A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Full Kitchen Remodeling in Plano, TX

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Full Kitchen Remodeling in Plano, TX

A full kitchen remodel in Plano typically runs $48,000 to $115,000 for a standard 200 to 350 square foot kitchen, with most West Plano and Willow Bend projects landing near $70,000 once cabinets, counters, electrical, plumbing and flooring are all replaced. A full remodel means the room comes down to the studs and the layout can change; it is not a facelift. If your 1990s kitchen still has a dropped fluorescent ceiling box, a peninsula blocking the work triangle, and laminate counters that have lifted at the sink seam, you are in full-gut territory.

We’re Rowan Construction Group Plano, and we do this work under The Haven Standard: a written price and written scope before anyone picks up a tool. That matters in a room where hidden surprises (a cut joist under the subfloor, aluminum branch wiring, a drain line run through the cabinet box) routinely turn a fixed bid into a moving number. Under Clause 1, the price is written before we start. No change proceeds until you sign a change order. That single discipline is why our projects land within a few percent of the agreed cost, across 4,000-plus jobs since 2007.

Our technicians have up to 19 years of experience, and every crew member is background-checked and arrives in uniform. Calls are answered by a live person 24/7, and every visit includes a documented photo record as a standard deliverable. For the broader picture of how this service sits alongside the rest of our work, see our Kitchen Remodeling page.

Key Takeaways

  • Full kitchen remodels in Plano run roughly $48,000 to $115,000; layout changes, panel upgrades and appliance packages drive the spread.
  • You get a flat written price and written scope before work starts, plus a written warranty.
  • We source cabinets from KraftMaid and Wellborn, counters from Cambria and Caesarstone, and fixtures from Kohler and Toto, so the quote reflects real material costs, not padded allowances.
  • Every visit ends with a photo record and a 365-Day Done Right Promise: if it’s not done right, we make it right.
Installers leveling a new base cabinet during a kitchen remodel

When You Need Full Kitchen Remodeling

Most of our Plano full-kitchen calls share a few recognizable triggers. Here’s what we hear most, and what each one usually means.

  • The layout fights you daily. A peninsula or island sits where traffic bottlenecks near the fridge, and the work triangle (sink to stove to fridge) is broken. Fixing it means moving plumbing or electrical, which is a gut job, not a refresh.
  • Cabinet boxes are failing, not just dated. Particleboard boxes that have swelled at the sink base, doors that won’t close square, and shelves sagging under cast iron. If the boxes are soft, refacing won’t hold; you need new cabinetry.
  • Counters are cracked, chipped, or lifting at seams. Laminate or old solid-surface counters separating at the sink seam usually signal moisture underneath. A full remodel lets us inspect the cabinet box and substrate together.
  • The electrical can’t carry a modern kitchen. Plano’s older housing stock often has a 100-amp service with no dedicated circuits for a microwave, dishwasher, disposal and induction range running at once. A full remodel is the right time to upgrade the panel and add the outlets the room actually needs.
  • You’re combining a wall or opening the room. Taking down a wall between the kitchen and dining room, or opening to a living area, is structural work: header, posts, permits, inspection. That is a full remodel by definition.
  • Aging plumbing under the sink. Galvanized supply lines or a drain run that’s been patched twice are worth replacing while the cabinets are out. Doing it later means tearing out a brand-new kitchen.

Our Full Kitchen Remodeling Process

  1. Walkthrough and written scope. We measure the room, photograph what we find (the substrate under the current floor, the panel, the drain run), and note the condition of each in plain terms. You get a written price and written scope before any work starts.
  2. Design and material selection. You choose from our vetted brands: KraftMaid or Wellborn cabinets, Cambria or Caesarstone counters, Kohler or Toto fixtures, and flooring that suits a Plano climate. We put the selections and their real costs into the written quote rather than using padded allowances.
  3. Permits and scheduling. We pull the permits the City of Plano requires for structural, electrical and plumbing changes, and lay out the sequence: demo, rough-in, inspection, drywall, cabinets, counters, tile, trim, punch list. You get a written schedule, not a verbal one.
  4. Demolition and rough-in. Crews remove the old kitchen and open the walls, and here’s where the photo record earns its keep. If demo uncovers a cut joist, a hack job on the previous wiring, or a drain that needs re-routing, we photograph it, show you, and write a change order. Nothing moves until you sign.
  5. Build-out and installation. Cabinets set level and plumb, counters templated and fabricated to the actual room, tile laid over the correct membrane, appliances and fixtures installed, and the electrical and plumbing trimmed out and tested.
  6. Punch list and documentation. We walk the finished kitchen with you, close out the punch list, and hand over the documented photo record of what was found and what was done, plus the written warranty. That’s the 365-Day Done Right Promise in practice: if something isn’t right within a year, we make it right.
A freestanding soaking tub in a remodeled primary bathroom

Full Kitchen Remodeling Pricing in Plano

Here are honest ranges for full kitchen remodels in Plano, by scope. These are flat written prices, not estimates to be re-quoted after demo.

Scope Typical Range What’s Included
Essential full remodel (200-250 sq ft, same layout) $48,000 – $68,000 New cabinets, counters, sink and faucet, flooring, backsplash, paint, minor electrical
Mid-range full remodel (250-350 sq ft, layout tweak) $68,000 – $90,000 Adds panel upgrade, moved sink or range, new appliances, under-cabinet lighting, tile floor
High-end / structural (350+ sq ft, wall removed) $90,000 – $115,000+ Adds structural header, beam, relocated plumbing, custom cabinetry, stone counters, premium appliances

What moves the number up: a load-bearing wall removal, an electrical panel upgrade, moving the sink or range (which means new plumbing runs), custom versus semi-custom cabinetry, natural stone versus quartz, and a layout that requires new tile over a large floor. What moves it down: keeping the existing layout and plumbing locations, semi-custom KraftMaid or Wellborn cabinets instead of full custom, and reusing appliances that still have life in them.

We also offer a Free Second Opinion on any written estimate: bring a competitor’s quote and we’ll review it line by line at no charge, so you can compare allowances, exclusions and what was left out. If you’re weighing a gut remodel against a smaller update, our Kitchen Remodeling in Plano guide walks through the difference. Get a written price before you decide.

FAQs – Full Kitchen Remodeling

How much does a full kitchen remodel cost in Plano, TX?

A full kitchen remodel in Plano typically costs $48,000 to $115,000, with most projects landing between $68,000 and $90,000 depending on size, layout changes and material level. Structural work, panel upgrades and moved plumbing push the number toward the top of the range. Call (844) 761-8346 for a written price – estimates are free, and the number is in writing before any work starts.

Is it cheaper to remodel the kitchen or move?

In most Plano cases, remodeling costs less than moving, especially if you bought in the last decade and would pay transaction costs, moving costs and a higher mortgage rate on a new home. A $70,000 remodel that fixes the layout and brings the kitchen to current standards often beats a move that costs $80,000 or more in fees and rate differential. Call (844) 761-8346 and we’ll put a written price on the remodel so you can compare the two honestly.

Can you do a full kitchen remodel while we live in the house?

Yes. Most of our Plano customers stay in the home during a full kitchen remodel, and we plan the sequence so a temporary kitchen setup (fridge, microwave, a sink in a utility area) keeps working through the gut phase. The heaviest disruption is the demo and rough-in window, usually a week or two. We’ll walk you through the schedule in writing before we start. Call (844) 761-8346 to talk through your timeline.

How long does a full kitchen remodel take in Plano?

A full kitchen remodel in Plano usually takes six to ten weeks from demo to punch list, with custom cabinetry and structural work pushing toward the longer end and a same-layout remodel landing near the shorter end. Permit review with the City of Plano and cabinet fabrication lead times are the two biggest schedule variables. Call (844) 761-8346 for a written schedule alongside your written price.

If you’re ready to put a real number on your Plano kitchen, call Rowan Construction Group Plano at (844) 761-8346 for a free estimate. You’ll get a flat written price and written scope before anyone picks up a tool, a documented photo record on every visit, and the 365-Day Done Right Promise behind the finished room. Browse our home page to see the full set of trades we cover, and bring any competitor’s quote for a line-by-line second opinion at no charge.

Written by the team at Rowan Construction Group Plano, serving Plano.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346
Local Service Coverage

Request a Free Estimate in Plano

Tell us what you need - Rowan Construction Group Plano responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch