A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Murphy, TX

Bathroom Remodeling in Murphy - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A walk-in shower with large-format tile and a built-in niche
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A finished backyard cottage with a small covered porch
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Murphy

Bathroom remodeling in Murphy typically runs $9,000 to $28,000 for a full gut-and-rebuild, and most of that range is driven by what’s under the tile rather than what’s on it. If your home sits in an established Murphy neighborhood off West FM 544 or near the Tom Kimbrough Stadium corridor, you’re likely working with a 1980s – 2000s brick-veneer house where the original drain lines and venting were sized to a code book from a different era. That’s worth knowing before demo starts, not after. Call (844) 761-8346 to schedule a free estimate; a written, line-item price comes before anyone lifts a tool.

Call (844) 761-8346

We work in Murphy often enough to know the permit desk, the inspection rhythm, and the kind of surprises these houses hold. Our technicians have up to 19 years of experience, every crew is background-checked and uniformed, and calls are answered by a live person around the clock.

Why Rowan Construction Group Plano Is Murphy’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Murphy is a fully built-out Collin County suburb, which means almost every bathroom project here is a remodel inside an occupied home rather than part of a new subdivision build. That changes the job. You’re working around a family that still needs a functioning bathroom, in a house that’s been lived in, where the framing and plumbing reflect whatever was standard when the home went up. Our crews are set up for occupied-home work: dust containment, a documented photo record on every visit as a standard deliverable, and a written scope the customer signed off on before the first tile came off the wall.

The thing Murphy homeowners tend to ask about first isn’t the tile selection. It’s the number, in writing, and whether it holds. Under Clause 1 of The Haven Standard, the price is written before anyone starts – a flat price with a written scope and a written warranty, not a “call for a quote” runaround. No work proceeds on a change until the change order is signed, which is the reason our projects finish within a few percent of the agreed cost. If you’re weighing a competitor’s estimate, we’ll review it line by line at no charge through our Free Second Opinion offer. That’s the local reputation we’ve built: precise bids, documented work, and a live person on the phone when you call (844) 761-8346.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in Murphy

Our Bathroom Remodeling team handles the full range of Murphy bathroom work, from small hall-bath refreshes to complete gut rebuilds. Here’s where most of the demand sits.

Full Bathroom Remodeling

A full Murphy bathroom remodel runs $9,000 to $28,000 and covers demo, rough-in updates, waterproofing, tile, fixtures, and finish. In Murphy’s older brick-veneer homes, the smart money goes to the parts you can’t see: a camera inspection of the original cast-iron drain before the floor opens up, and confirmation the vent stack is sized for the fixtures going back in. Do that first and the rest of the budget stays honest.

Walk-In Showers & Shower Remodeling

Walk-in shower installation in Murphy typically costs $4,500 to $12,000, depending on whether the drain has to be relocated and how much waterproofing membrane the job requires. We build to a full-tile, properly sloped pan with a waterproof membrane behind it – not a plastic pan dropped onto old subfloor. Frameless glass enclosures are a common upgrade here and we specify the hardware to suit the shower’s actual dimensions, not a stock unit’s.

Tub-to-Shower Conversion

Tub-to-shower conversion runs $3,500 to $10,000 in Murphy. This is the service where Murphy homes get interesting: swapping a tub for a walk-in shower changes the fixture load, and the trap arm and vent stack behind that tub often weren’t sized for it in 1980s – 2000s construction. We verify the rough-in before we close walls. Skipping that check is the single most common way a cheap conversion turns into an expensive comeback.

Vanities, Tile & Fixtures

Bathroom vanity installation runs $800 to $3,000. We work with Kohler and Toto fixtures and Cambria and Caesarstone countertops where the budget allows, and we specify Oldcastle and Quikrete setting materials for tile work so the substrate and mortar meet spec. Tile and fixtures are where a Murphy bathroom gets its character – and where sloppy waterproofing hides until the first wet season.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Murphy

We specify and source through a deep bench of vetted material brands, and the written quote reflects honest numbers rather than inflated ones. Kohler and Toto for fixtures, Cambria and Caesarstone for vanity tops, Oldcastle and Quikrete for the setting and substrate materials that keep tile in place. We don’t claim to stock parts locally – materials are sourced per project against the signed scope – and turnaround on common fixture and tile orders is quick. If you have a brand in mind, tell us at the estimate and we’ll price to it.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Bathroom Remodeling Problems We See in Murphy Homes

  • Original cast-iron drains that fail a camera inspection. Homes built through the 1980s and 1990s in Murphy often still have the original cast-iron drain under the slab, and it can be scaled or corroded well before it leaks. A camera inspection before tile demo tells you whether the allowance holds or the budget blows.
  • Undersized vent stacks behind the tub. A tub-to-shower conversion increases fixture load, and Murphy’s older homes often have vent stacks that were fine for a tub but not for a modern shower valve and drainage pattern. Verifying this before walls close is non-negotiable.
  • No permit trail when walls close. A remodel that skips inspection sign-off leaves nothing on file if a later insurance claim questions the work. Documented compliance matters more than most homeowners realize until they need it.
  • Foundation movement from blackland clay. North Texas blackland clay expands and contracts with the wet-dry cycle, and that movement shows up in bathroom floors, tile cracks, and out-of-level shower pans. We check for it during the estimate so the fix isn’t a surprise mid-job.

Pricing for Bathroom Remodeling in Murphy, TX

A new paver patio with a seat wall and fire pit

Here’s what Murphy bathroom work actually costs, stated in dollars so you can screenshot it and compare. These are our market-calibrated ranges, and a written line-item quote follows the free estimate every time.

Service Murphy Price Range
Bathroom Remodel (full) $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Bathroom Vanity Installation $800 – $3,000

What moves a Murphy bathroom to the top of its range: drain replacement, vent-stack corrections, foundation-related floor leveling, and upgraded tile or glass. What keeps it low: solid existing rough-in, standard-size layouts, and stock vanity and fixture selections. Call (844) 761-8346 for an exact quote – estimates are free, and the price is written before any work starts.

We Also Serve Cities Near Murphy

We work throughout the Murphy area and into the surrounding Collin County communities – Sachse, Wylie, Fairview, and Lucas among them. If you’re in Murphy or nearby and want a written estimate for bathroom work, the process is the same: a free estimate, a line-item price in writing, and a signed change order before any scope change. Call (844) 761-8346 to get on the schedule.

Serving Murphy, TX – Our Local Coverage Area

We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in Murphy

A single-story rear room addition with tall windows and a new patio

Why Murphy Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Murphy.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Murphy

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Murphy Customers Say

Trusted by homeowners across Murphy and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA garage converted into a guest room and home office

More services in Murphy

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Murphy?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Murphy.

(844) 761-8346

Request a Free Estimate in Murphy

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch