







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Richardson
If you own a home in Richardson and the lot is fixed but the house isn’t working anymore, an addition or ADU is the move. We build both across 75080, 75081, and 75082, from garage conversions in the older post-war blocks to rear additions in the newer east-side subdivisions near the President George Bush corridor. We know Richardson’s permitting desk, its clay soils, and its HOA review boards. Call (844) 761-8346 to schedule a free estimate and get a written price before anything is ordered.
Why Rowan Construction Group Plano Is Richardson’s Preferred Home Additions & ADU Company

Richardson homeowners research contractors the way they research appliances. They read the three-star reviews, and they want a number on the page before they call. That fits how we work: under Clause 1 of The Haven Standard, the price is written before anyone picks up a tool, on every trade we run. Every project comes with a documented photo record on each visit, background-checked and uniformed technicians, and a live person answering the phone around the clock.
The additions that hold up in Richardson get their scope settled early. We walk the attic, the subfloor, and the existing foundation before we quote, because the slab and drain conditions under these 1960s and 1970s ranches tell you more about the real cost than any finish schedule. Bring a competitor’s written estimate and we’ll review it line by line at no charge.
Our technicians have up to 19 years of experience, and every written quote carries a flat price, a written scope, and the 365-Day Done Right Promise printed on it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Richardson
Most of the work we price in Richardson splits into four jobs. The right one depends on your lot, your HOA, and how much of the existing house you’re willing to touch.
ADU Design & Permitting
An ADU (accessory dwelling unit) needs a design that clears plan review the first time. In Richardson that means an engineer’s foundation design suited to shrink-swell clay, a utility plan showing how you’ll extend water, sewer, and power, and a submission packet the city can actually process. We handle the drawing set and the permit run together so the schedule holds. Design and permit work typically runs a few weeks before framing starts.

Garage Conversion ADU
The cheapest square footage on a Richardson lot is usually already attached to the house. A garage conversion turns an existing slab and envelope into living space, which is why it prices lower than a detached unit. Garage Conversion in Richardson runs $30,000 – $80,000 and hinges on insulation, a new heating and cooling setup, plumbing rough-in if you want a kitchenette or bath, and making sure the conversion doesn’t quietly break the remaining builder warranty on a newer 75082 home. We check that before we cut anything.

New Detached ADU
A detached ADU is a small house with its own foundation, utilities, and envelope, so it carries small-house pricing. ADU Construction in Richardson runs $90,000 – $220,000. The range swings on site work: running a new sewer lateral, adding an electrical meter, and engineering a post-tension slab over clay that has moved since the lot was graded. On a build-out suburb like Richardson, the setbacks and lot coverage rules decide whether a detached unit fits at all, so we check the plat before you commit to a design.

Junior ADU & Interior Conversion
If you want separate living space without a separate building, an interior conversion reworks part of the existing house: a bedroom suite with its own entry, a kitchenette, or a converted utility room. It’s the lowest-cost path and often the fastest through permitting, since you’re not adding a footprint. We map the plumbing and electrical you already have before drawing the layout, which keeps the work inside the walls you can afford to open.
For the full menu, including room additions, second-story additions, and sunrooms, see our Home Additions & ADU page.
Trusted Brands We Service in Richardson
Good ADUs and additions are built from named materials, not adjectives. We source from fifty-plus vetted brands, so the written quote shows real products: Quikrete and Sakrete for the concrete and grout that tie a new slab or pier system into the existing foundation, and Abodu where a prefab detached ADU is the right answer for the lot. For an interior finish schedule on a Junior ADU, KraftMaid and Wellborn cabinets and Cambria counters give the quote honest numbers. Name the product on the page and the customer can check it. Call (844) 761-8346 for a written, line-item estimate.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Richardson Homes
Richardson’s construction story is redevelopment. The suburbs here are built out, so additions happen on lots that already have a house, a driveway, and a foundation that has been settling since the original pour. Four problems come up again and again:
- Clay soil that has already moved. North Texas clay shrinks and swells through the wet-dry cycle, and the slab under a 1960s ranch may have been re-leveled once already. A new addition has to be engineered to meet the existing foundation where it actually sits, not where the drawings assume it sits.
- The hidden cast-iron sewer line. In older 75080 and 75081 blocks, the pattern is a homeowner planning a modest addition who finds the original cast-iron drain line failing under the slab. The plumbing scope, not the framing, becomes the real cost.
- Framing before HOA approval. In the master-planned east-side subdivisions, starting work before the architectural-review committee signs off can force a rebuild of an exterior elevation. The submission has to come first.
- Additions that void a builder warranty. Touching the builder’s structural or envelope work on a newer home can void the remaining warranty on the original house. We read the warranty terms before we scope the tie-in.
Pricing for Home Additions & ADU in Richardson, TX

Home Addition work in Richardson runs $45,000 – $130,000, and ADU Construction runs $90,000 – $220,000. Where you land in that range depends on foundation engineering, utility rough-in, and how much of the existing house has to open up. We put a flat price and a written scope in front of you before work starts, and no change proceeds until you sign a change order. Here’s how the common items price in Richardson’s market:
| Service | Richardson Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
| Kitchen Remodel | $14,000 – $45,000 |
| Bathroom Remodel | $9,000 – $28,000 |
| Window Replacement | $4,500 – $15,000 |
Those numbers are the same ones we put on the written estimate, because the quote is a flat price with a written scope and a written warranty. Call (844) 761-8346 to schedule your free estimate. Estimates are free, and a written second opinion on a competitor’s quote costs nothing.
We Also Serve Cities Near Richardson
We also build Home Additions & ADU in Richardson and the cities around it: Plano, Garland, Murphy, and Sachse. Each has its own permit desk, its own clay-soil quirks, and its own HOA rules, and we price each one on its own terms. If you’re just over the Richardson line, call (844) 761-8346 and we’ll tell you what applies where you live.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Richardson

It can, if the conversion touches the builder’s structural or envelope work without a documented boundary. On a newer 75082 home, we read the warranty terms first and scope the conversion so it stays clear of the builder’s obligations. Anything that does cross that line gets called out in writing before work starts. Call (844) 761-8346 for an exact quote, with estimates free.
An architectural-review submission approved before framing begins, in almost every master-planned subdivision on the east side. The committee wants elevation drawings, materials and colors, setbacks, and typically a site plan showing lot coverage. Starting ahead of approval can force a rebuild of the exterior elevation. We prepare the submission packet as part of the job. Call (844) 761-8346 to schedule your free estimate.
Because Richardson is built out, and redevelopment costs more than greenfield. On an already-developed lot, the work starts with demo and re-permitting, and the new addition has to tie into a foundation that has been moving on clay since the 1960s or 1970s. Frisco’s new-build subdivisions start from a graded pad and a fresh slab. That tie-in and the slab-and-drain surprises under older homes are what push the Richardson number up. Call (844) 761-8346 for an exact quote.
A flat price, the full scope of work, the draw schedule tied to inspection sign-off, the permit responsibility, and the warranty terms. Ours are written into every estimate, and no change proceeds until the change order is signed. That discipline is why our projects land within a few percent of the agreed cost. Call (844) 761-8346 to schedule your free estimate.
Windows and the envelope, because original single-pane glass and builder-grade envelope materials are the first thing to replace on a newer 75082 home. Window Replacement in Richardson runs $4,500 – $15,000, and it pays back in comfort and utility bills before any finish upgrade does. Kitchen and bath finishes come next. Call (844) 761-8346 for a written second opinion on any estimate you’re holding.
Written by the team at Rowan Construction Group.












