A Rowan company - serving Plano, TX
A new herringbone paver driveway
Driveway & Pavers · Allen, TX

Driveway & Pavers in Allen - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new paver patio with a seat wall and fire pit
A new paver pool deck
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Driveway & Pavers Across Allen

If you live in Allen, you already know the driveway is the first thing that fails. The slab cracks at the apron, the pavers rut after a wet spring, and suddenly your curb appeal is working against you. We build and rebuild driveways, walkways, patios, and pool decks across Allen with a written price before anyone touches the ground, and a documented photo record when the crew leaves. Call (844) 761-8346 for a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Allen’s Preferred Driveway & Pavers Company

A crew setting pavers over a compacted base

Allen is a specific kind of town, and it produces a specific kind of driveway problem. Most of the housing was built in two compressed waves: the late-1990s and early-2000s brick traditional subdivisions like Twin Creeks, Bethany Ridge, and Watters Crossing, then a newer infill and teardown-rebuild wave around the old downtown at Main and Belmont. That means Allen isn’t a restoration market. It’s a first-cycle renovation market, and driveways here are hitting the reuse-by date all at once.

We’ve built our reputation in Allen on one thing homeowners can actually verify: a flat written price before work starts, a written scope, and a written warranty. Every job gets a signed change order if the scope moves. No work proceeds on a change until that signature is on the page. Our technicians have up to 19 years of experience on paver and concrete systems, and they arrive background-checked and uniformed. When you call, a live person answers, and when the job is done you get the photo record of what was found and what was done. Under our 365-Day Done Right Promise, if something isn’t right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Driveway & Pavers Services in Allen

Paver Driveways

Paver driveways are the upgrade most Allen homeowners ask about first, and they’re also where base work separates a good job from a failed one. Because Allen sits on North Texas blackland clay, the paver itself is surface; the compacted aggregate base, the grading, and the edge restraint are what hold the plane. In Twin Creeks and Bethany Ridge we regularly see 20-to-30-year-old lots where the pavers rut and migrate along the apron because the original base was never built for today’s loads. A proper build here means a test pit to read the subgrade, corrected drainage, and a base spec in writing before material is ordered.

Paver Driveways

Concrete Driveways & Concrete Work

Concrete is still the standard on Allen’s 1990s and 2010s brick traditional lots, but the clay is unforgiving. Slabs poured without expansion relief or proper reinforcement crack and heave as the wet-dry cycle moves the ground. We scope the concrete mix, the joint layout, and the subgrade compaction in writing, then tie the new slab into the garage edge so the seam doesn’t open. If you’re in the 75013 or 75002 ZIP and the existing slab has already failed, we’ll tell you honestly whether it’s a repair or a replacement.

Concrete Driveways & Concrete Work

Asphalt Driveways & Resurfacing

Asphalt is common on Allen’s older ranch lots near downtown and on longer rural-style driveways toward Lucas. Resurfacing adds years when the base is sound; when the base has failed, sealing or overlaying it just hides the problem for a season. We check the base first, resurface or repave the right way, and put the scope of work in writing so you know exactly what you’re paying for.

Asphalt Driveways & Resurfacing

Driveway Repair & Replacement

Allen repair calls usually start with the same complaint: the driveway cracks at the apron or ruts after a wet spring. In most cases that’s a base-and-drainage problem, not a surface problem. A qualified local contractor pulls a core or test pit to read the base, corrects grading and compaction, and ties the new apron into the existing slab or garage edge. We give you the written scope, the base spec, and a flat price before ordering anything.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Allen

Driveway work lives or dies on the materials under the surface. We source hardscape and concrete materials from vetted brands, including Oldcastle hardscape and Quikrete and Sakrete bagged concrete products, and we name the material and spec in the written quote so you can compare bids line by line. We don’t carry stock or keep a yard. We connect Allen homeowners with independent local professionals who order the right material for the job and get it to your driveway on the schedule the scope calls for.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Driveway & Pavers Problems We See in Allen Homes

  • Clay-soil heave under a 1990s Twin Creeks or Bethany Ridge driveway. The expansive blackland clay shrinks and swells with every wet-dry cycle, cracking the slab or rutting the pavers long before the surface itself wears out. The fix is almost always in the base and grading, not the topping.
  • Paver driveways installed without a compacted aggregate base and edge restraint. Pavers migrate and settle along the apron, especially with DFW’s wet-dry cycling. Once the edge restraint fails, the whole field starts to move.
  • Failed aprons and joints on original 1990s slabs. Many of Allen’s original driveways were poured without expansion relief for today’s heavier vehicle loads. The joint at the apron and the garage edge is usually the first place it shows.
  • Long-lead stone and paver selections ordered before the scope is fixed. When the homeowner upgrades the paver line mid-job without a signed change order, the price moves and the schedule slips. That’s why we lock the selection and the allowance in writing first.

Pricing for Driveway & Pavers in Allen, TX

A finished backyard cottage with a small covered porch

Allen driveway pricing tracks the base and drainage work more than the visible surface, so treat any quote that skips the base spec as incomplete. Here’s what a typical job runs in Allen’s market:

Service Typical Allen Price Range
Paver Driveway Installation $7,000 – $18,000
Concrete Driveway Installation $4,500 – $12,000
Driveway Replacement $5,000 – $14,000
Driveway Sealing $250 – $700
Paver Patio Installation $3,500 – $11,000

What moves the number: the footage and slope, the condition of the base, whether a test pit reveals failed subgrade, and the paver or concrete selection. We hand you a flat written price and a written scope before work starts, and a signed change order is required before any change proceeds. Estimates in Allen are free.

We Also Serve Cities Near Allen

We serve homeowners across the surrounding area, including Fairview, Lucas, Plano, and Murphy. If you’re in one of these communities and want the same written-price approach, our Driveway & Pavers team can scope it for you. You can also see everything we do for Allen homeowners on the city page.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Driveway & Pavers in Allen

A new roof with clean valleys and new flashing

Why Allen Chooses Rowan Construction Group Plano

We set the standard for driveway & pavers in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your driveway & pavers project started is simple.

1

Call or Request a Free Estimate

Tell us about your driveway & pavers project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local driveway & pavers pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new stained cedar privacy fenceA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patioA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Driveway & Pavers in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(844) 761-8346

Request a Free Estimate in Allen

Tell us about your driveway & pavers needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch