $45,000 |
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Paver Driveway Installation | $7,000 – $18,000 |
In Plano, price climbs fastest when the scope runs into clay-soil foundation corrections, roof decking replacement, or undocumented work behind a wall. Older homes in Deerfield and Willow Bend are more likely to hide that than infill at Legacy West. Under Clause 1 of the Haven Standard, the price is written before anyone starts, and no change proceeds without a signed change order. Call (844) 761-8346 for a free estimate.
Neighborhoods We Serve in Plano
We work across Plano’s master-planned subdivisions and the older established neighborhoods, from the 1980s tract homes to the newer infill near Legacy West. Clay-soil conditions and hail exposure are consistent across the city, so scheduling and inspection don’t change much by address.
- Deerfield
- Willow Bend
- Russell Creek
- Legacy West
- Carey Estates
Service Area – Cities Near Plano
Plano sits in the middle of a cluster of suburbs with similar housing eras and similar clay underfoot, so we take jobs across the surrounding area. Homeowners in Richardson, TX tend to have slightly older housing stock, while Fairview, TX and Lucas, TX run more toward larger lots and newer construction. Allen, TX to the north shares Plano’s 1990s and 2000s subdivision pattern almost exactly. Wherever you are in that ring, the quote is written before work begins.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About Construction in Plano
You call (844) 761-8346 and we schedule an assessment. You receive a flat written price with a written scope and written warranty before any work starts. The estimate is free, and if you have a competitor’s quote we’ll review it line by line at no charge.
Most structural, electrical, and exterior changes require a permit, and HOA overlays in subdivisions like Legacy West and Willow Bend can add architectural review on top. We pull the permits and handle the inspections as part of the job.
Lead time depends on the trade and the material order. Window and door orders typically run several weeks for delivery, roofs move faster once materials land, and additions depend on permit turnaround. You get the schedule in writing at the quote stage.
Call (844) 761-8346 to schedule your free estimate. Every project comes with a flat written price, a documented photo record, and the 365-Day Done Right Promise. If it’s not done right, we make it right.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local construction pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Plano Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












