A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower

Bathroom Remodeling Near Me in Plano - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A single-story rear room addition with tall windows and a new patio
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
A new paver pool deck
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Bathroom Remodeling Near You in Plano, TX

Bathroom remodeling in Plano, TX runs $9,500 to $16,500 for a standard hall bath and $22,000 to $38,000 for a primary suite, including demolition, tile, fixtures and vanity. Rowan Construction Group connects Plano homeowners with independent local bathroom professionals who put a flat written price in front of you before any work starts. Call (844) 761-8346 and a live person answers, day or night, to get your project scheduled.

If you’re searching “bathroom remodeling near me” from a kitchen table in Plano, you want three things: someone close, someone who shows up, and a number you can hold in your hand before you commit. That’s the whole page. Here’s how it works, what it costs in this market, and what you get in writing.

A tile setter installing wall tile in a shower

Fast, Local Bathroom Remodeling

When you call, we gather the details of your Plano project and route it to an independent local crew that works this part of Collin County regularly. Someone reaches out to schedule a walkthrough, usually within one business day, and often same-day for straightforward refreshes. The technician who comes out has up to 19 years of experience and arrives background-checked and uniformed, with a documented photo record of what they find as a standard deliverable, not an add-on.

That photo record matters more than it sounds. A bathroom is mostly what’s hidden: the substrate under the tile, the waterproofing membrane behind the shower wall, the condition of the subfloor around the toilet flange. When a Plano crew photographs the tear-out and hands you the record, you can see what the written quote was built on. It’s the same discipline behind Clause 1 of the Haven Standard, our founding rule that the price is written before anyone picks up a tool.

Areas We Cover

We serve Plano and the surrounding suburbs, tying homeowners to local professionals who know each neighborhood’s housing stock. That includes bathroom remodeling in Plano proper, plus work in Richardson, Allen, Murphy, Fairview, Lucas, Sachse, and McKinney. Coverage runs across Collin County and the northern edge of Dallas County. If you’re not sure whether your address falls inside the area, call and we’ll tell you straight.

Local context shapes the work here more than a national guide will admit. Plano’s 1980s and 1990s subdivisions often have original cultured-marble surrounds and single-handle valves nearing the end of their service life, while the newer builds around Murphy and Fairview tend toward larger primary baths where the tile and waterproofing are the real line item. A crew working these streets knows which era they’re walking into before they open the door.

A new black aluminum pool fence with a gate

What a Plano Bathroom Remodel Actually Costs

Dallas-area pricing varies by scope, but here are honest ranges for the Plano market. Every one of these comes to you as a flat written price with a written scope and a written warranty, not a “call for a quote.”

Project Typical Plano range
Cosmetic refresh (vanity, fixtures, paint, no layout change) $4,500 to $9,000
Standard hall bath (full gut, tub or shower, tile, vanity) $9,500 to $16,500
Primary bath (double vanity, walk-in shower, tile floor) $22,000 to $38,000
Tile shower rebuild with new waterproofing membrane $5,000 to $11,000
Vanity and countertop replacement $1,800 to $5,500

Material choice moves these numbers. We source across fifty-plus vetted brands, so the written quote reflects real costs rather than padded ones. That includes KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, and Kohler and Toto fixtures. If you want a marble-look quartz and a panel-ready vanity, we can price it honestly; if budget is tighter, we’ll say so and show you where the money does the most work.

And because no work proceeds on a change until the change order is signed, the number you agree to is the number you pay within a few percent. That discipline is the reason our projects finish close to the agreed price, and it’s why a free second opinion on any written estimate, reviewed line by line, is a standing offer. Bring a competitor’s quote and we’ll walk through it with you at no charge.

Why Homeowners Call Us Before Anyone Else

  • Written price before any work starts – on every trade, every time, under Clause 1 of the Haven Standard.
  • 365-Day Done Right Promise – if it isn’t done right, we make it right. Backed by a terms page, not an asterisk.
  • Documented photo record on every visit, included as standard.
  • Background-checked, uniformed technicians, with a live person answering calls 24/7.
  • Signed change orders only – nothing moves forward on a verbal yes.

We connect you with independent local professionals who perform the work. Our job is to make sure the price is written, the crew is vetted, and the record is documented. That’s how a bathroom project stays on budget from the first walkthrough to the final walkthrough.

If you’re weighing bathroom work against a larger project, you can see our full range on our home page. Bathroom remodels pair naturally with other updates, and because we operate across seven trades, the written price covers the whole scope rather than leaving you to coordinate three separate contractors.

Do You Serve My Area in Plano?

Yes – if you’re anywhere in Plano or the surrounding Collin County suburbs, we serve your area. That covers Richardson, Allen, Murphy, Fairview, Lucas, Sachse, and McKinney. Call and tell us your cross streets; we’ll confirm coverage and get you scheduled.

How Fast Can You Get Started?

Most Plano projects get a walkthrough scheduled within one business day of your call, and straightforward refreshes often go same-day. Larger primary-bath remodels take longer to schedule because the scope and material lead times are bigger, but the first step – the written price before any work begins – comes fast. Call (844) 761-8346 for a free estimate and an honest timeline.

How Much Does Bathroom Remodeling Cost in Plano?

A standard hall bath in Plano typically runs $9,500 to $16,500, while a primary suite lands between $22,000 and $38,000, depending on scope and materials. A cosmetic refresh can start near $4,500. You get a flat written price with a written scope and warranty before work begins. Call for an exact quote – estimates are free.

Can I Reach Someone After Hours?

Yes – a live person answers calls 24/7, including nights and weekends. You’ll never get a voicemail maze when a bathroom fixture is leaking or you want to lock in a project before a material sale ends. Call (844) 761-8346 any time and we’ll take it from there.

Ready to Get a Written Price?

Bathroom remodeling near you in Plano starts with one call and a written number in your hand before a single tile comes up. We’ll connect you with a vetted local crew, document what’s behind the walls, and keep the price honest through a signed change order. Call Rowan Construction Group Plano at (844) 761-8346 for a free estimate today, and see the difference a documented process makes.

Written by the team at Rowan Construction Group Plano, serving Plano and nearby areas.

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled kitchen with a waterfall island and wood cabinets

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346

Request a Free Estimate

Tell us what's going on in Plano. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch