A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Cabinets & Countertops in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A finished backyard cottage with a small covered porch
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Cabinets & Countertops in Plano, TX

New cabinets and countertops in Plano typically run $6,800 to $14,500 for a standard 10-by-10 kitchen, and most of that spread comes down to door style, box construction, and countertop material rather than labor. We handle the cabinet and countertop phase of a kitchen remodel as its own measured job: measuring the room, templating the stone, setting the boxes level and plumb, and documenting every step in a photo record you keep. If you’re weighing the full scope of a remodel, start with our Kitchen Remodeling in Plano page and work back to the cabinetry from there.

This is the part of a kitchen where small errors get expensive fast. A cabinet run that’s an eighth of an inch out of square can make a $4,000 quartz slab unusable. A countertop template taken before the base cabinets are set and shimmed will find every flaw in the floor. We measure carefully, we put the price in writing before anyone touches a tool, and we don’t move a change forward until the change order is signed. Call (844) 761-8346 for a free estimate.

Key Takeaways

  • Standard Plano cabinet and countertop replacement runs roughly $6,800 to $14,500, depending on box quality and stone choice.
  • We quote a flat written price with a written scope before work starts – no “call for a quote.”
  • Countertops are templated after cabinets are set, not before, which is what keeps stone edges tight.
  • Our technicians have up to 19 years of experience, and every crew is background-checked and uniformed.
  • The 365-Day Done Right Promise backs every install, and a documented photo record comes standard on every visit.
Installers leveling a new base cabinet during a kitchen remodel

When You Need Cabinets & Countertops

Plano homes built between the early 1990s and the mid-2000s make up a big share of the kitchen work we see, and those rooms tend to fail in the same handful of ways. Here’s what usually signals it’s time.

  • Cabinet boxes are still solid but the doors and drawer fronts are dated. In west Plano subdivisions off Legacy Drive and Parker Road, the original oak raised-panel doors from the 1990s remodel well – we reface or re-door rather than tear out boxes that are still square and load-bearing.
  • Water has warped the sink base. A slow under-sink leak will swell particleboard over a season. If your sink base bows or smells musty after a wet spring, the cabinet box needs replacement even if the rest of the run is fine.
  • The countertop has a visible seam crack or a burn ring you can’t sand out. Laminate over particleboard doesn’t take heat well, and a scorched section near the range means the substrate is compromised, not just the surface.
  • You’re converting an island or peninsula and the stone needs re-templating. Any change to the cabinet footprint means new stone, because the old slab won’t fit a new opening.
  • You bought a 2015-to-2023 Plano home and inherited builder-grade finishes. Many of these kitchens have thermofoil doors that peel at the edges once humidity swings hit, and the fix is a door and drawer-front swap with a new countertop.
  • The drawers don’t close flush and the frames are out of level. A settling slab in a Plano house with expansive clay soil can twist a cabinet run, and shimming fixes it only after we confirm the floor plane with a level reading.

Our Cabinets & Countertops Process

We run cabinet and countertop work as a sequence, because the order of operations is what keeps stone tight and doors aligned. Here’s what the job looks like from the first visit.

  1. Site measure and written scope. We measure the room, note the floor plane and wall squareness, and write a flat price with a written scope before any material is ordered. This is Clause 1 of the Haven Standard – the number is written before anyone starts.
  2. Material selection with brands we can name. Cabinet boxes and doors come from KraftMaid or Wellborn. Countertops come from Cambria or Caesarstone quartz, or from a granite slab yard if you prefer natural stone. You see the exact spec in writing, not a vague “premium cabinets” line.
  3. Cabinet install and shim to level. We set the base cabinets first, shim them level and plumb, and confirm the run is square before anything else gets measured off it.
  4. Countertop template after cabinets are set. The stone shop templates off the installed boxes, then fabricates. That sequence is why our seams land where they should and why edges fit the first time.
  5. Countertop set, sink and faucet fit. We set the slabs, cut and polish the sink opening, and fit the faucet and drain. Kohler and Toto fixtures are common picks here, and we confirm the cutout spec against the fixture before the stone is cut.
  6. Photo record and walkthrough. Every visit gets a documented photo record – what we found, what we set, what changed – and you get it whether you ask or not. That’s standard, not an upgrade.
A new black aluminum pool fence with a gate

Cabinets & Countertops Pricing in Plano

Here’s what cabinet and countertop work actually costs in Plano, laid out so you can screenshot it and compare against any other quote. These are ranges for a standard 10-by-10 kitchen; your number depends on the door style, box construction, countertop material, and whether we’re changing the footprint.

Line item Price range
Stock or semi-custom cabinet boxes and doors (per linear foot) $180 to $420
Cabinet refacing (doors, drawer fronts, veneer) $2,400 to $5,200
Laminate countertop (per square foot installed) $30 to $55
Quartz countertop, Cambria or Caesarstone (per square foot installed) $65 to $95
Granite countertop (per square foot installed) $50 to $85
Sink cutout and polish $150 to $350
Cabinet removal and haul-away $300 to $650

A full cabinet and countertop swap on a standard Plano kitchen lands around $6,800 to $14,500. Refacing plus new quartz is often closer to $5,500 to $8,500. What moves the number: cabinet box quality, the stone you pick, whether the plumbing has to move, and whether the footprint changes at all.

We deliver a written price on every job, free, and it’s a flat number with a written scope and a written warranty – not a range with a “call for a quote” at the bottom. Bring a competitor’s estimate and we’ll review it line by line at no charge through our Free Second Opinion offer. Call (844) 761-8346 to get started, or read more about the full kitchen scope on our Kitchen Remodeling page.

FAQs – Cabinets & Countertops

How much do new cabinets and countertops cost in Plano?

New cabinets and countertops in Plano typically cost $6,800 to $14,500 for a standard 10-by-10 kitchen. Cabinet boxes and doors run $180 to $420 per linear foot, and quartz countertops installed run $65 to $95 per square foot for Cambria or Caesarstone. Call (844) 761-8346 for an exact quote – estimates are free and written.

Is it cheaper to reface cabinets or replace them?

Refacing is usually cheaper – about $2,400 to $5,200 versus a full box swap – but only when the boxes are still square, dry, and solid. If the sink base is water-swollen or the frames are out of level, refacing just covers a problem that will come back. We measure first and tell you which path the boxes actually support. Call (844) 761-8346 to get a measured assessment.

Can you install cabinets and countertops the same week?

Cabinet install usually runs one to two days, and countertop fabrication and set typically adds three to seven business days after templating, because stone is cut after cabinets are set. We schedule the whole sequence in one written plan so you know the dates before work starts. Call (844) 761-8346 to check current scheduling.

What countertop material holds up best in a Plano kitchen?

Quartz from Cambria or Caesarstone is the most common pick here because it resists staining and doesn’t need sealing, which matters in a climate with Plano’s humidity swings. Granite is also a solid choice and often runs $50 to $85 per square foot installed, but it needs periodic sealing. Laminate is the budget option at $30 to $55 per square foot. Call (844) 761-8346 and we’ll walk you through the trade-offs for your kitchen.

Why Homeowners in Plano Call Us

Our technicians have up to 19 years of experience, every crew is background-checked and uniformed, and a live person answers calls 24/7. We’ve delivered 4,000-plus projects with a written price before work started and a documented record when the crew left. The 365-Day Done Right Promise means if it’s not done right, we make it right – printed on every page, backed by a terms page. That’s the whole offer: a number in writing, a signed change order before any change, and evidence when we’re done.

Call (844) 761-8346 for a free estimate on cabinets and countertops in Plano. The quote is written, the scope is written, and the warranty is written – and we don’t pick up a tool until you’ve seen all three.

Written by the team at Rowan Construction Group Plano, serving Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch