A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Melissa, TX

Kitchen Remodeling in Melissa - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A remodeled hall bathroom with subway tile and a floating vanity
A garage converted into a guest room and home office
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Melissa

Kitchen remodels in Melissa run $14,000 – $45,000 for a full project, and most take three to eight weeks from demo to final inspection. Rowan Construction Group Plano works Melissa homeowners through The Haven Standard: a flat written price and a written scope before anyone picks up a tool, no work on a change until the change order is signed, and a documented photo record of every visit. Our technicians have up to 19 years of experience, and we know this stretch of the US 75 corridor – from the new subdivisions off SH 121 to the older homes near McKinney Street – well enough to plan for what’s actually under your floor. Call (844) 761-8346 to schedule your free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Melissa’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

Melissa is one of the fastest-growing towns on the US 75 corridor north of McKinney, and that growth shapes every kitchen project here. Most of the homes we’re asked to remodel are new-construction builds on freshly graded former farmland, which means the work skews toward first-round upgrades rather than renovation of old stock: finishing out builder-grade cabinets, relocating a sink, adding an island the builder never offered. Our technicians have up to 19 years of experience in exactly this kind of project.

Under the Haven Standard, every Melissa kitchen gets a flat written price and written scope before work begins, and no change proceeds until the change order is signed – the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs. We answer calls 24/7 with a live person, and every visit includes a documented photo record as a standard deliverable, so you can see what we found under a floor or inside a wall rather than take our word for it. Bring a competitor’s written estimate and we’ll review it line by line at no charge through our Free Second Opinion. You’ll get a text confirmation, not a phone promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Kitchen Remodeling Services in Melissa

Most of our Melissa work centers on kitchen design, full remodels, and island installs – the three things homeowners here ask for most. Here’s how each one fits the local ground conditions and the county permitting pipeline.

Kitchen Design & Layout

Layout comes first in a Melissa kitchen, and that means measuring floor flatness before anyone draws a cabinet run. On slab-on-grade homes built on fresh fill around the SH 121 corridor, that check tells us whether cabinets will rack within a season. We also verify which walls are load-bearing before a relocated rough-in forces a header discovery mid-job.

Full Kitchen Remodeling

A full remodel typically runs $14,000 – $45,000 in Melissa and covers cabinets, countertops, backsplash, flooring, and any plumbing or electrical relocation. We scope the work in writing with clear allowances, so a slab that has moved since the builder turned the home over becomes a documented change order instead of a surprise. County permits and inspection sign-off are handled before the walls close.

Kitchen Island Installation

Island installs run $3,000 – $10,000 in Melissa and depend on what the slab can support after settlement. We check for level and for any drainage or soil issues before anchoring, since a heavy island on a still-moving slab is a fast way to crack tile and rack doors. If a plumbing or electrical rough-in is involved, that’s planned into the written scope.

Cabinets & Countertops

Cabinets run $4,000 – $13,000 and countertops $2,000 – $6,500 in Melissa, with quartz and granite the most-requested choices in the newer subdivisions. We source through over fifty vetted brands, including KraftMaid and Wellborn for cabinetry and Cambria and Caesarstone for counters, so the written quote carries honest numbers.

Backsplash, Tile & Flooring

Backsplash installs run $800 – $2,500. Before any tile goes down, we check that the substrate is flat – a slab that has shifted on blackland clay will telegraph through a large-format floor tile if the prep is rushed. That check happens before pricing, not after.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Melissa

We work with over fifty vetted material brands, and the Melissa projects tend to lean on a handful of them: KraftMaid and Wellborn cabinets, Cambria and Caesarstone counters, Kohler and Toto fixtures. We don’t stock parts locally and we don’t claim to – the sourcing depth is what lets us put honest numbers in a written quote instead of inflated ones. If you’ve chosen a specific cabinet line or countertop slab, tell us at the estimate and we’ll price it accurately. For homeowners exploring modular options, brands like Plant Prefab and Boxabl factor into some addition and finish-out conversations, though a standard kitchen remodel doesn’t typically need them.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Kitchen Remodeling Problems We See in Melissa Homes

  • Layouts drawn before the slab is checked. On freshly graded Melissa lots, expansive blackland clay and new fill are still settling, so cabinet runs and tile floors go out of level and doors and drawers rack within a season. Measuring floor flatness first is the fix.
  • Loosely written allowances. When a scope is written around vague cabinet, countertop and backsplash allowances, every upgrade selection turns into an unplanned change order. The written scope has to name the numbers.
  • Load-bearing headers discovered mid-job. Opening a wall for a relocated rough-in on a builder-grade Melissa home can reveal a header that wasn’t in the original plan. Verifying which walls are load-bearing before layout keeps the timeline honest.
  • Schedules that ignore the county pipeline. Remodel timelines in Melissa that don’t account for county permitting and inspection sign-off can leave a punch list stranded behind a stalled framing or rough-in inspection. Permits get planned into the schedule, not bolted on.

Pricing for Kitchen Remodeling in Melissa, TX

A walk-in shower with large-format tile and a built-in niche

Here’s what kitchens actually cost in Melissa. Every Rowan project gets a flat written price and written scope before work starts – “call for a quote” isn’t an option here. No work proceeds on a change until the change order is signed.

Service Typical Melissa range
Full Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

What moves the number in Melissa: slab condition and any leveling, load-bearing wall changes, whether plumbing or electrical gets relocated, and material selection. Bring a competitor’s written estimate and we’ll review it line by line at no charge. Call (844) 761-8346 for a free estimate.

We Also Serve Cities Near Melissa

We work across the US 75 corridor and the surrounding Collin County towns. If you’re just outside Melissa, our Kitchen Remodeling in Melissa coverage extends to McKinney, Princeton, Allen, Fairview and the surrounding communities, and the same written-price discipline applies in all of them. Call (844) 761-8346 to schedule your free estimate.

Serving Melissa, TX – Our Local Coverage Area

We serve Melissa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Kitchen Remodeling in Melissa

A remodeled family room with new windows and a window seat

Why Melissa Chooses Rowan Construction Group Plano

We set the standard for kitchen remodeling in Melissa.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Melissa

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Melissa Customers Say

Trusted by homeowners across Melissa and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A freestanding soaking tub in a remodeled primary bathroomA second-story addition that matches the existing rooflineA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porch

More services in Melissa

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Melissa?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Melissa.

(844) 761-8346

Request a Free Estimate in Melissa

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch